← Back
Elevator cooperative
60 WEST 68 STREET
MANHATTAN · BIN 1028253
💬 Discuss this project
1920Year Built
11.5Stories
D4Building Class
R8Zoning
61,908 sfGross Floor Area
73Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 60 68 APTS CORP · 7,858 sf lot · 7.88 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 9Under Construction3p · 2 filings · 5 docs
Floor 8Under Construction18p · 5 filings · 20 docs
Floor 7
Floor 612p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEMX607/08/2026
AKAM ASSOCIATES, INC.903/22/2026
60-68 APARTMENTS9203/22/2026
60 68 APTS CORP MATTHEW A103/22/2026
ELM MANAGEMENT ASSOC I103/22/2026
60 WEST 68 STREET OWNERS CORP203/21/2026
C O MATTHEW ADAM PROPERTIES103/21/2026
60 W 68TH403/21/2026
60 WEST 698 STREET OWNERS103/21/2026
60W68ST OWNERS103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING403/21/2026
JM ZONING, LLC.603/21/2026
J A EXPEDITING1003/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
JON LIBASCI RA403/21/2026
AM EXPEDITING103/21/2026
NOEL BUILDING CONSULTING INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMX CORPGeneral Contractor1007/08/2026
HOME DESIGN GROUP NYC LLCGeneral Contractor507/08/2026
BIKO RENOVATIONS CORPGeneral Contractor407/08/2026
A.L.L. CONSTRUCTION AND DGeneral Contractor303/21/2026
GG CONSTRUCTION CONTRACTGeneral Contractor303/21/2026
SABI CONSTRUCTION USA INCGeneral Contractor207/08/2026
HOME IMPRO SERVS GRP INCGeneral Contractor203/21/2026
LEVIN ALEXANDERElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
MARIO CASTROElectrical103/21/2026
BORI CONSTRUCTION CORPGeneral Contractor107/08/2026
HAMILTON AIR COMPANY, INC.General Contractor104/09/2026
LOYVETA CONSTRUCTIONGeneral Contractor107/08/2026
ALKLEM PLUMBING INCPlumbing107/10/2026
AQUA BLUE PLBG SVCES CORPPlumbing109/15/2026
DONATO PLUMBING, INCPlumbing107/08/2026
HYDRO MECHANICAL INCPlumbing107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
IPS PLUMBING CORPPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
WYNNE PLBG & HEATING CORPPlumbing107/08/2026
ABDUL AZIZElectrical103/21/2026
ZONE PLUMBING & HEATING CPlumbing106/28/2026
ALEXANDER LEVINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110204/28/2026
WAVIC ENGINEERING PLLC1733104/16/2026
ALYSSA MANFREDONIA ARCHIT8466102/25/2026
JACK GREEN ASSOCIATES422101/30/2025
AMMOR ARCHITECTURE LLP3054109/20/2024
LUKE LICALZI P.E.,P.C.3679202/13/2024
NAPACH ARCHITECTU2945109/08/2023
A2 ARCHITECT, PC2504212/29/2021
RYAN SPECIAL ENGINEERING2018210/24/2021
Building Lifecycle
All (122)Filed (30)Permit Issued (27)Signed Off (12)Facade (FISP) (15)Violation (38)
09/14/2026
Permit issued — Plumbing
M01174990-S1-PL
08/17/2026
Filed — Alteration
Replacing plumbing fixtures in bathrooms & kitchen on 10th floor existing apartment 10DEF as per plans. No change in use, egress or occupancy.
M01440629-I1
07/09/2026
Permit issued — Plumbing
M01358266-I1-PL
06/26/2026
Permit issued — Plumbing
M01363632-S1-PL
06/10/2026
Permit issued — General Construction
M01362536-I1-GC
05/26/2026
Permit issued — General Construction
M01362536-I1-GC
05/19/2026
Permit issued — Plumbing
M01362536-S1-PL
04/28/2026
Filed — Alteration
SELECTIVE INTERIOR RENOVATION AT APT 1C, LIMITED TO KITCHEN, AND BATHROOM, AS PER PLANS. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.
M01363632-S1
04/24/2026
Filed — Alteration
SELECTIVE INTERIOR RENOVATION AT APT 1C, LIMITED TO KITCHEN, AND BATHROOM, AS PER PLANS. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.
M01363632-I1
04/21/2026
Signed off — Alteration
Renovation of kitchen and foyer in apt. 6C to include removal of partition and doors, install new floor, finishes, cabinetry and hardware. No change to use, egress or occupancy is involved.
