Elevator apt, fireproof without stores
Cooper Park (NYCHA)
60 KINGSLAND AVENUE · East Williamsburg · BIN 3339336
💬 Discuss this project
1950Year Built
8Stories
D3Building Class
R6Zoning
611,340 sfGross Floor Area
700Units
LL97 Covered16 Open Violations 12 unresolved · 4 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 510,960 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 1Under Construction1p · 1 filing · 20 docs
CellarUnder Construction83p · 3 filings · 20 docs
Site & exteriorUnder Construction41p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA5507/08/2026
NYC Housing Authority703/21/2026
NEW YORK CITY HOUSING AUTHORITY103/22/2026
CITY OF NY COOPER PARK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CAMERON ENGINEERING1208/04/2025
ISMAEL LEYVA ARCHITECT'S P.C.405/29/2024
NDNY ARCHITECTURE + DESIGN PLLC207/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES LLC503/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
TAREK M ZEID P E503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC US, INCGeneral Contractor2107/08/2026
DYNAMIC CONTRACTING CORPPlumbing707/08/2026
JEMCO ELECTRICAL CONT INCGeneral Contractor307/08/2026
CORDOVA, MARIAElectrical203/21/2026
HALLERMAN, DElectrical203/21/2026
DYNAMIC CONTRACTINGGeneral Contractor203/22/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
SKYLINE P & H INCPlumbing203/22/2026
DAFFODIL GENERAL CONTRACTElectrical103/21/2026
INGLESE, PASQUALEElectrical103/21/2026
DYNAMIC ELEC. SYSTEM INCElectrical103/22/2026
JAMES STASIElectrical103/21/2026
WRUBEL, CHAIMElectrical103/21/2026
ZITO, ROCCOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DISTINCT ENGINEERING SOLU26411108/04/2025
AMARACON TESTING & INSPEC5842207/28/2023
Building Lifecycle
All (119)Filed (19)Permit Issued (26)Signed Off (1)Facade (FISP) (14)Violation (14)Inspection (7)Objection (8)Special Inspection (30)
06/22/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129631-I1
06/09/2026
Permit issued — Suspended Scaffold
B01129631-I1-SC
05/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2026
Permit issued — General Construction
B00903239-I1-ST
04/24/2026
Permit issued — Structural
B00903239-I1-GC
04/22/2026
Permit issued — General Construction
B00903184-I1-GC
03/05/2026
Permit issued — Plumbing
B00443566-S2-PL
02/03/2026
Permit issued — Mechanical Systems
B00443566-I1-MS
02/03/2026
Permit issued — General Construction
B00443566-S4-GC
12/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
08/18/2025
Special inspection requirement — Post-installed Anchors
Ramnarayan Tirumala
08/04/2025
Filed — Alteration
Bldg.2: Demolition of exist. HW tank,cold water supply & HW supply/return to the tank.Install new gas WH, HW recirculation pumps &associated valves in tank room; new gas piping to HWH;new HW & cold water supply/return piping to HWH; temporary HWH.
B00443568-P3
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
07/31/2025
Special inspection requirement — Post-installed Anchors
Ramnarayan Tirumala
07/25/2025
Permit issued — Plumbing
B00443568-I1-PL
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2025
Permit issued — Structural
B00443566-S1-ST
04/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/04/2025
Permit issued — Plumbing
B00443566-S2-PL
03/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/03/2025
Permit issued — Mechanical Systems
B00443566-I1-MS
03/03/2025
Permit issued — General Construction
B00443566-S4-GC
12/06/2024
Permit issued — Suspended Scaffold
B01129631-I1-SC
12/03/2024
Objection resolved — Addressed
12/02/2024
Objection raised — Other
11/18/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129631-I1
09/16/2024
Permit issued — General Construction
B00443566-S3-GC
07/25/2024
Permit issued — Plumbing
B00443568-I1-PL
07/15/2024
Violation issued (FDNY_NOV, closed)
07/08/2024
Permit issued — Structural
B00443566-S1-ST
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
06/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
YAZAN YANES
06/03/2024
Special inspection requirement — Masonry
YAZAN YANES
06/03/2024
Special inspection requirement — Concrete - Cast-In-Place
YAZAN YANES
05/31/2024
Filed — Alteration
Bldg.2: Demolition of exist. HW tank,cold water supply & HW supply/return to the tank.Install new gas WH, HW recirculation pumps &associated valves in tank room; new gas piping to HWH;new HW & cold water supply/return piping to HWH; temporary HWH.
