← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
60 WEST 15TH STREET
MANHATTAN · BIN 1015302
💬 Discuss this project
1920Year Built
6Stories
D0Building Class
C6-2AZoning
19,764 sfGross Floor Area
6Units
Rent Stabilized0 Active Violations
Elevator co-op, conversion from loft/warehouse · Owner of record: 58-60 Realty Company · 3,309 sf lot · 5.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCfa Management INC.1p · 1 filing · 7 docs
Floor 6Unit 6R19p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1New split A.C. system installation, 1st floor store4p · 1 filing · 10 docs
Site & exteriorCfa Management INC.6p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
58-60 West 15th St Apt1003/21/2026
58-60 Realty Company103/22/2026
JK Blum Associates103/22/2026
Carole Ferrara Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering210/10/2023
Enthink Engineers107/28/2021
Thomas A Fenniman Architect105/11/2021
Prudigm Engineering412/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tailwind Consultants203/21/2026
H J Building Consulting403/21/2026
Rip CC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Upgrade Contracting CoGeneral Contractor607/08/2026
Andamio ScaffoldingScaffold407/08/2026
Bison Development GroupGeneral Contractor303/21/2026
Mr. Air NYCGeneral Contractor303/21/2026
Grushinsky Pipng & HeatingFire Protection207/08/2026
Everest ScaffoldingScaffold203/21/2026
DPH Plumbing & HeatingPlumbing207/08/2026
Intelogic ElectricElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781210/10/2023
Thomas A. Fenniman Architects260105/11/2021
Prudigm Engineering Llcu4304412/08/2020
Building Lifecycle
All (74)Filed (8)Permit Issued (13)Signed Off (4)Violation (14)Objection (6)Special Inspection (29)
11/24/2023
Signed off — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT 1ST FLOOR STORE OF EXISTING 6 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00892187-I1
10/10/2023
Filed — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT 1ST FLOOR STORE OF EXISTING 6 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00892187-P1
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
09/26/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
06/28/2023
Permit issued — Mechanical Systems
M00892187-I1-MS
06/23/2023
Filed — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT 1ST FLOOR STORE OF EXISTING 6 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00892187-I1
04/27/2023
Signed off — Alteration
M00563487-I1
10/03/2022
Permit issued — General Construction
M00499668-I1-GC
09/27/2022
Permit issued — Sidewalk Shed
M00563487-I1-SH
10/14/2021
Permit issued — General Construction
M00499668-I1-GC
10/04/2021
Permit issued — General Construction
M00499668-I1-GC
10/01/2021
Permit issued — Sidewalk Shed
M00563487-I1-SH
09/09/2021
Permit issued — General Construction
M00499668-I1-GC
07/28/2021
Filed — Alteration
M00563487-I1
07/28/2021
Permit issued — Sidewalk Shed
M00563487-I1-SH
05/11/2021
Filed — Alteration
EXTERIOR RESTORATION.NO CHANGE TO USE, EGRESS, OCCUPANCY OR BULK
M00499668-I1
04/07/2021
Special inspection requirement — Masonry
Thomas Fenniman
04/07/2021
Special inspection requirement — Post-installed Anchors
Thomas Fenniman
04/07/2021
Special inspection requirement — Final
Thomas Fenniman
04/07/2021
Special inspection requirement — Energy Code Compliance Inspections
Thomas Fenniman
04/07/2021
Special inspection requirement — Air barrier - visual inspection
Thomas Fenniman
03/10/2021
Signed off — Alteration
Modification of existing sprinkler system and existing plumbing fixtures as per plan. No change to use, egress or occupancy filed under this application.
M00229588-I1
03/10/2021
Signed off — Alteration
Install split system AC condensing units w/ 300 square feet of related duct work.
M00231890-I1
01/27/2021
Permit issued — Plumbing
M00229588-I1-EW-SP
01/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
01/06/2021
Special inspection requirement — Sprinkler Systems
Naeem Anwar
01/05/2021
Permit issued — Plumbing
M00229588-I1-PL
01/04/2021
Objection resolved — Addressed
12/11/2020
Objection resolved — Addressed
12/10/2020
Objection raised — Other
12/10/2020
Objection raised — Other
12/08/2020
Filed — Alteration
Modification of existing sprinkler system and existing plumbing fixtures as per plan. No change to use, egress or occupancy filed under this application.
