← Back
BuildNYC
MANHATTAN
The Smithsonian Condominium
60 WEST 129TH STREET · BIN 1053712
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 CoveredRent Stabilized3 Active Violations ▸FISP: SAFE
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRenaissance Realty Group48p · 6 filings · 20 docs
BulkheadRenaissance Realty Group1p · 1 filing · 20 docs
Floor 7Renaissance Realty Group13p · 5 filings · 20 docs
Floor 6Renaissance Realty Group13p · 5 filings · 20 docs
Floor 5Renaissance Realty Group13p · 5 filings · 20 docs
Floor 4Renaissance Realty Group13p · 5 filings · 20 docs
Floor 3Renaissance Realty Group13p · 5 filings · 20 docs
Floor 2Renaissance Realty Group13p · 5 filings · 20 docs
Floor 1Chick'nCone, Harlem Kettlebell ClubUnder Construction13p · 16 filings · 20 docs
CellarChick'nCone13p · 10 filings · 20 docs
Sub-CellarRenaissance Realty Group13p · 4 filings · 20 docs
Site & exteriorRenaissance Realty Group48p · 8 filings · 20 docs
Filed — no permit issuedADA ramp construction at residential entrance1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Renaissance Realty Group6310/13/2026
370 Lenox6203/22/2026
Cohen Realty Organization404/09/2026
Perfect Brow304/09/2026
NYC Department of Housing Preservation and Development303/21/2026
Lenox Associates303/21/2026
Canterbury Equities303/21/2026
Samuel Kairy Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ND Architecture Design1603/21/2026
ZV Drafting203/21/2026
CB Expediting103/21/2026
Advanced Builders Services1203/21/2026
AE Design Solution203/21/2026
TBC & Associates203/21/2026
Moses Katz Associates603/21/2026
Insha Building Consultants403/21/2026
Yonalove Consulting Services103/21/2026
An Tong Fan203/21/2026
Youn Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B Contractors GroupScaffold1203/21/2026
B Contractors GroupGeneral Contractor704/09/2026
A & D General ContractingScaffold603/21/2026
Townhouse BuildersScaffold403/21/2026
Prime Piping & HeatingFire Protection407/08/2026
Prime Piping & HeatingPlumbing307/08/2026
YatzivGeneral Contractor303/21/2026
Core Scaffold SystemsScaffold303/21/2026
Khalida ShoukatScaffold303/21/2026
GT Development EnterpriseGeneral Contractor304/09/2026
U S Star Construction NYGeneral Contractor303/21/2026
Green Star Electl ContElectrical203/22/2026
CJ Heating & MechanicalPlumbing207/08/2026
Tristar Plumbing & HeatingPlumbing107/08/2026
Gemini Electric CoElectrical103/22/2026
Seabrave ElectricElectrical103/22/2026
Sega ElectricElectrical103/22/2026
Ideal Kitchen & Ventilatispecialty_contractor104/09/2026
Master Fire MechanicalGeneral Contractor104/09/2026
Renaissance SpecialGeneral Contractor109/15/2026
Xolle DemoGeneral Contractor104/09/2026
Neptune Signs & AwningsSign hanger107/08/2026
A & A Plumbing SystemsPlumbing107/08/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
Plumbing P & HPlumbing107/08/2026
Dream Team ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City-Wide Testing416109/04/2026
Regional Testing3941711/05/2025
Catalpa Special Inspectio2004108/20/2025
NS Engineering & Consulting3652106/28/2022
Norman C. Lok818105/23/2022
Carlo Balestri Architect4139108/25/2020
Ashraf1973108/05/2020
Building Lifecycle
All (265)Filed (48)Permit Issued (39)Signed Off (22)Facade (FISP) (6)Violation (60)Inspection (16)Objection (44)Special Inspection (30)
09/14/2026
Permit issued — General Construction
M01454278-I1-GC
09/04/2026
Filed — Alteration
flooring replacement at existing health and fitness facility, no change to bulk, use or egress under this application
M01454278-I1
09/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
09/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
04/29/2026
Violation issued (HPD, closed)
A
04/15/2026
Objection resolved — Addressed
04/13/2026
Objection raised — Scope
03/20/2026
Filed — Alteration
Construction of an ADA ramp at the primary residential entrance as per plans
M01374883-I1
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2026
Signed off — Alteration CO
