| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01412486 ↗ | 54 HIGHLAND PLACE BROOKLYN | Alteration | Permit Issued | 06/18/2026 | 09/17/2026 | Design ALAN YANG ARCHITECTURE Contractor RIGHT CHOICE CONSTRUCTION Filer SUN | Structural work for Interior renovation |
| M01434772 ↗ | 870 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 08/19/2026 | Owner 1870 WEave LLC Contractor PM MECHANICAL GROUP CORP | Interior renovation of existing 2 family residence. Work to include layout changes, new finishes, new partitions and doors, new ceiling fini… |
| B01198633 ↗ | 240 AMHERST STREET BROOKLYN | Alteration | Permit Issued | 04/11/2025 | 07/27/2026 | Design ZPROEKT ARCHITECTURE Contractor DIMEX GROUP INC | PROPOSED HORIZONTAL ENLARGEMENT TO EXISTING ONE-FAMILY RESIDENTIAL HOUSE, NO CHANGE IN USE EGGRESS OR OCCUPANCY |
| B00667725 ↗ | 175 HALSEY STREET BROOKLYN | Alteration CO | Permit Issued | 02/16/2022 | 06/22/2026 | Design NC2 ARCHITECTURE LLC Owner GECKO BUILDS LLC Contractor GECKO BUILDS, LLC | Install and replace the existing floor joist and install a new metal deck. No change of use, egress, or occupancy under this application |
| B00950767 ↗ | 600 6 STREET BROOKLYN | Alteration | Permit Issued | 12/03/2023 | 03/30/2026 | Design ARCHSTUDIO INC Contractor JOHN HLAD P & H CO., INC Filer JENNY FLORES EXPEDITING | HEREBY FILING FOR THE RENOVATION OF CELLAR FOR ONE FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00443177 ↗ | 250 SHERMAN STREET BROOKLYN | Alteration | Permit Issued | 01/06/2021 | 03/10/2026 | Design JOHN P. FOX, ARCHITECT, PC. Owner 250 SHERMAN LLC Contractor VENDOLA INC Filer CORNERSTONE CONSULTING | minor plumbing work |
| Name | Projects together | Most recent |
|---|---|---|
| RV ENGINEERS, PC | 24 | 06/22/2026 |
| CONCORD CONSULTING ENGINEERING PC | 5 | 11/14/2022 |
| GC ENG & ASSOCIATES, PC | 4 | 12/08/2025 |
| AR Figueroa Architect LLC | 2 | 11/21/2024 |
| ARCHSTUDIO INC | 2 | 12/16/2025 |
| BILOW ENGINEERING, LLC | 2 | 11/21/2024 |
| CAMERON ENGINEERING | 2 | 11/21/2024 |
| STEPHANIE GELB, ARCHITECT | 2 | 07/31/2026 |
| ALAN YANG ARCHITECTURE | 1 | 06/22/2026 |
| ALL CITY ENGINEERING, P.C. | 1 | 02/21/2025 |
| AMOIA CODY ARCHITECTURE | 1 | 07/01/2024 |
| BEN HERZOG ARCHITECT PC | 1 | 07/30/2026 |
| CHARLES G. MICHEL ENGINEERING, PC. | 1 | 09/30/2019 |
| COMMONCRAFT ARCHITECTURE PLLC | 1 | 07/22/2025 |
| ERNST ARCHITECT PLLC | 1 | 07/30/2026 |
| EXDEM ENGINEERING SERVICES | 1 | 11/13/2024 |
| FABIAN CRUZ PE PLLC | 1 | 06/22/2023 |
| GERALD RUMPLICK | 1 | 11/21/2024 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 10/15/2024 |
| HSL ARCHITECT P.C. | 1 | 06/17/2022 |
| INM ARCHITECTS PC | 1 | 06/05/2023 |
| IVAN DESIGN ENG. ANALYSIS, PLLC | 1 | 09/30/2019 |
| JAG ENGINEERING, LLC | 1 | 07/22/2025 |
| JOHN P. FOX, ARCHITECT, PC. | 1 | 08/07/2025 |
| ME ENGINEERS | 1 | 08/07/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| ELITE GC NY INC | 4 | 01/30/2026 |
| REAL TRUE CONSTRUCTION IN | 3 | 09/13/2023 |
| A&H EXPRESS PLBG&HTG CORP | 2 | 06/05/2023 |
| EGNATIA CONSTRUCTION INC | 2 | 07/31/2026 |