M01168160-S1
04/16/2026
Filed — Alteration
Replace bathroom plumbing fixtures (lav and water closet) on existing roughing in existing bathroom at apartment 9E. Swap out tub for shower. No change to use, egress or occupancy.
M01358266-I1
04/03/2026
Signed off — Alteration
Renovation of kitchen and foyer in apt. 6C to include removal of partition and doors, install new floor, finishes, cabinetry and hardware. No change to use, egress or occupancy is involved.
M01168160-I1
02/25/2026
Filed — Alteration
M01362536-I1
02/25/2026
Filed — Alteration
M01362536-S1
10/01/2025
Permit issued — Plumbing
M01174990-S1-PL
08/19/2025
Filed — Alteration
INTERIOR PLUMBING WORK IN UNIT 8G AT 8TH FLOOR. NO CHANGE IN USE OCCUPANCY OR EGRESS.
M01174990-S1
08/14/2025
Signed off — Alteration
NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY. INSTALL NEW GAS RANGE AND GAS METER ON EXISTING BUILDING SERVICE. NO CHANGE TO EXISTING PARTITIONS. REPLACE & RELOCATE FIXTURES @ EXISTING BATH. REPLACE & RELOCATE EXG FIXTURES @ KITCHEN. NO EXTERIOR WORK.
M01108077-I1
08/14/2025
Signed off — Alteration
NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY. INSTALL NEW GAS RANGE AND GAS METER ON EXISTING BUILDING SERVICE. NO CHANGE TO EXISTING PARTITIONS. REPLACE & RELOCATE FIXTURES @ EXISTING BATH. REPLACE & RELOCATE EXG FIXTURES @ KITCHEN. NO EXTERIOR WORK.
M01108077-S1
07/24/2025
Permit issued — General Construction
M01168160-I1-GC
07/24/2025
Permit issued — Plumbing
M01168160-S1-PL
07/14/2025
Filed — Alteration
INTERIOR PLUMBING WORK IN UNIT 8G AT 8TH FLOOR. NO CHANGE IN USE OCCUPANCY OR EGRESS.
M01174990-I1
05/22/2025
Filed — Alteration
Renovation of kitchen and foyer in apt. 6C to include removal of partition and doors, install new floor, finishes, cabinetry and hardware. No change to use, egress or occupancy is involved.
M01168160-S1
05/22/2025
Filed — Alteration
Renovation of kitchen and foyer in apt. 6C to include removal of partition and doors, install new floor, finishes, cabinetry and hardware. No change to use, egress or occupancy is involved.
M01168160-I1
03/12/2025
Permit issued — Mechanical Systems
M01168375-I1-GC-CX
02/27/2025
Permit issued — General Construction
M01108077-I1-GC
02/24/2025
Filed — Alteration
NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY. INSTALL NEW GAS RANGE AND GAS METER ON EXISTING BUILDING SERVICE. NO CHANGE TO EXISTING PARTITIONS. REPLACE & RELOCATE FIXTURES @ EXISTING BATH. REPLACE & RELOCATE EXG FIXTURES @ KITCHEN. NO EXTERIOR WORK.
M01108077-P1
01/30/2025
Filed — Alteration
M01168375-I1
12/05/2024
Permit issued — Plumbing
M01108077-S1-PL
10/18/2024
Permit issued — General Construction
M01108077-I1-GC
09/20/2024
Filed — Alteration
NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY. INSTALL NEW GAS RANGE AND GAS METER ON EXISTING BUILDING SERVICE. NO CHANGE TO EXISTING PARTITIONS. REPLACE & RELOCATE FIXTURES @ EXISTING BATH. REPLACE & RELOCATE EXG FIXTURES @ KITCHEN. NO EXTERIOR WORK.
M01108077-I1
09/20/2024
Filed — Alteration
NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY. INSTALL NEW GAS RANGE AND GAS METER ON EXISTING BUILDING SERVICE. NO CHANGE TO EXISTING PARTITIONS. REPLACE & RELOCATE FIXTURES @ EXISTING BATH. REPLACE & RELOCATE EXG FIXTURES @ KITCHEN. NO EXTERIOR WORK.
M01108077-S1
08/12/2024
Cycle 9 facade report signed — SAFE
07/30/2024
Cycle 9 facade report submitted
06/20/2024
Cycle 9 facade inspection completed
06/05/2024
Signed off — Alteration
10A: Interior renovations consisting of partitions and finishes as per plans filed herewith, No change to use, egress or occupancy.