Interior alt to res.units 1-7 floors, new Doctor's Office and Fitness spaces on 1t fl, bicycle storages and buildings recreational space for residences in sub-cel. & cell and 1st floor. replacement of stringers at exist stairs, additional fire escape
M00560527-I1
11/05/2025
Filed — Alteration CO
Interior alt to res.units 1-7 floors, new Doctor's Office and Fitness spaces on 1t fl, bicycle storages and buildings recreational space for residences in sub-cel. & cell and 1st floor. replacement of stringers at exist stairs, additional fire escape
M00560527-P9
11/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
11/05/2025
Special inspection requirement — Lighting in dwelling units
Paul Raymond
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
10/30/2025
Special inspection requirement — Lighting in dwelling units
Paul Raymond
09/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/20/2025
Filed — Alteration
M01239407-I1
08/05/2025
Special inspection requirement — Final
Nathan Bright
07/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
07/08/2025
Special inspection requirement — Lighting in dwelling units
Paul Raymond
07/08/2025
Special inspection requirement — Lighting in dwelling units
Paul Raymond
06/30/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Admin
06/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
06/17/2025
Filed — Alteration CO
Interior alt to res.units 1-7 floors, new Doctor's Office and Fitness spaces on 1t fl, bicycle storages and buildings recreational space for residences in sub-cel. & cell and 1st floor. replacement of stringers at exist stairs, additional fire escape
M00560527-P8
06/10/2025
Special inspection requirement — Lighting in dwelling units
Paul Raymond
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
06/04/2025
Violation issued (HPD, closed)
A
02/14/2025
Filed — Alteration CO
Interior alt to res.units 1-7 floors, new Doctor's Office and Fitness spaces on 1t fl, bicycle storages and buildings recreational space for residences in sub-cel. & cell and 1st floor. replacement of stringers at exist stairs, additional fire escape
M00560527-P6
02/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
02/06/2025
Special inspection requirement — Lighting in dwelling units
Paul Raymond
10/15/2024
Signed off — Alteration
INSTALLING NEW S/S HOOD WITH EXHAUST/MUA DUCTS AND EXHAUST/MUA FANS IN EXISTING KITCHEN. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00762285-I1
09/04/2024
Signed off — Alteration
RENOVATION OF EXISTING RETAIL SPACE INCLUDING MINOR CARPENTRY WORK AND INSTALLATION OF NEW APPLIANCES
M00684467-I1
08/28/2024
Signed off — Alteration
THIS PAA IS FILED TO SUBMIT REVISED DRAINGS TO MATCH PAA FOR OT AND ADD SMOCK PURGE SYSTEM AS REQURIED BY ZRD-1 CONTROL NUMBER 71414
M00640341-I1
08/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/19/2024
Signed off — Alteration
M00113378-I1
08/05/2024
Signed off — Alteration
WORK INCLUDE SANITARY AND GAS PIPING
M00717210-I1
08/05/2024
Signed off — Alteration
plumbing systems in conjunction with Alteration CO M00560527-I1 ( Residential and Community Facility Areas only, no work at existinging commercial spaces)
M00640363-I1
07/31/2024
Signed off — Alteration
interior demolition of non-bearing walls and window replacement of an existing seven story and cellar mixed-use building.
M00528126-I1
07/05/2024
Filed — Alteration CO
Interior alt to res.units 1-7 floors, new Doctor's Office and Fitness spaces on 1t fl, bicycle storages and buildings recreational space for residences in sub-cel. & cell and 1st floor. replacement of stringers at exist stairs, additional fire escape
M00560527-P4
06/26/2024
Signed off — Alteration
sprinkler and standpipe drawings in conjunction with Alt CO
M00640398-I1
06/26/2024
Signed off — Alteration
structural drawings to enclose inner court on the lower levels in conjunction with M00560527
M00640408-I1
06/25/2024
Signed off — Alteration
Proposed construction fence. No change to use, egress or occupancy under this application.