| F.S. SITE CORP | 2 | 11/21/2024 |
| GECKO BUILDS, LLC | 2 | 04/14/2026 |
| MJM ASSOCIATES CONSTR LLC | 2 | 11/21/2024 |
| PAL-MAR PLBG & HTG INC | 2 | 11/21/2024 |
| PRIME PIPING & HEATING IN | 2 | 11/14/2022 |
| SDS LEONARD LLC | 2 | 11/13/2024 |
| SUNNYSIDE MASONRY INC | 2 | 04/28/2025 |
| ACE'S MECHANIC INC | 1 | 07/26/2021 |
| ALL PRO PLBG & HTG INC | 1 | 08/07/2020 |
| AMERICAN RESIDENTIAL CON* | 1 | 08/26/2025 |
| ANK GENERAL INC | 1 | 01/27/2023 |
| ASE HVAC INC | 1 | 06/22/2026 |
| BIG APPLE CHIMNEY LLC | 1 | 01/29/2021 |
| BT'S PLUMBING AND HEATING | 1 | 07/30/2026 |
| CDC HOUSING INC | 1 | 12/04/2021 |
| CENTURY GENERAL CONTRACTI | 1 | 12/16/2025 |
| CITY PLUMBING INC | 1 | 08/13/2026 |
| DIMEX GROUP INC | 1 | 08/13/2026 |
| EAGL CONSTRUCTION GROUP | 1 | 11/21/2024 |
| EZ RUNER CONSTRUCTION COR | 1 | 11/10/2025 |
| FACADE RES GROUP LLC | 1 | 08/30/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| TRUST MANAGEMENT | 4 | 11/24/2025 |
| HEIGHTS ADVISORS | 3 | 02/21/2025 |
| CITY URBAN REALTY | 2 | 11/21/2024 |
| 1870 WEave LLC | 1 | 07/23/2026 |
| 250 SHERMAN LLC | 1 | 08/07/2025 |
| 3392 GUIDER AVE CONDOMINIUM ASSOCIA | 1 | 04/20/2023 |
| 417 CLINTON STREET CONDO ASSN. | 1 | 11/14/2023 |
| B GANS MANAGEMENT | 1 | 07/26/2021 |
| GECKO BUILDS LLC | 1 | 04/14/2026 |
| MAXX PROPERTIES | 1 | 03/05/2025 |
| NIDOJ REALTY CORP. | 1 | 06/24/2021 |
| PATOMA INC | 1 | 07/22/2025 |
| Salinas | 1 | 04/28/2025 |
| VISION ENTERPRISEWS | 1 | 06/17/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| BMB BUILDING CONSULTING INC. | 7 | 01/30/2026 |
| WILLIAM VITACCO ASSOCIATES | 2 | 11/21/2024 |
| A1 EXPEDITING SERVICE CORP. | 1 | 11/21/2024 |
| AMOIA CODY ARCHITECTURE | 1 | 07/01/2024 |
| BIG ORANGE EXPEDITING, INC | 1 | 12/04/2021 |
| CORNERSTONE CONSULTING | 1 | 08/07/2025 |
| CYAN PLANNING & CONSULTING CORP. | 1 | 07/23/2026 |
| DOMANI CONSULTING | 1 | 11/10/2025 |
| ERNST ARCHITECT, PLLC | 1 | 07/30/2026 |
| EXPEDITE DEM INC | 1 | 11/13/2024 |
| G-NADO INC | 1 | 04/20/2023 |
| HM CONSULTING & EXPEDITING INC. | 1 | 08/13/2026 |
| JENNY FLORES EXPEDITING | 1 | 08/26/2025 |
| JM ZONING, LLC. | 1 | 07/26/2021 |
| LLOYD NOEL BUILDING CONSULTANT | 1 | 04/14/2026 |
| METROPOLIS GROUP INC | 1 | 07/22/2025 |
| NOEL BUILDING CONSULTING INC | 1 | 04/14/2026 |
| O R A C | 1 | 06/05/2023 |
| QUICK FILING OF NY INC | 1 | 02/21/2025 |
| RIGHT WAY SERVICES NYC, INC. | 1 | 07/30/2026 |
| SUN | 1 | 06/22/2026 |
| TARLAN DESIGN BUILD, LLC | 1 | 07/31/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01412486 ↗ | 54 HIGHLAND PLACE BROOKLYN | Alteration | Permit Issued | 06/18/2026 | 09/17/2026 | Design ALAN YANG ARCHITECTURE Contractor RIGHT CHOICE CONSTRUCTION Filer SUN | Structural work for Interior renovation |
| M01434772 ↗ | 870 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 08/19/2026 | Owner 1870 WEave LLC Contractor PM MECHANICAL GROUP CORP | Interior renovation of existing 2 family residence. Work to include layout changes, new finishes, new partitions and doors, new ceiling fini… |
