← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Brightwater Tower Condominium
501 SURF AVENUE · BIN 3320628
💬 Discuss this project
1964Year Built
24Stories
RMBuilding Class
R6Zoning
686,208 sfGross Floor Area
1,287Units
LL97 CoveredRent Stabilized98 Open Violations 97 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 335,533 sf lot · 2.05 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
BulkheadUnder Construction1p · 1 filing · 5 docs
Floor 223p · 1 filing · 12 docs
Floor 213p · 1 filing · 6 docs
Floor 201p · 1 filing · 10 docs
Floor 19
Floor 18Under Construction9p · 1 filing · 16 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 101p · 1 filing · 3 docs
Floor 9
Floor 8
Floor 74p · 1 filing · 6 docs
Floor 6
Floor 51p · 1 filing · 3 docs
Floor 42p · 1 filing · 11 docs
Floor 32p · 2 filings · 7 docs
Floor 2
Floor 1Under Construction16p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALOQUA ENTERPRISES503/22/2026
BRIGHTWATER TOWERS403/22/2026
BRIGHTWATER TOWERS CONDOMINIUM6903/22/2026
EXCELL MANG SERVICE INC/203/22/2026
TO THE OWNER OF203/22/2026
EXCEL MANAGING SERVICE IN103/22/2026
601 SURF AVE LLC103/22/2026
SAME403/21/2026
UNIT 6E OWNER103/21/2026
FIRST SERVICE RESIDENTIAL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ION DESIGN2803/21/2026
CORE CONSULTANTS NYC1103/21/2026
AE DESIGN SOLUTION603/21/2026
LEVIN ENGINEERING PLLC603/21/2026
ALEXANDER TRUBIN DESIGN203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
DOMANI CONSULTING203/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDREAM LLCGeneral Contractor2808/08/2026
PRIME DEVELOPMENT, INCGeneral Contractor2607/08/2026
UP HOUSE DESIGN INGeneral Contractor1507/08/2026
VSP MECHANICAL INCPlumbing1307/08/2026
GRANDEUR HILLS GROUP INCGeneral Contractor407/08/2026
AIR COOLING & HEATING INCGeneral Contractor407/08/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor407/08/2026
GARANT CONSTRUCTION INCGeneral Contractor403/21/2026
HIGHLEVEL GROUP INCGeneral Contractor303/21/2026
LENS ELECTRIC, INCElectrical303/22/2026
LEONID ARLYUKElectrical303/21/2026
KINGS ELECTRIC CO INC 002683General Contractor303/22/2026
PIONEER RSTORATION PAINT*General Contractor303/21/2026
FIREQUESTPlumbing303/22/2026
NICE PLUMBING CORPPlumbing207/08/2026
RITE WAY PLUMBING & HEATINGPlumbing207/08/2026
FINIX U.S.A. CONSTRUCTIONGeneral Contractor203/21/2026
WTG ELECTRIC INC.Electrical203/22/2026
DOTSENKO, VLADIMIRElectrical203/21/2026
ALMA DESIGN INCGeneral Contractor203/21/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
MCDONALD TIMOTHYElectrical103/21/2026
FALCO ELEC'L SERVICES INCElectrical103/22/2026
ACCESS PLUMBING CORPPlumbing108/26/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SONI ENGINEERING CONSULTI9819106/11/2026
HAWA ENGINEERING PC7982103/30/2026
A&B WORLD CONSULTING, INC5704906/25/2025
LEONID BUKHGALTER, P.E.11503306/13/2025
CHONG ENGINEERING P.C.7411507/25/2024
SANDEEP GUNNALA ENGINEERI8482112/02/2022
RV ENGINEERS, PC.5953110/17/2019
Building Lifecycle
All (300)Filed (40)Permit Issued (53)Signed Off (28)Facade (FISP) (2)Violation (56)Inspection (24)Objection (67)Special Inspection (30)
08/07/2026
Permit issued — Mechanical Systems
B01221815-I1-GC-CX
06/26/2026
Permit issued — Suspended Scaffold
B01414409-I1-SC
06/24/2026
Objection raised — Other
06/24/2026
Objection resolved — Addressed
06/23/2026
Permit issued — Curb Cut
B01287700-I1-CC
06/11/2026
Signed off — Alteration
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans. No change in use, egress, or occupancy.
B01205158-S1
06/11/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
B01414409-I1
06/11/2026
Signed off — Alteration
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans. No change in use, egress, or occupancy.
