Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Aldyn
60 RIVERSIDE BOULEVARD · BIN 1087835
💬 Discuss this project
2008Year Built
40Stories
RMBuilding Class
R10Zoning
451,749 sfGross Floor Area
263Units
LL97 CoveredRent Stabilized22 Open Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 36,864 sf lot · 12.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 2 filings · 9 docs
Floor 402p · 1 filing · 13 docs
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 294p · 1 filing · 8 docs
Floor 28
Floor 272p · 1 filing · 6 docs
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 201p · 1 filing · 8 docs
Floor 194p · 3 filings · 19 docs
Floor 18
Floor 17
Floor 16
Floor 15
Floor 141p · 1 filing · 6 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 9 docs
Floor 1
1 job · most recent 09/09/2020
Water/Sanitary
FiledStatusContractorScope
09/09/2020Permit IssuedPLUMBING & HTG DOCTOR INCWater/Sanitary
17 jobs · most recent 01/19/2026
General Wiring
FiledStatusContractorScope
01/19/2026Permit IssuedA&E ELECTRICAL SYSTEMS COGeneral Wiring
11/23/2025CompleteJUMPER ELECTRIC CORP—
10/27/2025Permit IssuedRM ELECTRIC CO., INC.General Wiring
09/17/2025CompleteEMPIRE LIC ELECL CONTRS—
02/22/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
11/01/2023CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
10/24/2023CompleteAMBER ELECTL CONTNG INC—
04/28/2023Pending PaymentPHILIP A. ROBINSONGeneral Wiring
04/02/2023Permit IssuedRONART ELECTRIC COGeneral Wiring
01/13/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
09/30/2022CompleteTM SELECT ELECTRIC CORP—
05/23/2022CompleteTM SELECT ELECTRIC CORP—
04/21/2022CompleteTM SELECT ELECTRIC CORP—
02/17/2022CompleteAPN ELECTRICAL CORPGeneral Wiring
09/28/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
Building Lifecycle
All (184)Filed (24)Permit Issued (20)Signed Off (13)Facade (FISP) (6)Violation (60)Inspection (13)Objection (18)Special Inspection (30)
09/01/2026
Filed — Alteration
General Construction work associated with new gypsum board ceiling and cove lighting installation. Renovation of existing 5 bathrooms and installation of interior door and trim.
M01401414-P1
08/28/2026
Special inspection requirement — Post-installed Anchors
GUNJAN KHANDWALA
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
arben sela
08/28/2026
Special inspection requirement — Final
arben sela
08/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
arben sela
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arben sela
06/16/2026
Permit issued — General Construction
M01401414-I1-GC
06/05/2026
Filed — Alteration
General Construction work associated with new gypsum board ceiling and cove lighting installation. Renovation of existing 5 bathrooms and installation of interior door and trim.
M01401414-I1
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arben sela
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
arben sela
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
arben sela
05/13/2026
Special inspection requirement — Post-installed Anchors
GUNJAN KHANDWALA
05/13/2026
Special inspection requirement — Final
arben sela
04/17/2026
Violation issued (HPD, open)
A
03/18/2026
Violation issued (ECB, closed)
Elevators
01/08/2026
Violation issued (ECB, closed)
Elevators
11/17/2025
Signed off — Alteration
Installation of trellis on existing 19th Floor Roof Terrace (Apartment 2102) as per plans. No change to use egress or occupancy on this filing.