| B01198633 ↗ | 240 AMHERST STREET BROOKLYN | Alteration | Permit Issued | 04/11/2025 | 07/27/2026 | Design ZPROEKT ARCHITECTURE Contractor DIMEX GROUP INC | PROPOSED HORIZONTAL ENLARGEMENT TO EXISTING ONE-FAMILY RESIDENTIAL HOUSE, NO CHANGE IN USE EGGRESS OR OCCUPANCY |
| B00667725 ↗ | 175 HALSEY STREET BROOKLYN | Alteration CO | Permit Issued | 02/16/2022 | 06/22/2026 | Design NC2 ARCHITECTURE LLC Owner GECKO BUILDS LLC Contractor GECKO BUILDS, LLC | Install and replace the existing floor joist and install a new metal deck. No change of use, egress, or occupancy under this application |
| B00950767 ↗ | 600 6 STREET BROOKLYN | Alteration | Permit Issued | 12/03/2023 | 03/30/2026 | Design ARCHSTUDIO INC Contractor JOHN HLAD P & H CO., INC Filer JENNY FLORES EXPEDITING | HEREBY FILING FOR THE RENOVATION OF CELLAR FOR ONE FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00443177 ↗ | 250 SHERMAN STREET BROOKLYN | Alteration | Permit Issued | 01/06/2021 | 03/10/2026 | Design JOHN P. FOX, ARCHITECT, PC. Owner 250 SHERMAN LLC Contractor VENDOLA INC Filer CORNERSTONE CONSULTING | minor plumbing work |
| M01263808 ↗ | 145 EAST 15 STREET MANHATTAN | Alteration | Permit Issued | 09/04/2025 | 02/13/2026 | Design STEPHANIE GELB, ARCHITECT Contractor EGNATIA CONSTRUCTION Filer TARLAN DESIGN BUILD, LLC | RENOVATION OF APARTMENT 9U AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO OCCUPANCY USE OR EGRESS |
| B01135098 ↗ | 161 VAN DYKE STREET BROOKLYN | Full Demolition | Permit Issued | 11/13/2024 | 01/29/2026 | Design EXDEM ENGINEERING SERVICES Owner HEIGHTS ADVISORS Contractor SDS LEONARD LLC Filer EXPEDITE DEM INC | mechanical means will assist with structure demolition, in accordance with approved full demo plans. |
| B01323408 ↗ | 25 BEAVER STREET BROOKLYN | Alteration | Signed-off | 11/24/2025 | 12/26/2025 | Design RV ENGINEERS, PC Owner TRUST MANAGEMENT Contractor MJH CONSTRUCTION CORP | Remove partial vacate order VIO25-01073. Repair damaged wall finishes in apartments 2R and 3R. Repair sheetrock at 3rd floor ceiling. Replac… |
| B01202503 ↗ | 819 AVENUE W BROOKLYN | Alteration | Permit Issued | 03/31/2025 | 08/22/2025 | Design GC ENG & ASSOCIATES, PC Contractor ELITE GC NY INC | TO LEGALIZE AN EXISTING INSTALLATION OF THREE (3) SPLIT AC UNITS WHICH WERE INSTALLED OUTSIDE ON THE FIRST FLOOR. FILING IS TO CLEAR THE FOL… |
| X00894247 ↗ | 951 OLMSTEAD AVENUE BRONX | Alteration | Signed-off | 06/22/2023 | 08/15/2025 | Design FABIAN CRUZ PE PLLC Owner HEIGHTS ADVISORS Contractor PTK RESTORATIONS LLC | INSTALLATION OF EMERGENCY GENERATOR AND GENERATOR FUEL STORAGE SYSTEM, AS SHOWN ON PLANS FILED HEREWITH. |
| B00796633 ↗ | 545 METROPOLITAN AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 10/18/2022 | 06/11/2025 | Owner PATOMA INC Contractor PATOMA INC Filer METROPOLIS GROUP INC | Support of excavation work |
| M00992667 ↗ | 3 EAST 63 STREET MANHATTAN | Alteration | Permit Issued | 10/29/2024 | 05/30/2025 | Design GC ENG & ASSOCIATES, PC Contractor ANTHONY CAIAZZO | SPRINKLER WORKS IN CONJUNCTION WITH ALT-1 JOB# 140984317 |