B01205158-S2
06/09/2026
Signed off — Alteration
B01173096-I1
06/09/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
06/09/2026
Special inspection requirement — Post-installed Anchors
nayan soni
06/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/29/2026
Permit issued — Plumbing
B01234568-S1-PL
05/28/2026
Violation issued (HPD, open)
C
04/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Permit issued — Plumbing
B01205158-S2-PL
04/08/2026
Permit issued — Mechanical Systems
B01205158-S1-MS
03/30/2026
Filed — Alteration
Proposed to renovate interior of an existing apartment, no change in occupancy, use and egress under this application.
B01234568-S1
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WASEEM HAKEEM
03/26/2026
Permit issued — Structural
B00367207-I1-ST
03/24/2026
Permit issued — General Construction
B00615266-I1-GC
03/06/2026
Special inspection requirement — Final
WASEEM HAKEEM
03/04/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Cost
02/26/2026
Filed — Alteration
Proposed to renovate interior of an existing apartment, no change in occupancy, use and egress under this application.
B01234568-P1
02/26/2026
Special inspection requirement — Final
WASEEM HAKEEM
01/20/2026
Permit issued — Suspended Scaffold
B01173096-I1-SC
12/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/16/2025
Filed — Alteration
B01287700-I1
08/11/2025
Signed off — Alteration
APPLICATION IS FILLED FOR THE INTERIOR RENOVATION OF AN EXISTING APARTMENT. REMOVAL OF NON-BEARING PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01225466-I1
07/28/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
07/14/2025
Permit issued — Plumbing
B01221815-S1-PL
07/10/2025
Permit issued — General Construction
B01234568-I1-GC
07/08/2025
Objection raised — Other
07/08/2025
Objection raised — Cost
06/25/2025
Filed — Alteration
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans. No change in use, egress, or occupancy.
B01205158-S1
06/25/2025
Filed — Alteration
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans. No change in use, egress, or occupancy.
B01205158-S2
06/25/2025
Permit issued — General Construction
B01221815-I1-GC-CX
06/25/2025
Objection raised — Other
06/25/2025
Objection resolved — Addressed
06/20/2025
Signed off — Alteration
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGHING. REPLACEMENT OF BATHTUB WITH NEW SHOWER. NEW WASHER IN THE BATHROOM. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01132432-I1
06/20/2025
Signed off — Alteration
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGHING. REPLACEMENT OF BATHTUB WITH NEW SHOWER. NEW WASHER IN THE BATHROOM. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01132432-S1
06/17/2025
Filed — Alteration
Proposed to renovate interior of an existing apartment, no change in occupancy, use and egress under this application.
B01234568-I1
06/13/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT #18G. NEW DUCTLESS AIR CONDITION SYSTEM. NEW PASSAGE TO ADJOINING APARTMENT 18F UNDER SAME OWNERSHIP. RELOCATION OF NON-BEARING PARTITIONS. NEW INTERIOR FINISHES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01221815-S1
06/13/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT #18G. NEW DUCTLESS AIR CONDITION SYSTEM. NEW PASSAGE TO ADJOINING APARTMENT 18F UNDER SAME OWNERSHIP. RELOCATION OF NON-BEARING PARTITIONS. NEW INTERIOR FINISHES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01221815-I1
06/12/2025
Signed off — Alteration
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGHING. NEW WASHER IN BATHROOM. NEW DISHWASHER. REPLACE BATHTUB WITH NEW SHOWER. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01131467-S1
06/12/2025
Signed off — Alteration
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGHING. NEW WASHER IN BATHROOM. NEW DISHWASHER. REPLACE BATHTUB WITH NEW SHOWER. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01131467-I1
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Bomstein
06/10/2025
Permit issued — General Construction
B01225466-I1-GC
06/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/04/2025
Objection resolved — Addressed
06/02/2025
Objection resolved — Addressed
06/02/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Scope
05/29/2025
Objection raised — Scope
05/28/2025
Permit issued — General Construction
B01205158-I1-GC
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBUILDREAM LLC08/07/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC06/26/2026
DOB NOWCurb CutPermit IssuedPRIME DEVELOPMENT, INC06/23/2026
DOB NOWPlumbingSigned-offRITE WAY HEATING CORP05/29/2026
DOB NOWPlumbingSigned-offARUUM INTERIOR LLC04/08/2026
DOB NOWMechanical SystemsSigned-offAIR COOLING & HEATING INC04/08/2026