M01125550-I1
11/10/2025
Signed off — Alteration
M01130802-I1
07/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/03/2025
Violation issued (HPD, open)
B
06/03/2025
Violation issued (HPD, open)
B
06/03/2025
Violation issued (HPD, open)
A
06/03/2025
Violation issued (HPD, open)
B
06/03/2025
Violation issued (HPD, open)
B
06/03/2025
Violation issued (HPD, open)
B
11/27/2024
Permit issued — General Construction
M01125550-I1-GC
11/20/2024
Permit issued — Structural
M01130802-I1-ST
11/14/2024
Objection resolved — Addressed
11/14/2024
Objection resolved — Addressed
11/12/2024
Objection raised — Zoning
11/12/2024
Objection raised — Fire_Protection
10/29/2024
Filed — Alteration
M01130802-I1
10/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
10/28/2024
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
10/23/2024
Filed — Alteration
Installation of trellis on existing 19th Floor Roof Terrace (Apartment 2102) as per plans. No change to use egress or occupancy on this filing.
M01125550-I1
10/22/2024
Special inspection requirement — Final
Christopher Drutjons
10/14/2024
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site Supervisor: Kenneth Cole.
M00982909-I1
09/11/2024
Violation issued (HPD, open)
B
07/23/2024
Violation issued (HPD, closed)
C
07/09/2024
Signed off — Alteration
Apartment renovation including modification to non-load bearing partitions, hung ceilings, flooring, doors, frames and hardware.
M00704412-I1
07/02/2024
Signed off — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING IN UNIT 1110
M00704856-I1
04/19/2024
Signed off — Alteration
SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00804907-I1
03/21/2024
Cycle 9 facade report signed — SWARMP
02/13/2024
Signed off — Alteration
PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00804904-I1
01/22/2024
Signed off — Alteration
MINOR RENOVATION OF AN EXISTING DUPLEX APT ON THE 19TH AND 20TH FLOORS, INCLUDING PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION,
M00804897-I1
01/11/2024
Permit issued — Suspended Scaffold
M00982909-I1-SC
01/11/2024
Permit issued — Suspended Scaffold
M00978503-I1-SC
01/03/2024
Cycle 9 facade report submitted
01/02/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site Supervisor: Kenneth Cole.
M00982909-I1
12/28/2023
Cycle 9 facade inspection completed
12/26/2023
Filed — Alteration
SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00804907-P1
12/26/2023
Filed — Alteration
MINOR RENOVATION OF AN EXISTING DUPLEX APT ON THE 19TH AND 20TH FLOORS, INCLUDING PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION,
M00804897-P1
12/26/2023
Special inspection requirement — Sprinkler Systems
SHAHIN BADALY
12/18/2023
Filed — Alteration
M00978503-I1
12/18/2023
Special inspection requirement — Post-installed Anchors
Michael Walsh
12/06/2023
Signed off — Alteration
REMOVAL OF OLD HVAC UNITS AND INSTALLATION OF HEAT UP CONDENSER AND 4 HEAT PUMPS, DUCTWORK AND 2 LINEAR DIFFUSERS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00357774-I1
10/13/2023
Special inspection requirement — Post-installed Anchors