| M01215310 ↗ | 136 9 AVENUE MANHATTAN | Alteration | Permit Issued | 04/28/2025 | 05/16/2025 | Design Simplestruct NY Owner Salinas Contractor SUNNYSIDE MASONRY INC | Concrete ramp adjacent to front entryway (on outside of building) |
| M08039796 ↗ | 105 WEST 78 STREET MANHATTAN | Alteration | Signed-off | 05/24/2023 | 04/23/2025 | Design VERSAI LLC Contractor VG CONTRACTING INC | BALCONY REPAIRS AS SHOWN ON THE DRAWINGS FILED HEREWITH. NO CHANGES TO USE, EGRESS, OR OCCUPANCY |
| B01138670 ↗ | 179 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 11/21/2024 | 04/16/2025 | Design GERALD RUMPLICK Contractor EAGL CONSTRUCTION GROUP | LEGAL COMBINATION AND INTERIOR RENOVATION OF APARTMENTS 4F & 4G. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B08025668 ↗ | 385 EAST 18 STREET BROOKLYN | Alteration | Permit Issued | 11/16/2022 | 04/15/2025 | Owner MAXX PROPERTIES Contractor SILEDA.RENOVATION CORP | Subsequent application filed for installing new Area Drains in OSP. |
| B00449840 ↗ | 200 BERKELEY PLACE BROOKLYN | Alteration | Permit Issued | 03/12/2021 | 03/26/2025 | Design BEN HERZOG ARCHITECT PC Contractor PEPAJ CONSTRUCTION CORP | Subsequent application for structural work in connection with general construction of existing 2-family residence. Includes rear facade open… |
| B01120643 ↗ | 483 13 STREET BROOKLYN | Alteration | Signed-off | 12/05/2024 | 01/06/2025 | Design SP ARCHITECTURE Contractor GEO CREATE SOLUTIONS INC Filer DOMANI CONSULTING | Work includes construction of partitions to separate storage areas, the replacement of a stair assembly in the existing cellar of existing t… |
| M01002140 ↗ | 3 EAST 63 STREET MANHATTAN | Alteration | Permit Issued | 02/16/2024 | 12/12/2024 | Design RV ENGINEERS, PC Contractor ELITE GC NY INC | SISTER EXISTING BASEMENT - 4TH FLOOR WOOD JOISTS WITH WOOD JOISTS. PARTIAL REPLACEMENT OF ROOF WOOD JOISTS WITH CFS JOISTS. PROVIDE AUXILLAR… |
| M00992435 ↗ | 3 EAST 63 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/29/2024 | — | Design GC ENG & ASSOCIATES, PC | — |
| M00995449 ↗ | 3 EAST 63 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/29/2024 | — | Design GC ENG & ASSOCIATES, PC | — |
| B01109826 ↗ | 2270 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 09/19/2024 | 09/24/2024 | Design RV ENGINEERS, PC Contractor KD CONSTRUCTION* | Repair damaged CMU walls of 1 story addition, repair ceiling sheetrock |
| B01058315 ↗ | 8002 HARBOR VIEW TERRACE BROOKLYN | Alteration | Signed-off | 06/17/2024 | 06/24/2024 | Design AMOIA CODY ARCHITECTURE Contractor NEW YORK PARK PLBG&HTG CO Filer AMOIA CODY ARCHITECTURE | RELOCATING BATHROOM, ADDING EXTERIOR SHOWER HEAD. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| B08017407 ↗ | 95 NORTH 6 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 10/14/2022 | 05/21/2024 | Design CAMERON ENGINEERING Owner CITY URBAN REALTY Contractor MJM ASSOCIATES CONSTR LLC | Structural work including partial demolition in conjunction with alt-CO to comply with NB requirements. PAA filed herewith to indicate revis… |
| B08017402 ↗ | 97 NORTH 6 STREET BROOKLYN | New Building | Permit Issued | 10/14/2022 | 05/08/2024 | Design AR Figueroa Architect LLC Owner CITY URBAN REALTY Contractor MJM ASSOCIATES CONSTR LLC | Structural work for new building. PAA filed herewith to indicate revised drawings. |