M00742174-I1
06/21/2024
Signed off — Alteration
M00732389-I1
05/23/2024
Objection raised — Admin
05/23/2024
Objection resolved — Addressed
05/22/2024
Filed — Alteration CO
Interior alt to res.units 1-7 floors, new Doctor's Office and Fitness spaces on 1t fl, bicycle storages and buildings recreational space for residences in sub-cel. & cell and 1st floor. replacement of stringers at exist stairs, additional fire escape
M00560527-P3
05/22/2024
Special inspection requirement — Lighting in dwelling units
Paul Raymond
05/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
05/13/2024
Signed off — Alteration
interior demolition of non-bearing walls and window replacement of an existing seven story and cellar mixed-use building.
M00528126-S1
05/06/2024
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
03/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/22/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/22/2024
Special inspection requirement — Maintenance information
Paul Raymond
Latest 60 of 265 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRenaissance Special09/14/2026
DOB NOWMechanical SystemsSigned-offB Contractors Group02/08/2024
DOB NOWGeneral ConstructionPermit IssuedB Contractors Group01/04/2024
DOB NOWConstruction FenceSigned-offB Contractors Group12/19/2023
DOB NOWConstruction FenceSigned-offB Contractors Group12/13/2023
DOB NOWGeneral ConstructionPermit IssuedB Contractors Group11/08/2023
DOB NOWSprinklersSigned-offAmb Mechanical11/01/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating11/01/2023
DOB NOWStandpipeSigned-offAmb Mechanical11/01/2023
DOB NOWGeneral ConstructionPermit IssuedB Contractors Group06/15/2023
DOB NOWConstruction FenceSigned-offB Contractors Group05/23/2023
DOB NOWSidewalk ShedSigned-offA & D General Contracting03/31/2023
DOB NOWGeneral ConstructionPermit IssuedB Contractors Group11/25/2022
DOB NOWStructuralSigned-offB Contractors Group11/15/2022
DOB NOWGeneral ConstructionSigned-offGT Development Enterprise11/15/2022
DOB NOWPlumbingSigned-offPrime Piping & Heating10/31/2022
DOB NOWStandpipeSigned-offAmb Mechanical10/31/2022
DOB NOWSprinklersSigned-offAmb Mechanical10/31/2022
DOB NOWGeneral ConstructionPermit IssuedB Contractors Group10/20/2022
DOB NOWGeneral ConstructionSigned-offYatziv08/22/2022
DOB NOWSidewalk ShedSigned-offA & D General Contracting07/29/2022
DOB NOWMechanical SystemsSigned-offMaster Fire Mechanical07/12/2022
DOB NOWPlumbingSigned-offCJ Heating & Mechanical06/10/2022
DOB NOWGeneral ConstructionSigned-offU S Star Construction NY06/06/2022
DOB NOWConstruction FenceSigned-offB Contractors Group05/27/2022
DOB NOWPlumbingSigned-offCJ Heating & Mechanical05/25/2022
DOB NOWGeneral ConstructionSigned-offGT Development Enterprise05/13/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/11/2022
DOB NOWSignSigned-offNeptune Signs & Awnings02/03/2022
DOB NOWPlumbingSigned-offPrime Piping & Heating12/06/2021
DOB NOWGeneral ConstructionSigned-offXolle Demo12/02/2021
DOB NOWPlumbingSigned-offPlumbing P & H03/11/2021
DOB NOWPlumbingSigned-offTristar Plumbing & Heating01/12/2021
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating11/18/2020
DOB NOWMechanical SystemsSigned-offIdeal Kitchen & Ventilati08/10/2020
DOB NOWPlumbingSigned-offA & A Plumbing Systems12/04/2019
DOB NOWSupported ScaffoldSigned-offKhalida Shoukat01/11/2019
DOB NOWConstruction FenceSigned-offTownhouse Builders11/28/2018
DOB NOWConstruction FenceSigned-offTownhouse Builders09/05/2018
BISOTISSUEDScampa Contracting03/11/2021
+ 49 more permits on file
16 projects · most recent 04/22/2025
General Wiring Boiler Controls
FiledStatusContractorScope
04/22/2025CompleteSega ElectricGeneral Wiring
08/05/2024CompleteHivolts ElectricalGeneral Wiring
04/14/2024CompleteHivolts ElectricalGeneral Wiring
09/13/2023CompleteStar Electrical Contractors—
09/07/2023CancelledStar Electrical Contractors—
08/10/2022CompleteHigh Quality Electric of—
08/04/2022CompleteSeabrave ElectricGeneral Wiring
05/09/2022CompleteV. Vass Electric—
12/13/2021CompleteHivolts Electrical—
03/23/2021CompleteGemini Electric CoGeneral Wiring
12/14/2020CompleteDream Team ElectricalGeneral Wiring
08/08/2020CompleteWCK ElectricGeneral Wiring
06/04/2019CompleteGreen Star Electl ContGeneral Wiring
03/13/2019CompleteGreen Star Electl ContGeneral Wiring
10/29/2018CompleteGreen Star Electl Cont—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
09/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2024Pass-Final SD - Fire PumpPassView ↗