B00443568-P2
05/30/2024
Objection resolved — Addressed
05/29/2024
Filed — Alteration
NYCHA Boiler Building # 2 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms
B00443566-P7
05/29/2024
Objection raised — Other
05/22/2024
Special inspection requirement — Post-installed Anchors
Ramnarayan Tirumala
05/17/2024
Special inspection requirement — Masonry
Ramnarayan Tirumala
05/17/2024
Special inspection requirement — Concrete - Cast-In-Place
Ramnarayan Tirumala
05/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
05/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ramnarayan Tirumala
05/03/2024
Permit issued — Plumbing
B00443566-S2-PL
04/30/2024
Filed — Alteration
NYCHA Boiler Building # 2 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms
B00443566-P6
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
04/05/2024
Special inspection requirement — Masonry
Ramnarayan Tirumala
04/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ramnarayan Tirumala
04/05/2024
Special inspection requirement — Concrete - Cast-In-Place
Ramnarayan Tirumala
04/01/2024
Permit issued — General Construction
B00443566-S4-GC
04/01/2024
Permit issued — Mechanical Systems
B00443566-I1-MS
03/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
10/25/2023
Permit issued — Plumbing
B00443568-I1-PL
08/21/2023
Permit issued — General Construction
B00443566-S3-GC
08/10/2023
Objection raised — Other
08/10/2023
Objection resolved — Addressed
08/08/2023
Permit issued — Plumbing
B00443568-I1-PL
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/09/2026
DOB NOWGeneral ConstructionPermit IssuedJEMCO ELECTRICAL CONT INC04/24/2026
DOB NOWStructuralPermit IssuedJEMCO ELECTRICAL CONT INC04/24/2026
DOB NOWGeneral ConstructionPermit IssuedJEMCO ELECTRICAL CONT INC04/22/2026
DOB NOWPlumbingPermit IssuedDYNAMIC CONTRACTING CORP03/05/2026
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC02/03/2026
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC02/03/2026
DOB NOWPlumbingSigned-offDYNAMIC CONTRACTING CORP07/25/2025
DOB NOWStructuralPermit IssuedDYNAMIC US, INC06/10/2025
DOB NOWPlumbingPermit IssuedDYNAMIC CONTRACTING CORP04/04/2025
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC03/03/2025
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC03/03/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM12/06/2024
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC09/16/2024
DOB NOWPlumbingSigned-offDYNAMIC CONTRACTING CORP07/25/2024
DOB NOWStructuralPermit IssuedDYNAMIC US, INC07/08/2024
DOB NOWPlumbingPermit IssuedDYNAMIC CONTRACTING CORP05/03/2024
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC04/01/2024
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC04/01/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/25/2023
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC08/21/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.08/08/2023
DOB NOWStructuralPermit IssuedDYNAMIC US, INC08/07/2023
DOB NOWPlumbingPermit IssuedDYNAMIC CONTRACTING CORP06/01/2023
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC04/28/2023
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC04/28/2023
BISOTISSUEDM.S.T GENERAL CONTRACTING03/05/2015
BISEQISSUEDM.S.T GENERAL CONTRACTING10/22/2014
BISOTISSUEDM.S.T GENERAL CONTRACTING10/20/2014
BISEQISSUEDM.S.T GENERAL CONTRACTING10/20/2014
BISEQISSUEDM.S.T GENERAL CONTRACTING10/20/2014
BISOTISSUEDM.S.T GENERAL CONTRACTING05/20/2014
BISEQISSUEDMETROPOLITAN ENTERPRISES02/26/2014
BISEQISSUEDM.S.T GENERAL CONTRACTING02/12/2014
BISEQISSUEDM.S.T GENERAL CONTRACTING02/12/2014
BISEQISSUEDM.S.T GENERAL CONTRACTING12/26/2013
BISEQISSUEDMETROPOLITAN ENTERPRISES05/07/2013
BISEQISSUEDMETROPOLITAN ENTERPRISES05/08/2012
BISEQISSUEDNAVICO B & S CONSTRUCTION10/03/2011
BISEQISSUEDMETROPOLITAN ENTERPR INC05/20/2011
+ 3 more permits on file
1 project · most recent 05/29/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2024Permit IssuedDYNAMIC US, INCHeating Systems
Heating
Us Draft TRV-8 205 BTU · Exhaust Fan ×2
1 project · most recent 08/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/04/2025Signed-offDYNAMIC CONTRACTING CORPGas, Water/Sanitary
6 projects · most recent 04/01/2025
General Wiring
FiledStatusContractorScope
04/01/2025CompletePOLARIS ELEC'L CONST CORP—
02/14/2025CompletePOLARIS ELEC'L CONST CORPGeneral Wiring
12/31/2024CancelledDYNAMIC ELEC. SYSTEM INCGeneral Wiring
02/22/2023CompleteTRU-VAL ELECTRIC CORP.General Wiring
10/08/2020CompleteJEMCO ELECT. CONTRS INC—
09/11/2020Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
1 project · most recent 05/29/2024
Steel Concrete
FiledStatusContractorScope
05/29/2024Permit IssuedDYNAMIC CONTRACTING CORPSteel, Concrete
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/18/2025Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
08/18/2025Post-installed AnchorsRamnarayan Tirumalaspecial
07/31/2025Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
07/31/2025Post-installed AnchorsRamnarayan Tirumalaspecial
06/03/2024Fire-Resistant Penetrations and JointsYAZAN YANESspecial
06/03/2024Fire-Resistance Rated ConstructionYAZAN YANESprogress
06/03/2024MasonryYAZAN YANESspecial
06/03/2024Concrete - Cast-In-PlaceYAZAN YANESspecial
05/22/2024Post-installed AnchorsRamnarayan Tirumalaspecial
05/17/2024MasonryRamnarayan Tirumalaspecial
05/17/2024Concrete - Cast-In-PlaceRamnarayan Tirumalaspecial
05/17/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
05/17/2024Fire-Resistance Rated ConstructionRamnarayan Tirumalaprogress
04/05/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
04/05/2024MasonryRamnarayan Tirumalaspecial
04/05/2024Fire-Resistance Rated ConstructionRamnarayan Tirumalaprogress
04/05/2024Concrete - Cast-In-PlaceRamnarayan Tirumalaspecial
03/26/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
07/18/2023Exterior lighting powerCONNIE PISANIenergy_progress
07/18/2023Lighting controlsCONNIE PISANIenergy_progress
07/18/2023Tenant Protection Plan ComplianceCONNIE PISANIspecial
07/12/2023PreliminaryCONNIE PISANIprogress
07/12/2023Fire-Resistance Rated ConstructionCONNIE PISANIprogress
07/12/2023Energy Code Compliance InspectionsCONNIE PISANIprogress
07/12/2023Tenant Protection Plan ComplianceCONNIE PISANIspecial
Latest 25 of 50.