M00918676-I1
06/05/2024
Signed off — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
M00918677-I1
06/05/2024
Signed off — Alteration
RENOVATION FOR GENERAL CONSTRUCTION WORK IN APARTMENT 8D ON 8TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00966399-I1
03/19/2024
Signed off — Alteration
facade restoration
M00727174-I1
02/13/2024
Filed — Alteration
facade restoration
M00727174-P1
01/11/2024
Permit issued — General Construction
M00966399-I1-GC
01/09/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. 6TH FL APT#6A. PARTIAL REMOVAL NON-LOAD BEARING PARTITIONS AND RELATED FINISHES, REPLACEMENT OF VCT FLOORING, MINOR PLUMBING / REPLACEMENT AND INSTALLATION OF NEW PLUMBING FIXTURES, AND ELECTRICAL WORK.
M00589673-P1
12/15/2023
Signed off — Alteration
M08034972-I1
12/13/2023
Permit issued — General Construction
M00918676-I1-GC
12/01/2023
Filed — Alteration
RENOVATION FOR GENERAL CONSTRUCTION WORK IN APARTMENT 8D ON 8TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00966399-I1
11/14/2023
Permit issued — Plumbing
M00918677-I1-PL
11/13/2023
Permit issued — Sidewalk Shed
M08034972-I1-SH
10/17/2023
Permit issued — General Construction
M00589673-I1-GC
09/08/2023
Filed — Alteration
10A: Interior renovations consisting of partitions and finishes as per plans filed herewith, No change to use, egress or occupancy.
M00918676-I1
09/08/2023
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
M00918677-I1
06/07/2023
Signed off — Alteration
NEW OPENING THROUGH NON-BEARING PARTITION TO COMBINE APTS 2F AND 2G IN COMPLIANCE WITH TPPN #3/97. KITCHENETTE IN APT 2-G TO BE ELIMINATED. NO CHANGE IN USE, EGRESSS OR OCCUPANCY UNDER THIS APPLICATION.
M00768532-I1
04/27/2023
Cycle 9 facade report signed — SWARMP
03/08/2023
Permit issued — General Construction
M00768532-I1-GC
02/15/2023
Filed — Alteration
NEW OPENING THROUGH NON-BEARING PARTITION TO COMBINE APTS 2F AND 2G IN COMPLIANCE WITH TPPN #3/97. KITCHENETTE IN APT 2-G TO BE ELIMINATED. NO CHANGE IN USE, EGRESSS OR OCCUPANCY UNDER THIS APPLICATION.
M00768532-I1
02/13/2023
Cycle 9 facade report submitted
02/07/2023
Permit issued — Structural
M00727174-I1-ST
02/03/2023
Permit issued — Structural
M00727174-I1-GC
02/01/2023
Cycle 9 facade inspection completed
01/03/2023
Filed — Alteration
facade restoration
M00727174-I1
11/14/2022
Permit issued — Sidewalk Shed
M08034972-I1-SH
11/11/2022
Filed — Alteration
M08034972-I1
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAQUA BLUE PLBG SVCES CORP09/14/2026
DOB NOWPlumbingPermit IssuedALKLEM PLUMBING INC07/09/2026
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C06/26/2026
DOB NOWGeneral ConstructionPermit IssuedSABI CONSTRUCTION USA INC06/10/2026
DOB NOWGeneral ConstructionPermit IssuedSABI CONSTRUCTION USA INC05/26/2026
DOB NOWPlumbingPermit IssuedSAFEPIPE PLUMBING INC05/19/2026
DOB NOWPlumbingPermit IssuedHYDRO MECHANICAL INC10/01/2025
DOB NOWGeneral ConstructionSigned-offHOME DESIGN GROUP NYC LLC07/24/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC07/24/2025
DOB NOWMechanical SystemsPermit IssuedHAMILTON AIR COMPANY, INC.03/12/2025
DOB NOWGeneral ConstructionSigned-offBIKO RENOVATIONS CORP02/27/2025
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP12/05/2024
DOB NOWGeneral ConstructionSigned-offBIKO RENOVATIONS CORP10/18/2024
DOB NOWGeneral ConstructionSigned-offHOME IMPRO SERVS GRP01/11/2024
DOB NOWGeneral ConstructionSigned-offLOYVETA CONSTRUCTION12/13/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR11/14/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP11/13/2023
DOB NOWGeneral ConstructionPermit IssuedHOME DESIGN GROUP NYC LLC10/17/2023