SHAHIN BADALY
10/13/2023
Special inspection requirement — Sprinkler Systems
SHAHIN BADALY
10/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
10/13/2023
Special inspection requirement — Lighting controls
SHAHIN BADALY
Latest 60 of 184 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALLIED PARTNERS1609/15/2026
PINNACLE INDUSTRIES103/22/2026
BOVIS LEVEL LEASE LMB INC103/22/2026
PINNACLE INDUSTRIES 3 LLC103/22/2026
1601 RIVERSIDE1503/22/2026
RESIDENCE103/22/2026
ALDYN603/21/2026
HOAGIES PLACE LLC FRATTALI403/21/2026
EXTELL DEVELOPMENT COMPANY1803/21/2026
WINDSOR PROPERTY MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1003/21/2026
JAM CONSULTANTS, INC.803/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
RIGGING CONSULTANTS203/21/2026
RIGGINING CONSULTANTS103/21/2026
MICHAEL ZENREICH ARCHITECT203/21/2026
CODE203/21/2026
J. CALLAHAN CONSULTING, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MYRIAD CONSTRUCTION SERVIGeneral Contractor507/08/2026
NICON BUILD LLCGeneral Contractor404/09/2026
MONACO GROUP USA INCGeneral Contractor303/21/2026
PLUMBING & HTG DOCTOR INCPlumbing207/08/2026
PHILIP A. ROBINSONElectrical103/22/2026
RAYMOND WILSONElectrical103/21/2026
CASINO PLMBG & HTG CORPFire Protection107/08/2026
MESSEMER, MICHAELFire Protection103/21/2026
K.J. REMODELING OF NY CO*General Contractor107/08/2026
LUMITECH CONTRACTING CORPGeneral Contractor106/28/2026
QUINTEROS CONSTRUCTION OFGeneral Contractor107/08/2026
SBP NEW YORK LLCGeneral Contractor107/08/2026
TAP PLUMBINGGeneral Contractor103/22/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
LIQUID PLBG & HTNG SCS INPlumbing107/08/2026
APEX ELECT'L CONTR. INC.Electrical103/22/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
ARIAN HAMZARAJElectrical103/21/2026
E-J ELEC. INSTALLATION COElectrical103/22/2026
EMPIRE LIC ELECL CONTRSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDPLUS ARCHITECTURE PL7849209/01/2026
ASSURE PROFESSIONAL ENGIN6962209/01/2026
MILROSE CONSULTANTS LLC2003210/29/2024
BADALY ARCHITECT PLLC7137412/26/2023
PCS ENGINEERING3745112/18/2023
CATALPA SPECIAL INSPECTIO2004402/21/2023
KATZ ARCHITECTURE1371105/05/2021
JACK GREEN ASSOCIATES422112/23/2020
EUGENE KHANANOV ARCHITECT2816109/09/2020
CHRISTIAN L. MARTOS ENGIN5965110/10/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLUMITECH CONTRACTING CORP06/16/2026
DOB NOWGeneral ConstructionSigned-offNICON BUILD LLC11/27/2024
DOB NOWStructuralSigned-offNICON BUILD LLC11/20/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM01/11/2024
DOB NOWSuspended ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP01/11/2024
DOB NOWMechanical SystemsSigned-offMYRIAD CONSTRUCTION SERVI06/12/2023
DOB NOWSprinklersSigned-offCASINO PLMBG & HTG CORP04/22/2023
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN03/28/2023
DOB NOWGeneral ConstructionSigned-offQUINTEROS CONSTRUCTION OF03/15/2023
DOB NOWPlumbingPermit IssuedMATHEW WEISS11/28/2022
DOB NOWMechanical SystemsSigned-offMYRIAD CONSTRUCTION SERVI10/19/2022