▾Documents — 213 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch13
08/27/2026B00903184-I1Request digital key ↗
08/27/2026B00903239-I1Request digital key ↗
08/25/2026B00443566-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00443568-I1Request digital key ↗
09/01/2026B00443568-P3Request digital key ↗
08/15/2026B00443568-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026B00443566-I1Request digital key ↗
08/15/2026B00443566-P3Request digital key ↗
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION11
10/22/2014340107182Open ↗
05/31/2014320097890Open ↗
02/11/2014340115789Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
09/18/2014320831178Open ↗
02/11/2014340115789Open ↗
12/25/2013340107173Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
08/06/2015320097890Open ↗
08/06/2015320097890Open ↗
05/08/2015320831178Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00443568-P3Open ↗
09/01/2026B00443568-I1Open ↗
09/01/2026B00443568-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B00443568-P3Open ↗
09/01/2026B00443568-P3Open ↗
08/31/2026B00443566-P7Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026B00443566-P7Open ↗
08/28/2026B00443566-P6Open ↗
08/23/2026B00443566-S1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
02/11/2014340115789Open ↗
12/25/2013340107173Open ↗
—340107182Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/11/2014340115789Open ↗
12/25/2013340107173Open ↗
—340107182Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
02/11/2014340115789Open ↗
12/25/2013340107173Open ↗
—340107182Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/08/2011320365966Open ↗
11/20/2009320097890Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/08/2011320365966Open ↗
11/20/2009320097890Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan6
08/13/2026B00443568-P1Open ↗
08/13/2026B00443568-P3Open ↗
08/13/2026B00443566-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/01/2026B00443568-I1Open ↗
09/01/2026B00443568-P3Open ↗
09/01/2026B00443568-P2Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/20/2009320097890Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/08/2015320831178Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/08/2015320831178Open ↗
04/07/2015320831178Open ↗
12/12/2013320831178Open ↗
▸BISTR8: Energy Code Progress Inspections3
09/25/2014320831178Open ↗
09/25/2014320831178Open ↗
08/15/2013320831178Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/08/2015320831178Open ↗
04/07/2015320831178Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
—340107182Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/11/2014340115789Open ↗
12/25/2013340107173Open ↗
—340107182Open ↗
▸Approvals, Objections & Sign-offs58
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/01/2026B00443568-I1Open ↗
09/01/2026B00443568-P2Open ↗
09/01/2026B00443568-P3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
08/13/2026B00443566-P7Open ↗
08/13/2026B00443566-S2Open ↗
08/13/2026B00443566-S4Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
08/06/2015320097890Open ↗
05/08/2015320831178Open ↗
04/07/2015320831178Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/06/2015320097890Open ↗
10/22/2014340107182Open ↗
06/11/2014320831178Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/25/2026B00443566-S2Open ↗
08/25/2026B00443566-I1Open ↗
08/25/2026B00443566-S4Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
08/15/2013320831178Open ↗
10/06/2011320365966Open ↗
11/20/2009320097890Open ↗
▸BISThird Party Electrical Signoff Compliance Report2
01/28/2013320365966Open ↗
01/28/2013320365966Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00443568-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
05/08/2015320831178Open ↗
04/07/2015320831178Open ↗
08/15/2013320831178Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET3
02/11/2014340115789Open ↗
12/25/2013340107173Open ↗
—340107182Open ↗
▸BISEFILING COVER SHEET2
10/06/2011320365966Open ↗
11/20/2009320097890Open ↗
▸BISADDITIONAL INFORMATION2
10/27/2014320831178Open ↗
09/18/2014320831178Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01129631-I1Open ↗