DOB NOWGeneral ConstructionSigned-offGG CONSTRUCTION CONTRACT03/08/2023
DOB NOWStructuralSigned-offLEMX CORP02/07/2023
DOB NOWStructuralSigned-offLEMX CORP02/03/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP11/14/2022
DOB NOWGeneral ConstructionPermit IssuedHOME DESIGN GROUP NYC LLC05/17/2022
DOB NOWPlumbingSigned-offIPS PLUMBING CORP01/25/2022
DOB NOWGeneral ConstructionPermit IssuedBORI CONSTRUCTION CORP01/22/2022
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC11/16/2021
DOB NOWGeneral ConstructionSigned-offA.L.L. CONSTRUCTION AND D11/03/2021
BISPLISSUEDTMS PLBG & HEATING CORP04/14/2021
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION03/24/2021
BISMHISSUEDNEW HOME CITY INC11/09/2020
BISOTISSUEDWAI KEE CONSTRUCTION INC07/27/2020
BISPLISSUEDFLYTIGER P & H LTD02/20/2020
BISPLISSUEDTMS PLBG & HEATING CORP04/15/2019
BISOTISSUEDNEW HOME CITY INC04/05/2019
BISPLISSUEDFLYTIGER P & H LTD10/31/2018
BISMHISSUEDWAI KEE CONSTRUCTION INC07/30/2018
BISPLISSUEDFLYTIGER P & H LTD11/09/2017
BISOTISSUEDWAI KEE CONSTRUCTION INC10/24/2017
BISOTISSUEDWAI KEE CONSTRUCTION INC08/04/2016
BISPLISSUEDTW PLUMBING & HEATING INC06/13/2016
+ 37 more permits on file
3 projects · most recent 08/17/2026
Water/Sanitary
FiledStatusContractorScope
08/17/2026——Water/Sanitary
04/16/2026Permit IssuedALKLEM PLUMBING INCWater/Sanitary
08/19/2025Permit IssuedAQUA BLUE PLBG SVCES CORPWater/Sanitary
15 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026CompleteI&E ELECTRIC, INC—
06/24/2026CompleteUS1 ELECTRIC CORP—
05/19/2026Permit IssuedLINA ELECTRIC, CORPGeneral Wiring
04/14/2026Permit IssuedDONALD MCGEACHY, INC.General Wiring
07/29/2025CompleteFOREST ELECTRIC CORP.General Wiring
07/23/2025Permit IssuedR.A. PHILLIPS ELEC'L CONTGeneral Wiring
06/30/2025CompleteBIG CITY ELECL SOLUTIONS—
11/04/2022Permit IssuedELPO ELECTRICAL CONTG INC—
11/01/2022CompletePRUDENT ELECTRIC INC—
06/27/2022Permit IssuedVERTEX ELECTRIC CORP.General Wiring
05/18/2022Permit IssuedR.A. PHILLIPS ELEC'L CONTGeneral Wiring
11/18/2021CompleteRESPONSE ELECTRIC INC.General Wiring
07/14/2020CompleteKOPP ELECTRIC CORPGeneral Wiring
07/23/2018CompleteGOTHAM WIRING LICENSEDGeneral Wiring
07/11/2018CompleteVALLEY ELECTRIC OF NY INC—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
08/04/2026Final—progress
08/04/2026Lighting in dwelling units—energy_progress
04/24/2026Fire-Resistant Penetrations and JointsRene Navarretespecial
04/24/2026Tenant Protection Plan ComplianceRene Navarretespecial
02/20/2026Fire-Resistant Penetrations and JointsAlyssa Manfredoniaspecial
02/20/2026FinalAlyssa Manfredoniaprogress
02/11/2026Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
01/31/2025FinalEsther Cheungprogress
01/16/2025FinalAnik Pearsonprogress
01/16/2025Maintenance informationJACK GREENenergy_progress
01/16/2025FinalJACK GREENprogress
01/16/2025HVAC-R and service water heating system controlsJACK GREENenergy_progress
01/16/2025HVAC-R and service water heating equipmentJACK GREENenergy_progress
01/16/2025Mechanical SystemsJACK GREENspecial
09/10/2024Fire-Resistant Penetrations and JointsThomas Morbitzerspecial
09/10/2024Lighting in dwelling unitsThomas Morbitzerenergy_progress
09/10/2024Lighting controlsThomas Morbitzerenergy_progress
09/09/2024FinalThomas Morbitzerprogress
02/13/2024MasonryMark LiCalzispecial
02/13/2024Structural Stability – Alterations of existing buildingsMark LiCalzispecial
02/13/2024Construction Operations Influencing Adjacent StructuresMark LiCalzispecial
02/13/2024Tenant Protection Plan ComplianceMark LiCalzispecial
02/13/2024FinalMark LiCalziprogress
01/23/2024FinalThomas Vailprogress
01/23/2024Lighting controlsThomas Vailenergy_progress
Latest 25 of 44.