DOB NOWStructuralPermit IssuedPRIME DEVELOPMENT, INC03/26/2026
DOB NOWGeneral ConstructionPermit IssuedPRIME DEVELOPMENT, INC03/24/2026
DOB NOWSuspended ScaffoldSigned-offPROTO RESTORATION CONSTRU01/20/2026
DOB NOWPlumbingPermit IssuedEMR MECHANICAL CORP07/14/2025
DOB NOWGeneral ConstructionPermit IssuedPIONEER RSTORATION PAINT*07/10/2025
DOB NOWGeneral ConstructionPermit IssuedBUILDREAM LLC06/25/2025
DOB NOWGeneral ConstructionSigned-offALMA DESIGN06/10/2025
DOB NOWGeneral ConstructionPermit IssuedPRIME DEVELOPMENT, INC05/28/2025
DOB NOWGeneral ConstructionPermit IssuedPRIME DEVELOPMENT, INC04/01/2025
DOB NOWStructuralPermit IssuedPRIME DEVELOPMENT, INC03/31/2025
DOB NOWMechanical SystemsPermit IssuedAIR COOLING & HEATING INC02/25/2025
DOB NOWSuspended ScaffoldSigned-offPROTO RESTORATION CONSTRU02/18/2025
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP02/18/2025
DOB NOWGeneral ConstructionPermit IssuedPRIME DEVELOPMENT, INC01/27/2025
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP01/23/2025
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP01/23/2025
DOB NOWGeneral ConstructionSigned-offBUILDREAM LLC01/22/2025
DOB NOWSprinklersSigned-offFIREQUEST CORP01/16/2025
DOB NOWGeneral ConstructionSigned-offBUILDREAM LLC12/04/2024
DOB NOWMechanical SystemsSigned-offBUILDREAM LLC11/27/2024
DOB NOWMechanical SystemsPermit IssuedAIR COOLING & HEATING INC09/16/2024
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP09/11/2024
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP08/22/2024
DOB NOWMechanical SystemsPermit IssuedBUILDREAM LLC07/22/2024
DOB NOWGeneral ConstructionSigned-offBUILDREAM LLC06/24/2024
DOB NOWGeneral ConstructionSigned-offPROTO RESTORATION CONSTRU04/23/2024
DOB NOWStructuralPermit IssuedPRIME DEVELOPMENT, INC04/03/2024
DOB NOWGeneral ConstructionPermit IssuedPRIME DEVELOPMENT, INC04/03/2024
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP10/03/2023
DOB NOWMechanical SystemsSigned-offUP HOUSE DESIGN IN09/29/2023
DOB NOWGeneral ConstructionSigned-offBUILDREAM LLC09/01/2023
DOB NOWMechanical SystemsPermit IssuedAIR COOLING & HEATING INC07/25/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/13/2023
DOB NOWGeneral ConstructionSigned-offKHAIKA CONSTRUCTION INC07/05/2023
+ 60 more permits on file
4 projects · most recent 06/25/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2025Signed-offAIR COOLING & HEATING INCAir Conditioning Systems
Cooling
Daikin 4MXLH36WVJU9 3 tons · Heat Pump Outdoor ×4
06/13/2025Permit IssuedBUILDREAM LLCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-4C36NA2 36,000 BTU · Condensing Unit ×1
07/10/2024Permit IssuedBUILDREAM LLCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-4C36NA2 36,000 BTU · Condensing Unit ×1
12/02/2022Permit IssuedAIR COOLING & HEATING INCAir Conditioning Systems
Cooling
National Comfort Products NCPE-430-4010 136,000 BTU · Condensing Unit ×5
1 project · most recent 11/11/2020
FiledStatusContractorScope
11/11/2020Signed-offFIREQUEST CORP29 heads
4 projects · most recent 06/25/2025
Water/Sanitary
FiledStatusContractorScope
06/25/2025Signed-offACCESS PLUMBING CORPWater/Sanitary
06/13/2025Permit IssuedEMR MECHANICAL CORPWater/Sanitary
07/10/2024Signed-offEMR MECHANICAL CORPWater/Sanitary
10/04/2022——Water/Sanitary
25 projects · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedFOREST BROOK ELEC'L CONTRGeneral Wiring
07/22/2026Permit IssuedWTG ELECTRIC INC.General Wiring
04/15/2026Permit IssuedI.S.M. ELECTRIC, INC.General Wiring
12/19/2025Permit IssuedWTG ELECTRIC INC.General Wiring
12/19/2025Permit IssuedWTG ELECTRIC INC.General Wiring
09/17/2025CompleteKINGS ELECTRIC CO., INC.General Wiring
08/07/2025CompleteACCURATE ELEC'L CORP.General Wiring
07/16/2025CompleteWTG ELECTRIC INC.General Wiring
07/01/2025CompleteSEGA ELECTRIC LLCGeneral Wiring
05/22/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
04/02/2025CompleteLENS ELECTRIC, INCGeneral Wiring
03/14/2025CompleteLENS ELECTRIC, INCGeneral Wiring
02/15/2025CompleteLENS ELECTRIC, INCGeneral Wiring
01/21/2025CompleteLENS ELECTRIC, INCGeneral Wiring
12/24/2024CompleteLENS ELECTRIC, INCGeneral Wiring
1 project · most recent 09/25/2020
Steel Concrete
FiledStatusContractorScope
09/25/2020Permit IssuedPRIME DEVELOPMENT, INCSteel, Concrete
1 project · most recent 06/11/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/11/2026Permit IssuedDNA CONTRACTING LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 37
DateTypeResultReport
06/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/30/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/27/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 37.