| X01014550 ↗ | 945 WHITE PLAINS ROAD BRONX | Alteration | Signed-off | 03/07/2024 | 03/21/2024 | Design RV ENGINEERS, PC Contractor SDS LEONARD LLC | EMERGENCY STABILIZATION OF REAR FACADE CMU PIER |
| B00962496 ↗ | 417 CLINTON STREET BROOKLYN | Alteration | Signed-off | 11/14/2023 | 12/04/2023 | Design RV ENGINEERS, PC Contractor SUNNYSIDE MASONRY INC | REPLACEMENT OF BASEMENT FLOOR JOISTS WITH CFS JOISTS |
| B00211316 ↗ | 341 EAST 25 STREET BROOKLYN | Alteration | Signed-off | 08/29/2019 | 11/03/2023 | Contractor GECKO BUILDS, LLC | Structural to existing townhouse, Interior and exterior work on the 1st and cellar. and rear yard. |
| B00932743 ↗ | 189 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 09/13/2023 | 09/22/2023 | Design RV ENGINEERS, PC Owner TRUST MANAGEMENT Contractor REAL TRUE CONSTRUCTION IN | Replace deteriorated trimmer at chimney, wood floor frame of 5th Floor. Provide temporary shoring during replacement on 4th and 3rd Floors |
| B00860791 ↗ | 3392 GUIDER AVENUE BROOKLYN | Alteration | Signed-off | 04/20/2023 | 09/14/2023 | Design RV ENGINEERS, PC Contractor G-NADO INC Filer G-NADO INC | INSTALLATION OF TEMPORARY SHORING TO RESTRAIN REAR FACADE SUPPORTING BEAM AND BALCONY OF 2ND FLOOR |
| Q00817055 ↗ | 84-14 91 STREET QUEENS | Alteration | Signed-off | 01/27/2023 | 02/10/2023 | Design RV ENGINEERS, PC Contractor ANK GENERAL INC | Repair/replace selective portions of existing retaining wall in rear/side yard of lot # 6 and adjacent property 90-14 Park lane South Lot # … |
| M00744005 ↗ | 1201 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 06/16/2022 | 01/20/2023 | Design RV ENGINEERS, PC Owner VISION ENTERPRISEWS Contractor ELITE GC NY INC | Subsequent filing for new opening between 2 existing stores . |
| M00449373 ↗ | 1561 2 AVENUE MANHATTAN | Alteration | Permit Issued | 07/08/2021 | 01/19/2023 | Contractor ELITE GC NY INC | PROPOSE STRUCTURAL STEEL WORKS FOR SUPPORTING OF NEW CREATED OPENING ON BEARING WALL AT FIRST FLOOR; PARTIAL DEMOLITION, AND SHORING WORKS A… |
| B00762165 ↗ | 23 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 07/26/2022 | 10/20/2022 | Design STEPHANIE GELB, ARCHITECT Contractor EGNATIA CONSTRUCTION | Subsequent Application to Modify plumbing fixtures in apt # 3 on 3rd floor. |
| B00549235 ↗ | 868 NEW YORK AVENUE BROOKLYN | Alteration | Signed-off | 07/07/2021 | 09/21/2022 | Design RV ENGINEERS, PC Contractor REAL TRUE CONSTRUCTION IN | Demolition Means and methods plans filed in conjunction with Alt I # 321588616. No change to egress, occupancy or use. |
| B00471497 ↗ | 27 MACKAY PLACE BROOKLYN | Alteration | Signed-off | 03/16/2021 | 09/20/2022 | Design INM ARCHITECTS PC Contractor A&H EXPRESS PLBG&HTG CORP Filer O R A C | Propose to relocate and install new fixtures to horizontal enlargement filed under application 340755971. |
| B07994864 ↗ | 834 MONROE STREET BROOKLYN | Alteration | Signed-off | 08/30/2022 | 09/06/2022 | Design RV ENGINEERS, PC Contractor FACADE RES GROUP LLC | REPOINT AND REPAIR BUILDING EXTERIOR MASONRY FACADE. |