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP05/20/2022
DOB NOWGeneral ConstructionSigned-offK.J. REMODELING OF NY CO*04/14/2022
DOB NOWMechanical SystemsSigned-offMYRIAD CONSTRUCTION SERVI01/11/2022
DOB NOWGeneral ConstructionSigned-offMONACO GROUP USA INC01/05/2022
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP11/08/2021
DOB NOWMechanical SystemsSigned-offMYRIAD CONSTRUCTION SERVI02/04/2021
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC11/23/2020
DOB NOWPlumbingPermit IssuedMATHEW WEISS10/09/2020
DOB NOWStructuralSigned-offSBP NEW YORK LLC03/26/2020
BISPLISSUEDTAP PLUMBING CORP08/06/2025
BISPLISSUEDDNA PLUMBING CONTR. INC11/13/2024
BISPLISSUEDFORTE EXPRESS P & H INC09/25/2023
BISOTISSUEDMYRIAD CONSTRUCTION SERVI04/06/2023
BISPLISSUEDDNA PLUMBING CONTR. INC02/15/2023
BISSPISSUEDASCO SPRINKLER CO.,INC12/13/2022
BISPLISSUEDFORTE EXPRESS P & H INC09/28/2022
BISOTISSUEDMYRIAD CONSTRUCTION SERVI03/10/2022
BISOTISSUEDMYRIAD CONSTRUCTION SERVI10/21/2021
BISSPISSUEDASCO SPRINKLER CO.,INC09/10/2021
BISOTISSUEDMYRIAD CONSTRUCTION SERVI09/02/2021
BISOTISSUEDTOTAL HOME IMPROVEMENT SE09/01/2021
BISPLISSUEDFORTE EXPRESS P & H INC08/30/2021
BISOTISSUEDTOTAL HOME IMPROVEMENT SE12/11/2020
BISOTISSUEDCORE DESIGN & BUILD INC12/10/2020
BISOTISSUEDCORE DESIGN & BUILD INC11/30/2020
BISOTISSUEDMYRIAD CONSTRUCTION SERVI10/19/2020
BISSPISSUEDASCO SPRINKLER CO.,INC09/02/2020
BISSPISSUEDFORTE EXPRESS P & H INC07/09/2020
BISPLISSUEDFORTE EXPRESS P & H INC07/09/2020
+ 30 more permits on file
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
09/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
08/28/2026Post-installed AnchorsGUNJAN KHANDWALAspecial
08/28/2026Energy Code Compliance Inspectionsarben selaprogress
08/28/2026Finalarben selaprogress
08/28/2026Fire-Resistance Rated Constructionarben selaprogress
08/28/2026Fire-Resistant Penetrations and JointsArben selaspecial
06/03/2026Fire-Resistant Penetrations and JointsArben selaspecial
06/03/2026Fire-Resistance Rated Constructionarben selaprogress
05/13/2026Energy Code Compliance Inspectionsarben selaprogress
05/13/2026Post-installed AnchorsGUNJAN KHANDWALAspecial
05/13/2026Finalarben selaprogress
10/28/2024Tenant Protection Plan ComplianceChristopher Drutjonsspecial
10/28/2024Structural Steel - DetailsChristopher Drutjonsspecial
10/22/2024FinalChristopher Drutjonsprogress
12/26/2023Sprinkler SystemsSHAHIN BADALYspecial
12/18/2023Post-installed AnchorsMichael Walshspecial
10/13/2023Post-installed AnchorsSHAHIN BADALYspecial
10/13/2023Sprinkler SystemsSHAHIN BADALYspecial
10/13/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
10/13/2023Lighting controlsSHAHIN BADALYenergy_progress
10/13/2023Lighting in dwelling unitsSHAHIN BADALYenergy_progress
10/13/2023FinalSHAHIN BADALYprogress
10/13/2023Energy Code Compliance InspectionsSHAHIN BADALYprogress
02/28/2023Fire-Resistant Penetrations and JointsSanford Bergerspecial
02/21/2023Lighting in dwelling unitsSanford Bergerenergy_progress
02/21/2023Fire-Resistant Penetrations and JointsSanford Bergerspecial
Latest 25 of 48.
