← Back
Elevator cooperative
60 UNIVERSITY PLACE
MANHATTAN · BIN 1009265
💬 Discuss this project
1926Year Built
12Stories
D4Building Class
C1-7Zoning
56,252 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 21 EAST 10TH STREET OWNERS CORP · 5,525 sf lot · 10.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 2 filings · 12 docs
PenthouseUnder Construction30p · 3 filings · 16 docs
Floor 82p · 1 filing · 4 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY209/13/2026
J G CONSTRUCTION SRVCS407/08/2026
21 EAST 10 STREET OWNERS CORP4903/22/2026
21 E 10 ST OWNER CORP103/22/2026
221 EAST 76 STREET OWNERS103/22/2026
THE OWNER OF103/22/2026
OWNER OF 21 EAST 10 ST.203/22/2026
BERNINI CONSTRUCTION103/22/2026
DAVID EISENSTEIN RE CO103/22/2026
221 E 76 ST OWNERS IN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNCHRON EXPEDITING603/21/2026
JULIAN A. GOMEZ603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAND RESTORATION CORPGeneral Contractor307/08/2026
JTK HOME IMPROVEMENT INCGeneral Contractor303/21/2026
NORBERT GAJEWSKIElectrical103/21/2026
SWANE, WILLIAMElectrical103/21/2026
TORRES IVANElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
ANTHONY LUCIANOElectrical103/21/2026
AMN PLUMBING CORPPlumbing107/08/2026
JEROME KRITZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519105/04/2026
RAND ENGINEERING & ARCHIT266308/26/2025
ASE ENGINEERING PLLC5785208/19/2025
ADAL ENGINEERING PLLC4205101/19/2022
Building Lifecycle
All (111)Filed (10)Permit Issued (8)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (8)Special Inspection (11)
07/22/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01411648-P1
06/08/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
06/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/04/2026
Permit issued — Sidewalk Shed
M01411648-I1-SH
06/03/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01411648-I1
05/20/2026
Permit issued — Suspended Scaffold
M01396387-I1-SC
05/18/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/04/2026
Filed — Alteration
INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
M01396387-I1
05/02/2026
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
04/29/2026
Violation issued (HPD, closed)
A
03/02/2026
Permit issued — General Construction
M01252382-I1-GC
01/28/2026
Permit issued — Mechanical Systems
M01252670-I1-MS
01/27/2026
Permit issued — Structural
M01252722-I1-ST
08/26/2025
Filed — Alteration
M01252382-I1
08/19/2025
Filed — Alteration
M01252722-I1
08/19/2025
Filed — Alteration
M01252670-I1
08/11/2025
Special inspection requirement — Masonry
James Vignola
07/08/2025
Special inspection requirement — Post-installed Anchors
James Vignola
07/08/2025
Special inspection requirement — Structural Steel - Details
James Vignola
07/08/2025
Special inspection requirement — Structural Cold-Formed Steel
James Vignola
07/08/2025
Special inspection requirement — Structural Steel - Welding
James Vignola
07/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
alon egozi
07/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
James Vignola
07/08/2025
Special inspection requirement — Final
James Vignola
07/08/2025
Special inspection requirement — Structural Steel - High Strength Bolting
James Vignola
07/08/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
James Vignola
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
10/04/2022
Signed off — Alteration
M00637020-I1
10/04/2022
Signed off — Alteration
Plumbing work related to the renovation of the kitchen in apartment 8A.
M00641469-I1
08/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/11/2022
Filed — Alteration
Plumbing work related to the renovation of the kitchen in apartment 8A.
M00641469-P1
06/13/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/16/2022
Violation issued (HPD, closed)
A
02/07/2022
Permit issued — Plumbing
M00641469-I1-PL
01/21/2022
Permit issued — General Construction
M00637020-I1-GC
01/19/2022
Filed — Alteration
M00637020-I1
01/19/2022
Filed — Alteration
Plumbing work related to the renovation of the kitchen in apartment 8A.