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
06/09/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
06/09/2026Post-installed Anchorsnayan sonispecial
03/30/2026Fire-Resistant Penetrations and JointsWASEEM HAKEEMspecial
03/06/2026FinalWASEEM HAKEEMprogress
02/26/2026FinalWASEEM HAKEEMprogress
06/12/2025Energy Code Compliance InspectionsAlexander Bomsteinprogress
06/12/2025Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
05/18/2025Energy Code Compliance InspectionsLeonid Bukhgalterprogress
05/18/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Leonid Bukhgalterspecial
05/18/2025Fire-Resistant Penetrations and JointsLeonid Bukhgalterspecial
05/18/2025Fire-Resistant Penetrations and JointsLeonid Bukhgalterspecial
05/18/2025Energy Code Compliance InspectionsLeonid Bukhgalterprogress
05/18/2025HVAC-R and service water heating equipmentLeonid Bukhgalterenergy_progress
05/18/2025HVAC-R and service water piping design and insulationLeonid Bukhgalterenergy_progress
05/18/2025Lighting in dwelling unitsLeonid Bukhgalterenergy_progress
05/16/2025Tenant Protection Plan ComplianceAlexander Bomsteinspecial
05/14/2025FinalAlexander Bomsteinprogress
05/14/2025Lighting in dwelling unitsAlexander Bomsteinenergy_progress
05/14/2025Energy Code Compliance InspectionsAlexander Bomsteinprogress
05/14/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Alexander Bomsteinspecial
05/14/2025Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
05/06/2025FinalLeonid Bukhgalterprogress
05/06/2025Mechanical SystemsLeonid Bukhgalterspecial
05/01/2025Fire-Resistant Penetrations and JointsLeonid Bukhgalterspecial
04/25/2025Fire-Resistant Penetrations and JointsLeonid Bukhgalterspecial
Latest 25 of 101.
▾Documents — 1,321 on file (BIS + DOB NOW)
▸Plans & Drawings80
▸DOB NOWPlans/Sketch63
09/01/2026B00493275-I1Request digital key ↗
09/01/2026B00559733-I1Request digital key ↗
09/01/2026B00559718-I1Request digital key ↗
Showing 3 of 63 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00229798-I1Request digital key ↗
09/02/2026B00248294-I1Request digital key ↗
09/02/2026B00371295-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00453780-I1Request digital key ↗
09/01/2026B00461156-I1Request digital key ↗
09/01/2026B00458825-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00367207-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00248305-I1Request digital key ↗
09/01/2026B00461156-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00228788-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits209
▸BISPLAN / WORK APPROVAL APPLICATION112
01/23/2026321920025Open ↗
12/03/2025321920025Open ↗
11/08/2024321547313Open ↗
Showing 3 of 112 on file for this type
▸BISWORK PERMIT APPLICATION80
01/26/2022340374231Open ↗
11/26/2021340374231Open ↗
11/08/2021321547313Open ↗
Showing 3 of 80 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸Zoning, Tax Lot & Property Records19
▸BISFLOOD ZONE DESIGN CERTIFICATION15
08/13/2020340755187Open ↗
08/10/2020321547313Open ↗
07/23/2020340746107Open ↗
Showing 3 of 15 on file for this type
▸BISFLOOD ZONE COMPLIANCE3
10/30/2024321547313Open ↗
08/18/2020340755187Open ↗
07/22/2020340747981Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications306
▸DOB NOWDPL-1: Design Professional Seal & Signature77
09/02/2026B00431560-I1Open ↗
09/01/2026B00453780-I1Open ↗
09/01/2026B00461156-I1Open ↗
Showing 3 of 77 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 62 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/30/2026B01132432-I1Open ↗
09/30/2026B01132432-I1Open ↗
09/30/2026B01132432-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
09/30/2026B01132432-I1Open ↗
09/30/2026B01132432-I1Open ↗
09/27/2026B00615266-I1Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT29
08/13/2020340755187Open ↗
07/22/2020340747981Open ↗
Showing 2 of 29 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY20
08/13/2020340755187Open ↗
07/23/2020340746107Open ↗
07/22/2020340747981Open ↗
Showing 3 of 20 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION18
08/13/2020340755187Open ↗
07/22/2020340747981Open ↗
Showing 2 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
01/02/2021340798275Open ↗
07/23/2020340746107Open ↗