M00229588-P2
12/04/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
12/04/2020
Special inspection requirement — Sprinkler Systems
Naeem Anwar
10/20/2020
Objection resolved — Addressed
10/14/2020
Objection raised — Other
10/05/2020
Filed — Alteration
Modification of existing sprinkler system and existing plumbing fixtures as per plan. No change to use, egress or occupancy filed under this application.
M00229588-P1
09/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/03/2020
Special inspection requirement — Sprinkler Systems
Naeem Anwar
09/03/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
12/10/2019
Permit issued — Plumbing
M00229588-I1-EW-SP
12/10/2019
Permit issued — Sprinklers
M00229588-I1-PL
12/09/2019
Permit issued — Mechanical Systems
M00231890-I1-MS
09/27/2019
Filed — Alteration
Modification of existing sprinkler system and existing plumbing fixtures as per plan. No change to use, egress or occupancy filed under this application.
M00229588-I1
09/27/2019
Filed — Alteration
Install split system AC condensing units w/ 300 square feet of related duct work.
M00231890-I1
09/23/2019
Special inspection requirement — Heating Systems
Naeem Anwar
09/20/2019
Special inspection requirement — HVAC and service water heating system controls
Naeem Anwar
09/20/2019
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
09/20/2019
Special inspection requirement — Maintenance information
Naeem Anwar
09/20/2019
Special inspection requirement — Mechanical Systems
Naeem Anwar
09/20/2019
Special inspection requirement — Final
Naeem Anwar
09/20/2019
Special inspection requirement — HVAC insulation and sealing
Naeem Anwar
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMr. Air NYC06/28/2023
DOB NOWGeneral ConstructionPermit IssuedUpgrade Contracting Co10/03/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/27/2022
DOB NOWGeneral ConstructionPermit IssuedUpgrade Contracting Co10/14/2021
DOB NOWGeneral ConstructionPermit IssuedUpgrade Contracting Co10/04/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/01/2021
DOB NOWGeneral ConstructionPermit IssuedUpgrade Contracting Co09/09/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/28/2021
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating01/27/2021
DOB NOWPlumbingSigned-offDPH Plumbing & Heating01/05/2021
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating12/10/2019
DOB NOWPlumbingSigned-offDPH Plumbing & Heating12/10/2019
DOB NOWMechanical SystemsSigned-offBison Development Group12/09/2019
BISOTISSUEDBison Development Group01/27/2020
BISOTISSUEDBison Development Group11/21/2019
BISMHISSUEDMetropolitan Mechanical03/14/2016
BISSPISSUEDDemar Plumbing09/07/2010
BISPLISSUEDDemar Plumbing08/24/2010
BISMHISSUEDCHC Contracting01/22/2010
BISSPISSUEDDemar Plumbing06/22/2009
BISPLISSUEDIhope Plumbing and Heating Co05/14/2004
BISMHISSUEDThomas P Gallagher02/27/2004
BISPLISSUEDAccurate Mechanical11/21/2002
BISOTISSUEDBlueline Construction08/28/2002
BISEQISSUEDTBR08/06/1998
BISPLISSUEDDesena Plumbing & Heating02/09/1994
BISMHISSUEDBarry Fishelberg Co01/18/1994
BISMHISSUEDLyons Minskoff11/14/1991
5 projects · most recent 07/07/2023
General Wiring HVAC Wiring
FiledStatusContractorScope
07/07/2023CompleteIntelogic ElectricHVAC Wiring
04/21/2023CompleteHY-Lee Electric CoGeneral Wiring
07/28/2021CompleteBorowide Elect'l Contractors—
12/05/2019CompleteV A ElectricGeneral Wiring
03/12/2018CompleteJam Electrical—
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
09/26/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/26/2023Mechanical SystemsCHRISTIAN LOZADAspecial
09/26/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
09/26/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
09/26/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
09/26/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
09/26/2023FinalCHRISTIAN LOZADAprogress
09/26/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/26/2023Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
09/26/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
04/07/2021MasonryThomas Fennimanspecial
04/07/2021Post-installed AnchorsThomas Fennimanspecial
04/07/2021FinalThomas Fennimanprogress
04/07/2021Energy Code Compliance InspectionsThomas Fennimanprogress
04/07/2021Air barrier - visual inspectionThomas Fennimanenergy_progress