M00641469-I1
04/13/2021
Cycle 9 facade report submitted
04/01/2021
Violation issued (HPD, closed)
A
03/17/2021
Cycle 9 facade report signed — SAFE
03/14/2021
Cycle 9 facade inspection completed
03/06/2021
Violation issued (ECB, closed)
Construction
03/06/2021
Violation issued (ECB, closed)
Construction
07/24/2020
Violation issued (ECB, closed)
Construction
06/11/2020
Permit issued — Sidewalk Shed
M00355731-I1-SH
06/10/2020
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00355731-I1
12/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2019
Violation issued (ECB, closed)
Construction
06/14/2019
Violation issued (HPD, closed)
B
06/14/2019
Violation issued (HPD, closed)
C
06/14/2019
Violation issued (HPD, closed)
C
06/14/2019
Violation issued (HPD, closed)
A
06/14/2019
Violation issued (HPD, closed)
A
06/14/2019
Violation issued (HPD, closed)
A
06/14/2019
Violation issued (HPD, closed)
A
06/14/2019
Violation issued (HPD, closed)
A
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP06/04/2026
DOB NOWSuspended ScaffoldPermit IssuedTAB RESTORATIONS INC05/20/2026
DOB NOWGeneral ConstructionPermit IssuedMAND RESTORATION CORP03/02/2026
DOB NOWMechanical SystemsPermit IssuedMAND RESTORATION CORP01/28/2026
DOB NOWStructuralPermit IssuedMAND RESTORATION CORP01/27/2026
DOB NOWPlumbingSigned-offAMN PLUMBING CORP02/07/2022
DOB NOWGeneral ConstructionSigned-offJTK HOME IMPROVEMENT INC01/21/2022
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS06/11/2020
BISPLISSUEDDYNAMIC BLUE WATER MECH03/22/2023
BISOTISSUEDMAND RESTORATION CORP12/31/2020
BISOTISSUEDMAND RESTORATION CORP09/21/2020
BISOTISSUEDMAND RESTORATION CORP06/17/2020
BISPLISSUEDMACREDDIN PLBG & HTG INC01/28/2019
BISOTISSUEDCOLEMAN CONTRACTING CORP01/25/2019
BISMHISSUEDTHINK CONSTRUCTION LLC09/19/2018
BISOTISSUEDTHINK CONSTRUCTION LLC09/19/2018
BISPLISSUEDORBIT PLBG & HTG INC09/13/2018
BISPLISSUEDM&G PLUMBING AND HEATING06/19/2018
BISOTISSUEDEXECUTIVE BUILDING06/14/2018
BISPLISSUEDPILATO BROS PLBG & HTG CO01/16/2018
BISOTISSUEDFONG CONSTRUCTION CORP12/26/2017
BISPLISSUEDORBIT PLBG & HTG INC09/25/2017
BISOTISSUEDTHINK CONSTRUCTION LLC09/15/2017
BISMHISSUEDTHINK CONSTRUCTION LLC09/15/2017
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR09/13/2016
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR08/10/2016
BISEQISSUEDNY SKYLINE GENERAL CONSTR06/20/2016
BISPLISSUEDPAUL QUINN PLBG & HTG INC07/25/2012
BISMHISSUEDJARLATH CONNAUGHTON07/18/2012
BISMHISSUEDGODFREY'S REFRIGERATION06/21/2012
BISPLISSUEDPRECISION PLBG SVCS., INC03/05/2012
BISOTISSUEDBULLFROG DEVELOPMENT INC02/22/2012
BISOTISSUEDG. BAUER, INC01/11/2012
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR10/28/2011
BISPLISSUEDMETROTECH MECHANICAL CORP09/08/2011
BISOTISSUEDMEATHWAY CONTRACTING INC09/02/2011
BISMHISSUEDMEATHWAY CONTRACTING INC09/02/2011
BIS—ISSUEDA.M.A HOLDINGS INC06/09/2011
BIS—ISSUEDA.M.A HOLDINGS INC06/09/2011
BISOTISSUEDA.M.A. HOLDINGS INC06/09/2011
+ 18 more permits on file
9 projects · most recent 06/03/2026
General Wiring
FiledStatusContractorScope
06/03/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
01/29/2026Permit IssuedJAM ELECTRICAL CORP—
11/17/2025Permit IssuedI&E ELECTRIC, INCGeneral Wiring
10/03/2022CompleteROBERT CHIMENTIGeneral Wiring
02/25/2022CompleteMAC ELECT'L CONTR. INC.—
01/27/2022CompleteMAC ELECT'L CONTR. INC.—
06/15/2020Permit IssuedRICHARD NEU—
03/20/2020CompleteECS ELEC'L CONTG SERV INCGeneral Wiring
08/07/2019CompletePRO ELECTRIC CORP.General Wiring
2 projects · most recent 07/22/2026
Sidewalk Shed
FiledStatusContractorScope
07/22/2026Permit IssuedACE GROUP NY CORPSidewalk Shed
06/10/2020Permit IssuedJ & G CONSTRUCTION SVCSSidewalk Shed
1 project · most recent 05/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/04/2026Permit IssuedTAB RESTORATIONS INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/08/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/18/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/13/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/02/2026Post-installed AnchorsYounes Abouyaalaspecial
08/11/2025MasonryJames Vignolaspecial
07/08/2025Post-installed AnchorsJames Vignolaspecial
07/08/2025Structural Steel - DetailsJames Vignolaspecial
07/08/2025Structural Cold-Formed SteelJames Vignolaspecial
07/08/2025Structural Steel - WeldingJames Vignolaspecial
07/08/2025Tenant Protection Plan Compliancealon egozispecial
07/08/2025Fire-Resistance Rated ConstructionJames Vignolaprogress
07/08/2025FinalJames Vignolaprogress
07/08/2025Structural Steel - High Strength BoltingJames Vignolaspecial
07/08/2025Mastic and Intumescent Fire-resistant CoatingsJames Vignolaspecial
▾Documents — 533 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
09/03/2026M00641469-I1Request digital key ↗
09/03/2026M00641469-P1Request digital key ↗
09/03/2026M00637020-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00355731-I1Request digital key ↗
▸Applications & Permits105
▸BISWORK PERMIT APPLICATION53
03/22/2023122948837Open ↗
06/17/2020140899320Open ↗