07/22/2020340747981Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment40
▸BISSCHEDULE B - PLUMBING16
09/29/2020340374231Open ↗
Showing 1 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/04/2021321523151Open ↗
01/04/2021321523151Open ↗
▸Safety & Tenant Protection50
▸BISTenant Protection Plan and Notes32
07/23/2020340746107Open ↗
08/13/2020340755187Open ↗
07/22/2020340747981Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWTenant Protection Plan12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSTREET TREE CHECKLIST5
08/03/2020321547313Open ↗
Showing 1 of 5 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/07/2021340798275Open ↗
▸Environmental & Asbestos103
▸DOB NOWDEP ACP-5: Asbestos Assessment Report70
09/01/2026B00453780-I1Open ↗
09/01/2026B00461156-I1Open ↗
09/01/2026B00465135-I1Open ↗
Showing 3 of 70 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
08/13/2020340755187Open ↗
07/23/2020340746107Open ↗
07/22/2020340747981Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance129
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
10/28/2024321547313Open ↗
05/07/2021340746107Open ↗
12/15/2020322010355Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY21
10/19/2021321547313Open ↗
05/07/2021340746107Open ↗
12/17/2020321523151Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.15
09/01/2026B00559733-I1Open ↗
09/01/2026B00583434-I1Open ↗
Showing 2 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS12
07/23/2020340746107Open ↗
Showing 1 of 12 on file for this type
▸BISNYCECC ANALYSIS6
07/22/2020340747981Open ↗
Showing 1 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
10/30/2024321547313Open ↗
12/17/2020321523151Open ↗
08/15/2020340551307Open ↗
▸BISEXTERIOR LIGHTING POWER1
10/30/2024321547313Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/30/2024321547313Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/30/2024321547313Open ↗
▸BISLIGHTING CONTROLS1
10/30/2024321547313Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
10/30/2024321547313Open ↗
▸Inspections & Test Reports55
▸BISTECHNICAL REPORT: RESPONSIBILITY46
11/14/2024321547313Open ↗
11/14/2024321547313Open ↗
11/11/2024321547313Open ↗
Showing 3 of 46 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED1
12/17/2020321523151Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/30/2024321547313Open ↗
▸Approvals, Objections & Sign-offs73
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST44
11/20/2024321547313Open ↗
01/20/2023321967065Open ↗
05/07/2021340746107Open ↗
Showing 3 of 44 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
10/31/2022340743075Open ↗
11/08/2021321547313Open ↗
11/02/2021321547313Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
01/23/2026321920025Open ↗
10/04/2024321920025Open ↗
10/03/2024321920025Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/31/2026B00692264-I1Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership87
▸BISCOST AFFIDAVIT75
05/07/2021340746107Open ↗
01/02/2021340798275Open ↗
12/15/2020322010355Open ↗
Showing 3 of 75 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
10/30/2024321547313Open ↗
12/17/2020321523151Open ↗
08/15/2020340551307Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
08/13/2020340746107Open ↗
▸Filing & Intake Forms141
▸BISADDITIONAL INFORMATION55
02/18/2026321920025Open ↗
10/04/2024321920025Open ↗
10/04/2024321920025Open ↗
Showing 3 of 55 on file for this type
▸BISBOROUGH INTAKE FORM39
11/23/2021340374231Open ↗
08/12/2021321920025Open ↗
08/12/2021340798275Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING COVER SHEET26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET21
01/02/2021340798275Open ↗
08/13/2020340755187Open ↗
07/23/2020340746107Open ↗
Showing 3 of 21 on file for this type
▸Other Documents17
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS6
08/10/2020321547313Open ↗
07/23/2020340746107Open ↗
Showing 2 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDHCR DOCUMENT2
08/15/2020340551307Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL INSECTION TO BE DONE BY REGISTERED PROFESSIONAL AS PER BB 2018-008.1
11/15/2024321547313Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISECCCNYS ANALYSIS1
07/20/2020340739268Open ↗