← Back
BuildNYC
Elevator apt, semi-fireproof without stores
60 SEAMAN AVENUE
MANHATTAN · Inwood · BIN 1065071
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R7AZoning
65,489 sfGross Floor Area
61Units
LL97 CoveredRent Stabilized98 Active Violations 97 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: Inwood Park Associates · 15,200 sf lot · 4.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInwood Park Associates LLC3p · 2 filings · 8 docs
CellarInwood Park Associates LLC1p · 1 filing · 3 docs
Site & exteriorInwood Park Associates LLC8p · 3 filings · 8 docs
Filed — no permit issuedSidewalk sheds and temporary walkways22p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Inwood Park Associates2107/08/2026
Telcom Engineering103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Millennium Designs of New York103/21/2026
CCM Services Group203/21/2026
AE Design Solution403/21/2026
Millennium Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold2507/08/2026
Yossi Stern ConstructionGeneral Contractor203/21/2026
Davrial EnterprisesGeneral Contractor203/21/2026
Silvercup ScaffoldingGeneral Contractor103/21/2026
Ramapo Communicationspecialty_contractor107/08/2026
Nash Electric ServicesElectrical203/22/2026
Cross State ContractingGeneral Contractor104/18/2006
Faiz AhmedGeneral Contractor205/06/2014
Squan Construction ServicesGeneral Contractor105/04/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mohammad Ahead - Professi9286110/18/2025
KMB Design Group513205/19/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/08/2026
At time of inspection, observed sidewalk shed at exposure 1 of a 6-story building. Shed previously received a violation for no permit on…
ECB violation · open
08/18/2026
§ 27-2005 ADM code properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at basement
HPD violation · open
08/07/2026
Observed 6 story building with sidewalk shed erected at exp 1. Upon review records show gc or sidewalk shed permit has not been issued.
ECB violation · open
08/02/2026
Elevator Category 1 inspection report filed
229 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offRamapo Communication07/19/2023
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding06/15/2023
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding07/25/2022
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding06/21/2022
DOB NOWGeneral ConstructionSigned-offDavrial Enterprises06/07/2022
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding07/29/2021
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding06/21/2021
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding07/28/2020
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding07/24/2020
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding03/29/2019
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding03/29/2019
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding01/10/2019
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding01/08/2019
BISOTISSUEDSquan Construction Services05/04/2017
BISEQISSUEDFaiz Ahmed05/06/2014
BISOTISSUEDFaiz Ahmed05/06/2014
BISEQISSUEDYossi Stern Construction02/28/2014
BISOTISSUEDYossi Stern Construction02/28/2014
BISEQISSUEDSilvercup Scaffolding02/26/2014
BISOTISSUEDYossi Stern Construction12/10/2013
BISEQISSUEDYossi Stern Construction12/10/2013
BISEQISSUEDSilvercup Scaffolding05/21/2013
BISOTISSUEDCross State Contracting04/18/2006
2 projects · most recent 07/11/2024
FiledStatusContractorScope
07/11/2024Permit IssuedSolas Electrical—
01/09/2019CompleteNash Electric Services—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/16/2025Air barrier - visual inspection—energy_progress
10/14/2025Structural Stability – Alterations of existing buildingsMOHAMMAD AHEADspecial
10/14/2025MasonryMOHAMMAD AHEADspecial
10/14/2025Tenant Protection Plan ComplianceMOHAMMAD AHEADspecial
10/14/2025FinalADITYA DESAIprogress
04/06/2022MasonryEkata Shahspecial
03/30/2022FinalEkata Shahprogress
80 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account