▾Documents — 732 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
09/03/2026M00570588-I1Request digital key ↗
09/03/2026M00570588-P2Request digital key ↗
09/03/2026M00570588-P1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits152
▸BISWORK PERMIT APPLICATION67
03/24/2021140985174Open ↗
11/09/2020140829735Open ↗
07/30/2019123182778Open ↗
Showing 3 of 67 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION56
05/11/2021140985174Open ↗
05/07/2021140930250Open ↗
02/08/2021140985174Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWLPC Approval/Permit29
09/03/2026M00570588-P1Open ↗
09/03/2026M00570588-I1Open ↗
08/18/2026M01440629-I1Open ↗
Showing 3 of 29 on file for this type
▸Seals & Professional Certifications162
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION51
02/25/2019110049910Open ↗
04/20/2018122777423Open ↗
09/25/2017123182778Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/03/2026M00570588-I1Open ↗
09/03/2026M00570588-P1Open ↗
09/03/2026M00585413-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/27/2026M00589673-P1Open ↗
09/27/2026M00589673-P1Open ↗
09/25/2026M01108077-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
11/16/2015122566035Open ↗
Showing 1 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/25/2026M01108077-I1Open ↗
09/01/2026M01168375-I1Open ↗
08/26/2026M01363632-S1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
07/28/2020140930250Open ↗
11/16/2015122566035Open ↗
06/01/2015140355194Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/08/2021140985174Open ↗
07/28/2020140930250Open ↗
06/01/2015140355194Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/28/2020140930250Open ↗
06/01/2015140355194Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/08/2021140985174Open ↗
02/01/2019140829735Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment58
▸BISSELF-CERT PLUMBING NOTICE24
10/07/2015121747618Open ↗
10/05/2015121747618Open ↗
Showing 2 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING21
08/27/2020123182778Open ↗
03/19/2019140829735Open ↗
02/01/2019140829735Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
02/14/2018123182778Open ↗
09/25/2017123182778Open ↗
05/19/2016122777423Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
05/24/2017121138376Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES4
07/28/2020140930250Open ↗
02/01/2019140829735Open ↗
09/25/2017123182778Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
10/25/2017123182778Open ↗
Showing 1 of 3 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
03/12/2021140985174Open ↗
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/26/2026M01440629-S1Open ↗
09/26/2026M01440629-I1Open ↗
09/03/2026M00570588-P1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
02/16/2021140985174Open ↗
07/28/2020140930250Open ↗
03/15/2019140829735Open ↗
Showing 3 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance52
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
04/20/2018122777423Open ↗
09/25/2017123182778Open ↗
04/10/2017121747618Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
08/04/2021140829735Open ↗
07/15/2021140985174Open ↗
06/23/2021140985174Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/04/2021140829735Open ↗
08/04/2021140829735Open ↗
02/19/2021123182778Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
02/08/2021140985174Open ↗
07/28/2020140930250Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00589673-I1Open ↗
08/13/2026M00570543-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY14
08/04/2021140829735Open ↗
08/04/2021140829735Open ↗
08/04/2021140829735Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs76
▸BISLANDMARKS APPROVAL29
02/08/2021140985174Open ↗
07/28/2020140930250Open ↗
03/21/2019140829735Open ↗
Showing 3 of 29 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
08/04/2021140829735Open ↗
07/20/2021140985174Open ↗
02/19/2021123182778Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLANDMARKS SIGNOFF1
08/04/2021140829735Open ↗
▸BISSHED LETTER1
06/03/2016140355194Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M01174990-P1Open ↗
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT51
08/04/2021140829735Open ↗
06/23/2021140985174Open ↗
06/23/2021140985174Open ↗
Showing 3 of 51 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
11/09/2020140829735Open ↗
05/24/2016122566035Open ↗
08/17/2015121747618Open ↗
▸Filing & Intake Forms54
▸BISADDITIONAL INFORMATION23
02/16/2021140985174Open ↗
03/21/2019140829735Open ↗
03/15/2019140829735Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET21
09/25/2017123182778Open ↗
05/19/2016122777423Open ↗
11/16/2015122566035Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/08/2021140985174Open ↗
07/28/2020140930250Open ↗
02/01/2019140829735Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
02/25/2019110049910Open ↗
04/20/2018122777423Open ↗
03/09/2018122777423Open ↗
Showing 3 of 4 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
02/20/2015122174663Open ↗
Showing 1 of 7 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
07/20/2021140985174Open ↗
06/23/2021140985174Open ↗
Showing 2 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026M01168160-I1Open ↗