| B00576187 ↗ | 353A 14 STREET BROOKLYN | Alteration | Permit Issued | 09/03/2021 | 03/09/2022 | Design ARCHSTUDIO INC Contractor CENTURY GENERAL CONTRACTI | Install a new mini-split ductless air conditioning system for a single family townhouse. Adding a new Roof Deck with Steel beams resting on … |
| B00352155 ↗ | 868 NEW YORK AVENUE BROOKLYN | Alteration | Signed-off | 07/10/2020 | 03/03/2022 | Owner TRUST MANAGEMENT Contractor PRIME PIPING & HEATING IN | Install wet pipe sprinkler systems throughout. |
| B00362559 ↗ | 868 NEW YORK AVENUE BROOKLYN | Alteration | Signed-off | 07/10/2020 | 01/31/2022 | Owner TRUST MANAGEMENT Contractor PRIME PIPING & HEATING IN | INSTALL NEW PLUMBING FIXTURES THROUGHOUT AND ASSOCIATED SANITARY, VENT, HOT WATER, COLD WATER AND RE-CIRCULATION PIPING AS SHOWN ON FLOOR PL… |
| B00631064 ↗ | 123 WINDSOR PLACE BROOKLYN | Alteration | Signed-off | 11/20/2021 | 12/17/2021 | Design RV ENGINEERS, PC Contractor CDC HOUSING INC | STRUCTURAL WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00481608 ↗ | 63 LAFAYETTE AVENUE BROOKLYN | Alteration | Signed-off | 03/12/2021 | 11/17/2021 | Design RV ENGINEERS, PC Contractor KG MANAGEMENT CNSLTNG | SHORING AND REPAIR OF EXISTING SIDEWALK VAULT AND STAIR |
| B00467682 ↗ | 481 MCDONALD AVENUE BROOKLYN | Alteration | Signed-off | 02/19/2021 | 11/05/2021 | Design RV ENGINEERS, PC Contractor JB & JB CONSTRUCTION & | ADDRESS ECB VIOLATION # 35451673P, REMOVE WOODEN EXTENSION 10'(H) X 14' (W) X 19'REMOVE COVERED AREA, AS SHOWN ON PLAN AT CELLAR EGRESS MAK… |
| B00352161 ↗ | 868 NEW YORK AVENUE BROOKLYN | Alteration | Permit Issued | 12/08/2020 | 10/28/2021 | Design RV ENGINEERS, PC Contractor REAL TRUE CONSTRUCTION IN | STRUCTURAL FRAMING OF EXISTING CELLAR AND TWO FLOORS FOR HORIZONTAL AND VERTICAL EXTENSION, AS PER ALT1 #321588616. |
| B00545879 ↗ | 157 VAN DYKE STREET BROOKLYN | New Building | Filed — no permit on record | 09/16/2021 | — | Owner HEIGHTS ADVISORS Filer QUICK FILING OF NY INC | — |
| B00204786 ↗ | 9 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 08/07/2019 | 07/13/2021 | Design TSF ENGINEERING, PC Contractor BIG APPLE CHIMNEY LLC | Revise Chimney location as indicated on plans. No change to egress, occupancy or use. |
| B00361496 ↗ | 707 GREENWOOD AVENUE BROOKLYN | Alteration | Permit Issued | 08/07/2020 | 07/13/2021 | Design ME ENGINEERS Contractor ALL PRO PLBG & HTG INC | FILING HEREWITH PLUMBING WORK AS PER PLANS |
| B00540044 ↗ | 174 LINCOLN ROAD BROOKLYN | Alteration | Filed — no permit on record | 06/24/2021 | — | Design RV ENGINEERS, PC Owner NIDOJ REALTY CORP. | — |
| B00477251 ↗ | 1373 EAST 93 STREET BROOKLYN | Alteration | Signed-off | 03/15/2021 | 04/01/2021 | Design RV ENGINEERS, PC Contractor MEDITERRANEAN CONSTRUCTIO | INSTALL DOUBLE WALERS AT 3 WINDOWS ON BOTH SIDE WALLS WITH 3 7/8 TIE RODS, TEMPORARY WOOD SHORING TO SUPPORT FRAMING OF 1 FL AND ROOF. PULL… |
| M00372763 ↗ | 486 AVENUE OF THE AMER MANHATTAN | Alteration | Filed — no permit on record | 08/27/2020 | — | — | |