03/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/22/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/20/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/14/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/05/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2022Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
09/03/2026Fire-Resistance Rated ConstructionELIAS RASABIprogress
09/03/2026Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
03/19/2026Tenant Protection Plan Compliance—special
03/19/2026Final—progress
11/05/2025Lighting in dwelling unitsPaul Raymondenergy_progress
11/05/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
10/30/2025Lighting in dwelling unitsPaul Raymondenergy_progress
10/30/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
08/29/2025Fire-Resistant Penetrations and Joints—special
08/05/2025FinalNathan Brightprogress
07/08/2025Lighting in dwelling unitsPaul Raymondenergy_progress
07/08/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
07/08/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
07/08/2025Lighting in dwelling unitsPaul Raymondenergy_progress
06/20/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
06/10/2025Lighting in dwelling unitsPaul Raymondenergy_progress
06/10/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
02/06/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
02/06/2025Lighting in dwelling unitsPaul Raymondenergy_progress
05/22/2024Lighting in dwelling unitsPaul Raymondenergy_progress
05/14/2024Structural Stability – Alterations of existing buildingsPaul Raymondspecial
03/22/2024Energy Code Compliance InspectionsPaul Raymondprogress
03/22/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/22/2024Maintenance informationPaul Raymondenergy_progress
03/13/2024Fenestration areasALBERTO ROMANenergy_progress
Latest 25 of 107.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Harlem Kettlebell ClubFitness / RecreationFloor 1
Project M01239407 Alteration · Approved · 08/20/2025
Chick'nConeRestaurant / Food ServiceCellar, Floor 1
Project M00382479 Alteration · LOC Issued · 08/25/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 699 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch40
10/13/2026M01454278-I1Request digital key ↗
09/06/2026M00566513-I1Request digital key ↗
09/06/2026M00002821-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/05/2026M00271571-I1Request digital key ↗
09/04/2026M00382479-I1Request digital key ↗
09/04/2026M00443783-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00377570-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00235672-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00113378-I1Request digital key ↗
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION41
07/18/2024140965971Open ↗
06/25/2024140831483Open ↗
06/18/2024140831483Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION36
02/16/2021140995528Open ↗
02/12/2021123527807Open ↗
11/23/2020140942461Open ↗
Showing 3 of 36 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
10/22/2020140965971Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
10/22/2020140965971Open ↗
▸Zoning, Tax Lot & Property Records21
▸DOB NOWZD1: DOB Zoning Diagram10
08/13/2026M00560527-P1Open ↗
Showing 1 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)10
08/13/2026M00560527-P8Open ↗
08/13/2026M00560527-P7Open ↗
08/13/2026M00560527-P6Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications187
▸DOB NOWDPL-1: Design Professional Seal & Signature50
09/16/2026M01454278-I1Open ↗
09/05/2026M00113378-I1Open ↗
09/05/2026M00271571-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWProgress Inspector Seal & Signature47
09/22/2026M00640341-I1Open ↗
09/22/2026M00640341-I1Open ↗
09/22/2026M00640341-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/22/2026M00640341-I1Open ↗
09/22/2026M00640341-I1Open ↗
09/22/2026M00640341-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
11/23/2020140942461Open ↗
11/26/2019123883315Open ↗
08/19/2019123458524Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
12/24/2020140995528Open ↗
10/16/2020140965971Open ↗
08/25/2020140942461Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
12/24/2020140995528Open ↗
10/16/2020140965971Open ↗
08/25/2020140942461Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
12/24/2020140995528Open ↗
10/16/2020140965971Open ↗
08/25/2020140942461Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/26/2019123883315Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment35
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
01/31/2020123527807Open ↗
10/09/2019123527807Open ↗
10/07/2019123527807Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/19/2021123527807Open ↗
07/19/2021123527807Open ↗
07/14/2021123527807Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
