RoofUnder Construction24p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents
PROPOSED FACADE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THETE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 8Under Construction24p · 2 filings · 15 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 7Under Construction24p · 2 filings · 15 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 6Under Construction57p · 3 filings · 20 docs
ArchitectureDMFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
MONTEFIORE - ORTHOPEDIC RENO 6TH FLOOR - SPRINKLER MODIFICTIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 2 drawing sheets
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 5Under Construction25p · 2 filings · 15 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 4Under Construction27p · 3 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
MONTEFIORE - 4E ACUTE REHAB RENO - GENERAL CONSTRUCTION INCLUDING NEW, PARTITIONS, CEILING, AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
29 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 3Under Construction25p · 2 filings · 15 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 2Under Construction29p · 3 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 2 drawing sheets
Montefiore - Wakefield OR Ceiling Replacement - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
23 documents
Floor 1Under Construction25p · 2 filings · 15 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 2 drawing sheets
CellarUnder Construction26p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Sprinklers · Standpipe
To provide a support pad on the ground for a proposed transformer. Increasing the size of a door opening through the basement wall.
On file for this project
11 documents
WAKEFIELD - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies. GC X01359314-I1 filed in conjunction with this SP/SD application.
On file for this project
9 documents · 1 drawing sheet
WAKEFIELD - Selective removal of existing ceiling systems throughout various areas of the hospital to allow for the installation of new sprinkler piping, sprinkler heads, and associated components as per plans. No change in use or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.