07/22/2019123834271Open ↗
Showing 3 of 53 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION52
03/07/2023122948837Open ↗
02/16/2023122948837Open ↗
02/13/2023122948837Open ↗
Showing 3 of 52 on file for this type
▸Seals & Professional Certifications110
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
02/20/2020123834271Open ↗
02/20/2020123834271Open ↗
02/13/2020123834271Open ↗
Showing 3 of 56 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00641469-I1Open ↗
09/03/2026M00641469-P1Open ↗
09/03/2026M00637020-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026M01252722-I1Open ↗
08/27/2026M01252722-I1Open ↗
08/26/2026M01396387-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/01/2020140899320Open ↗
12/20/2017140726542Open ↗
06/16/2016140509974Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/01/2020140899320Open ↗
12/20/2017140726542Open ↗
06/16/2016140509974Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/01/2020140899320Open ↗
12/20/2017140726542Open ↗
06/16/2016140509974Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026M01252722-I1Open ↗
08/26/2026M01252722-P1Open ↗
▸Trade Schedules & Equipment49
▸BISSCHEDULE B - PLUMBING16
03/07/2023122948837Open ↗
02/16/2023122948837Open ↗
12/20/2017140726542Open ↗
Showing 3 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
12/03/2019123834271Open ↗
09/26/2019123834271Open ↗
06/26/2019123834271Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/13/2021122948837Open ↗
11/06/2019122948837Open ↗
▸BISEQUIPMENT USE PERMITS2
08/13/2021122948837Open ↗
11/06/2019122948837Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/14/2022122948837Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/14/2022122948837Open ↗
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes8
06/26/2019123834271Open ↗
01/17/2019123511707Open ↗
12/21/2018123511707Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00355731-I1Open ↗
▸Environmental & Asbestos36
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
06/26/2019123834271Open ↗
01/17/2019123511707Open ↗
12/21/2018123511707Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00641469-P1Open ↗
09/03/2026M00641469-I1Open ↗
09/03/2026M00637020-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
02/20/2020123834271Open ↗
02/20/2020123834271Open ↗
02/13/2020123834271Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
08/13/2021122948837Open ↗
03/26/2021140899320Open ↗
02/20/2020123834271Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/13/2021122948837Open ↗
08/13/2021122948837Open ↗
03/02/2021140899320Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/01/2020140899320Open ↗
12/20/2017140726542Open ↗
▸BISNYCECC ANALYSIS1
05/01/2020140899320Open ↗
▸BIS* HVAC INSULATION AND SEALING1
12/14/2022122948837Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/14/2022122948837Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/14/2022122948837Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/14/2022122948837Open ↗
▸BISLIGHTING CONTROLS1
12/14/2022122948837Open ↗
▸BIS* DUCT LEAKAGE TESTING1
12/14/2022122948837Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/14/2022122948837Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00637020-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/13/2021122948837Open ↗
08/13/2021122948837Open ↗
08/13/2021122948837Open ↗
Showing 3 of 9 on file for this type
▸BISMECHANICAL SYSTEMS1
12/14/2022122948837Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/14/2022122948837Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/14/2022122948837Open ↗
▸Approvals, Objections & Sign-offs40
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
11/01/2023122948837Open ↗
03/26/2021140899320Open ↗
02/20/2020123834271Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/10/2016120099650Open ↗
Showing 1 of 3 on file for this type
▸BISSUPERSEDING LETTER1
03/22/2023122948837Open ↗
▸BISFINAL1
12/14/2022122948837Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT45
08/13/2021122948837Open ↗
03/26/2021140899320Open ↗
05/01/2020140899320Open ↗
Showing 3 of 45 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/14/2022122948837Open ↗
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET24
06/26/2019123834271Open ↗
12/21/2018123511707Open ↗
06/04/2018123421528Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM11
03/22/2023122948837Open ↗
02/20/2020123834271Open ↗
02/20/2020123834271Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION7
09/30/2019123834271Open ↗
08/11/2016120659000Open ↗
08/10/2016120659000Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/01/2020140899320Open ↗
12/20/2017140726542Open ↗
06/16/2016140509974Open ↗
Showing 3 of 4 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01252382-I1Open ↗
08/13/2026M01252670-I1Open ↗
▸BISMAINTENANCE INFORMATION1
12/14/2022122948837Open ↗
▸BISSHUTOFF DAMPERS1
12/14/2022122948837Open ↗
▸DOB NOWCalculations1
08/17/2026M01396387-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/17/2026M01396387-I1Open ↗