09/21/2020123527807Open ↗
09/14/2020123527807Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
07/19/2021123527807Open ↗
02/06/2020123527807Open ↗
07/18/2019121230382Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/14/2021123527807Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
07/14/2021123527807Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection33
▸BISTENANT PROTECTION PLAN AND NOTES12
10/16/2020140965971Open ↗
08/25/2020140942461Open ↗
11/26/2019123883315Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan10
09/05/2026M00271571-I1Open ↗
09/04/2026M00377570-I1Open ↗
09/04/2026M00443783-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWStreet Tree Checklist10
08/13/2026M00560527-P7Open ↗
08/13/2026M00560527-P6Open ↗
08/13/2026M00560527-P5Open ↗
Showing 3 of 10 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
02/16/2021140995528Open ↗
▸Environmental & Asbestos53
▸DOB NOWDEP ACP-5: Asbestos Assessment Report37
09/05/2026M00113378-I1Open ↗
09/05/2026M00271571-I1Open ↗
09/04/2026M00377570-I1Open ↗
Showing 3 of 37 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
12/24/2020140995528Open ↗
11/29/2020123883315Open ↗
10/16/2020140965971Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance50
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY15
02/03/2022140995528Open ↗
02/03/2022140995528Open ↗
07/14/2021123527807Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
11/23/2020140942461Open ↗
11/26/2019123883315Open ↗
07/19/2019121230382Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
12/24/2020140995528Open ↗
10/16/2020140965971Open ↗
08/25/2020140942461Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
02/03/2022140995528Open ↗
01/08/2021123883315Open ↗
07/19/2019121230382Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
05/20/2024140831483Open ↗
02/09/2022140965971Open ↗
07/14/2021123527807Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISNYCECC ANALYSIS2
10/16/2020140965971Open ↗
08/25/2020140942461Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/20/2024140831483Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY25
05/20/2024140831483Open ↗
05/20/2024140831483Open ↗
02/09/2022140965971Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
08/19/2019123458524Open ↗
08/14/2019123458524Open ↗
Showing 2 of 3 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
05/17/2024140831483Open ↗
05/13/2024140965971Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/19/2019123458524Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMASONRY1
05/17/2024140831483Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
05/13/2024140965971Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/13/2024140965971Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
07/18/2024140965971Open ↗
06/25/2024140831483Open ↗
02/04/2022140995528Open ↗
Showing 3 of 17 on file for this type
▸BISSUPERSEDING LETTER5
02/12/2021123527807Open ↗
10/30/2020123883315Open ↗
08/05/2020123068660Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/18/2024140965971Open ↗
12/24/2020140995528Open ↗
08/20/2020140769005Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL1
05/20/2024140831483Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT28
02/03/2022140995528Open ↗
02/10/2021140942461Open ↗
01/08/2021123883315Open ↗
Showing 3 of 28 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
05/21/2024140831483Open ↗
05/15/2024140965971Open ↗
07/14/2021123527807Open ↗
Showing 3 of 4 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of Insurance1
08/13/2026M00560527-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00560527-I1Open ↗
▸Filing & Intake Forms51
▸BISBOROUGH INTAKE FORM17
02/12/2021123527807Open ↗
10/30/2020123883315Open ↗
08/05/2020123068660Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION16
03/10/2021123527807Open ↗
11/29/2020123883315Open ↗
02/06/2020123527807Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET9
02/22/2024124039762Open ↗
11/26/2019123883315Open ↗
Showing 2 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
12/24/2020140995528Open ↗
10/16/2020140965971Open ↗
08/25/2020140942461Open ↗
Showing 3 of 9 on file for this type
▸Other Documents35
▸DOB NOWSite Survey: Initial10
08/13/2026M00560527-P6Open ↗
08/13/2026M00560527-P3Open ↗
08/13/2026M00560527-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWPlot Diagram10
08/13/2026M00560527-I1Open ↗
08/13/2026M00560527-P1Open ↗
08/13/2026M00560527-P4Open ↗
Showing 3 of 10 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
07/14/2021123527807Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00560527-I1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type