01/06/2021Fire-Resistant Penetrations and JointsNaeem Anwarspecial
01/06/2021Sprinkler SystemsNaeem Anwarspecial
12/04/2020Fire-Resistant Penetrations and JointsNaeem Anwarspecial
12/04/2020Sprinkler SystemsNaeem Anwarspecial
09/03/2020Sprinkler SystemsNaeem Anwarspecial
09/03/2020Fire-Resistant Penetrations and JointsNaeem Anwarspecial
09/23/2019Heating SystemsNaeem Anwarspecial
09/20/2019HVAC and service water heating system controls Naeem Anwarenergy_progress
09/20/2019Energy Code Compliance InspectionsNaeem Anwarprogress
09/20/2019Maintenance informationNaeem Anwarenergy_progress
Latest 25 of 29.
▾Documents — 118 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch4
09/03/2026M00499668-I1Request digital key ↗
09/03/2026M00563487-I1Request digital key ↗
08/30/2026M00892187-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00229588-I1Request digital key ↗
08/15/2026M00229588-P2Request digital key ↗
08/15/2026M00229588-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00229588-I1Request digital key ↗
08/15/2026M00229588-P1Request digital key ↗
08/15/2026M00229588-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00231890-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION9
01/28/2020123883556Open ↗
11/22/2019123883556Open ↗
03/24/2016122523304Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
10/07/2019123883556Open ↗
09/25/2019123883556Open ↗
10/12/2015122523304Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026M00892187-P1Open ↗
09/02/2026M00892187-P1Open ↗
09/02/2026M00892187-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026M00892187-P1Open ↗
09/02/2026M00892187-P1Open ↗
09/02/2026M00892187-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/05/2026M00231890-I1Open ↗
09/03/2026M00499668-I1Open ↗
08/30/2026M00892187-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/25/2019123883556Open ↗
09/25/2019123883556Open ↗
06/02/2016122523304Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/12/2015122523304Open ↗
06/19/2009120069219Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/12/2015122523304Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/19/2009120069219Open ↗
▸Trade Schedules & Equipment10
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/12/2016122523304Open ↗
07/12/2016122523304Open ↗
02/03/2010120069219Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
07/30/2010120069219Open ↗
02/03/2010120069219Open ↗
01/29/2010120069219Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
11/16/2010120069219Open ↗
09/11/2009120069219Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
09/05/2026M00231890-I1Open ↗
08/13/2026M00229588-P2Open ↗
08/13/2026M00229588-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
09/25/2019123883556Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00231890-I1Open ↗
09/03/2026M00499668-I1Open ↗
08/13/2026M00229588-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
06/19/2009120069219Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/25/2019123883556Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/25/2019123883556Open ↗
09/25/2019123883556Open ↗
06/02/2016122523304Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING CONTROLS1
03/01/2021123883556Open ↗
▸BISINTERIOR LIGHTING POWER1
03/01/2021123883556Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/02/2016122523304Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/01/2021123883556Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/01/2021123883556Open ↗
▸Inspections & Test Reports2
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/01/2021123883556Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/01/2021123883556Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/01/2021123883556Open ↗
06/02/2016122523304Open ↗
03/30/2011120069219Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/21/2019123883556Open ↗
03/30/2011120069219Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/19/2009120069219Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
09/25/2019123883556Open ↗
06/02/2016122523304Open ↗
10/12/2015122523304Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/01/2021123883556Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
09/25/2019123883556Open ↗
10/12/2015122523304Open ↗
06/19/2009120069219Open ↗