▾Documents — 819 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch19
09/03/2026M00491792-I1Request digital key ↗
09/01/2026M00613697-P1Request digital key ↗
09/01/2026M00613697-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00394141-I1Request digital key ↗
08/15/2026M00363311-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00233778-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00357774-I1Request digital key ↗
▸Applications & Permits164
▸BISPLAN / WORK APPROVAL APPLICATION91
03/28/2025123131075Open ↗
08/23/2024123131075Open ↗
04/12/2023123131075Open ↗
Showing 3 of 91 on file for this type
▸BISWORK PERMIT APPLICATION68
08/06/2025123131075Open ↗
12/11/2020140969637Open ↗
11/30/2020140948125Open ↗
Showing 3 of 68 on file for this type
▸BISPLACE OF ASSEMBLY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications208
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION85
07/18/2019123891832Open ↗
07/12/2019123891832Open ↗
07/03/2019123891832Open ↗
Showing 3 of 85 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/15/2026M01401414-P1Open ↗
09/01/2026M00613697-I1Open ↗
09/01/2026M00613697-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M01401414-P1Open ↗
09/23/2026M01401414-P1Open ↗
09/23/2026M00804907-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026M01401414-P1Open ↗
09/23/2026M01401414-P1Open ↗
09/23/2026M01401414-P1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
07/05/2018140780563Open ↗
Showing 1 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/28/2020140969637Open ↗
10/22/2020140948125Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/05/2018140780563Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/28/2020140969637Open ↗
10/22/2020140948125Open ↗
▸Trade Schedules & Equipment56
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
05/15/2019123891832Open ↗
12/20/2018140780563Open ↗
09/10/2018123236710Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING18
08/23/2024123131075Open ↗
04/12/2023123131075Open ↗
11/30/2020123891832Open ↗
Showing 3 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/27/2019123236710Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/28/2026123131075Open ↗
▸BISEQUIPMENT USE PERMITS1
03/27/2019123236710Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/28/2026123131075Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes7
05/15/2019123891832Open ↗
10/28/2020140969637Open ↗
10/22/2020140948125Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00357774-I1Open ↗
08/13/2026M00233778-I1Open ↗
08/13/2026M00394141-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos25
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance57
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
05/15/2019123891832Open ↗
03/27/2019123236710Open ↗
03/27/2019123236710Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
03/27/2019123236710Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
01/28/2026123131075Open ↗
10/25/2023123891832Open ↗
03/23/2022140969637Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
10/28/2020140969637Open ↗
10/22/2020140948125Open ↗
07/05/2018140780563Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/29/2026123131075Open ↗
08/24/2023123891832Open ↗
03/18/2022140969637Open ↗
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
01/23/2026123131075Open ↗
10/25/2023123891832Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00491792-I1Open ↗
08/13/2026M00704412-I1Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/28/2026123131075Open ↗
▸BISINTERIOR LIGHTING POWER1
01/23/2026123131075Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY10
10/25/2023123891832Open ↗
08/09/2023123891832Open ↗
03/23/2022140969637Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/26/2026123131075Open ↗
08/09/2023123891832Open ↗
▸BISMECHANICAL SYSTEMS1
01/26/2026123131075Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/09/2023123891832Open ↗
▸Approvals, Objections & Sign-offs80
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST36
02/02/2026123131075Open ↗
10/25/2023123891832Open ↗
03/25/2022140969637Open ↗
Showing 3 of 36 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
10/22/2020140948125Open ↗
03/27/2019123236710Open ↗
03/27/2019123236710Open ↗
Showing 3 of 12 on file for this type
▸BISSUPERSEDING LETTER3
08/06/2025123131075Open ↗
09/03/2020123891832Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL2
01/26/2026123131075Open ↗
10/25/2023123891832Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT44
04/20/2021123189520Open ↗
11/24/2020123891832Open ↗
10/28/2020140969637Open ↗
Showing 3 of 44 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
02/02/2026123131075Open ↗
10/25/2023123891832Open ↗
03/18/2022140969637Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms104
▸BISEFILING COVER SHEET40
05/15/2019123891832Open ↗
05/15/2019123891832Open ↗
Showing 2 of 40 on file for this type
▸BISBOROUGH INTAKE FORM30
08/06/2025123131075Open ↗
09/03/2020123891832Open ↗
01/22/2020140780563Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION29
09/18/2025123131075Open ↗
05/08/2023123131075Open ↗
03/04/2021123131075Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/28/2020140969637Open ↗
09/10/2020140948125Open ↗
07/05/2018140780563Open ↗
Showing 3 of 5 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDHCR Document6
08/13/2026M00804897-P1Open ↗
08/13/2026M00394141-I1Open ↗
08/13/2026M00804904-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
03/25/2019123236710Open ↗
▸DOB NOWIRA Certification1
08/13/2026M00982909-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00978503-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00978503-I1Open ↗