| B00369315 ↗ | 707 GREENWOOD AVENUE BROOKLYN | Alteration | Filed — no permit on record | 07/20/2020 | — | Design RV ENGINEERS, PC | — |
| B00257488 ↗ | 62 DE SALES PLACE BROOKLYN | Alteration | Signed-off | 11/22/2019 | 02/06/2020 | Contractor YEDID BUILDERS INC | Install Split system units on roof and associated components throughout as indicated on plans. No change to egress, occupancy or use. |
| M00228978 ↗ | 761 5 AVENUE MANHATTAN | Alteration | Signed-off | 09/30/2019 | 01/09/2020 | Contractor FORTE EXPRESS P & H INC | Modification to sprinkler system as shown on drawings filed herewith. No change in use, egress or occupancy. |
| B00248305 ↗ | 501 SURF AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2019 | 11/18/2019 | Design RV ENGINEERS, PC Contractor ANSANO CONSTRUCTION CORP | Install split system condenser and air handlers in apt 11M. No change to egress,occupancy or use. |
| M00228814 ↗ | 761 5 AVENUE MANHATTAN | Alteration | Signed-off | 09/30/2019 | 10/21/2019 | Contractor REBOSIO CONSTRUCTION SVC | Infill framing for existing stair opening as shown on drawings filed herewith. No change in use, egress or occupancy. |
| B00199249 ↗ | 80 NORTH 3 STREET BROOKLYN | Alteration | Signed-off | 07/31/2019 | 09/13/2019 | Owner B GANS MANAGEMENT Contractor ACE'S MECHANIC INC Filer JM ZONING, LLC. | Installation of 3 mini split units and associated air handlers and equipment. No change to egress, occupancy or use. |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/22/2026 | Final | 870 WEST END AVENUE | Plato Marinakos | progress |
| 07/22/2026 | Fire-Resistance Rated Construction | 870 WEST END AVENUE | Plato Marinakos | progress |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | 870 WEST END AVENUE | GUERMAN VAINBLAT | special |
| 06/09/2026 | Concrete - Cast-In-Place | 54 HIGHLAND PLACE | GUERMAN VAINBLAT | special |
| 06/09/2026 | Structural Steel - Details | 54 HIGHLAND PLACE | GUERMAN VAINBLAT | special |
| 06/09/2026 | Structural Steel - Welding | 54 HIGHLAND PLACE | GUERMAN VAINBLAT | special |
| 06/09/2026 | Structural Stability – Alterations of existing buildings | 54 HIGHLAND PLACE | GUERMAN VAINBLAT | special |
| 06/09/2026 | Masonry | 54 HIGHLAND PLACE | GUERMAN VAINBLAT | special |
| 06/04/2026 | Final | 54 HIGHLAND PLACE | GUERMAN VAINBLAT | progress |
| 04/13/2026 | Permanent certificate | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Interior lighting power | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Fenestration and door U-factor and product ratings | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Electric vehicle service equipment requirements | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Subsurface Investigations (Borings/Test Pits) | 240 AMHERST STREET | SAMER ABOU-GHAIDA | special |
| 04/13/2026 | Structural Stability – Alterations of existing buildings | 240 AMHERST STREET | GUERMAN VAINBLAT | special |
| 04/13/2026 | Mechanical Systems | 240 AMHERST STREET | GUERMAN VAINBLAT | special |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | 240 AMHERST STREET | GUERMAN VAINBLAT | special |
| 04/13/2026 | Concrete - Cast-In-Place | 240 AMHERST STREET | GUERMAN VAINBLAT | special |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | 175 HALSEY STREET | Richard Goodstein | special |
| 04/13/2026 | Structural Stability – Alterations of existing buildings | 175 HALSEY STREET | GUERMAN VAINBLAT | special |
| 04/13/2026 | Fire-Resistance Rated Construction | 175 HALSEY STREET | Richard Goodstein | progress |
| 04/13/2026 | Metering | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Fenestration air leakage | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | HVAC-R and service water heating system controls | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | HVAC-R and service water piping design and insulation | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Maintenance information | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | HVAC-R and service water heating equipment | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Insulation placement and R values | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Fenestration areas | 240 AMHERST STREET | GUERMAN VAINBLAT | energy_progress |
| 04/13/2026 | Structural Wood Frame | 240 AMHERST STREET | GUERMAN VAINBLAT | progress |
| 04/13/2026 | Lowest Floor Elevation | 240 AMHERST STREET | GUERMAN VAINBLAT | progress |
| 04/13/2026 | Footing and Foundation | 240 AMHERST STREET | GUERMAN VAINBLAT | progress |
| 04/13/2026 | Fire-Resistance Rated Construction | 240 AMHERST STREET | GUERMAN VAINBLAT | progress |
| 04/13/2026 | Final | 240 AMHERST STREET | GUERMAN VAINBLAT | progress |
| 04/13/2026 | Energy Code Compliance Inspections | 240 AMHERST STREET | GUERMAN VAINBLAT | progress |
| 04/13/2026 | Wood – Prefabricated I-Joists | 240 AMHERST STREET | ALEKSANDR LEVIN | special |
| 02/09/2026 | Insulation placement and R values | 145 EAST 15 STREET | GUERMAN VAINBLAT | energy_progress |
| 02/09/2026 | Lighting controls | 145 EAST 15 STREET | GUERMAN VAINBLAT | energy_progress |
| 02/09/2026 | Lighting in dwelling units | 145 EAST 15 STREET | GUERMAN VAINBLAT | energy_progress |
| 02/09/2026 | Interior lighting power | 145 EAST 15 STREET | GUERMAN VAINBLAT | energy_progress |
| 02/09/2026 | Final | 145 EAST 15 STREET | GUERMAN VAINBLAT | progress |
| 02/09/2026 | Fire-Resistant Penetrations and Joints | 145 EAST 15 STREET | GUERMAN VAINBLAT | special |
| 01/30/2026 | Structural Wood Frame | 3 EAST 63 STREET | GUERMAN VAINBLAT | progress |
| 01/30/2026 | Final | 3 EAST 63 STREET | GUERMAN VAINBLAT | progress |
| 01/30/2026 | Structural Steel - Details | 3 EAST 63 STREET | GUERMAN VAINBLAT | special |
| 01/30/2026 | Fire-Resistant Penetrations and Joints | 3 EAST 63 STREET | GUERMAN VAINBLAT | special |
| 01/30/2026 | Structural Cold-Formed Steel | 3 EAST 63 STREET | GUERMAN VAINBLAT | special |
| 01/30/2026 | Structural Stability – Alterations of existing buildings | 3 EAST 63 STREET | GUERMAN VAINBLAT | special |
| 01/30/2026 | Masonry | 3 EAST 63 STREET | GUERMAN VAINBLAT | special |
| 01/28/2026 | Structural Wood Frame | 240 AMHERST STREET | GUERMAN VAINBLAT | progress |