← Back
BuildNYC
Apartment hotel
601 WEST 110TH STREET
MANHATTAN · Morningside Heights · BIN 1057320
💬 Discuss this project
1908Year Built
13Stories
H6Building Class
R8Zoning
164,315 sfGross Floor Area
3Units
LL97 CoveredRent Stabilized6 Active Violations ▸FISP: SWARMP
Apartment hotel · Owner of record: Atlas V 110 · 15,910 sf lot · 10.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary pipe scaffold and beam system1 filing
RoofMechanical unit installation2p · 2 filings · 20 docs
Floor 12Fisp Cycle 9A Repairs1p · 1 filing · 13 docs
Floor 11Fisp Cycle 9A Repairs1p · 1 filing · 13 docs
Floor 10Fisp Cycle 9A Repairs3p · 1 filing · 13 docs
Floor 9Plumbing demolition and renovation4p · 2 filings · 11 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Fisp Cycle 9A Repairs1p · 1 filing · 13 docs
Floor 3
Floor 2
Floor 1Five Guys4p · 4 filings · 13 docs
CellarFive Guys1p · 3 filings · 20 docs
Site & exteriorFive Guys6 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Atlas Capital Group5307/08/2026
Shelly Associates1203/21/2026
Chipotle Mexican Grill603/22/2026
110 Atlas V603/21/2026
Shely503/21/2026
Atlas V 110103/22/2026
Sloans Supermarket103/21/2026
Fiveguys103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/06/2018$72.2M—SAPROP ASSOCIATES LLC → ATLAS V 110 LLC$439/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1907/08/2026
Preserv BLD Restoration ManagementScaffold603/21/2026
Preserv BLD Restoration ManagementGeneral Contractor507/08/2026
Cuffaro Electric CompanyElectrical303/21/2026
RedanaGeneral Contractor303/21/2026
NU-Way Heating & Coolingspecialty_contractor203/21/2026
Berkshire Refrigeration Sspecialty_contractor104/09/2026
Signs CadSign hanger107/08/2026
L&J PLG & Heating Co of NYPlumbing107/08/2026
Tri State Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering1957108/26/2025
Cany Architecture & Engineering1125204/07/2025
DNA Controlled Inspection554104/07/2025
Project Tactical Solution5859107/26/2024
NS Engineering & Consulting3652403/02/2023
Socotec Engineering4983108/11/2022
PSI Agency254107/14/2020
Kendall Engineering4154102/18/2020
Building Lifecycle
All (168)Filed (21)Permit Issued (27)Signed Off (11)Facade (FISP) (21)Violation (60)Inspection (2)Special Inspection (26)
04/20/2026
Signed off — Alteration
ERECT A SET OF HALO LIT CHANNEL LETTERS WALL SIGN A.
M01158165-I1
04/14/2026
Signed off — Alteration
M01237388-I1
08/28/2025
Permit issued — Mechanical Systems
M01237388-I1-MS
08/26/2025
Filed — Alteration
M01237388-I1
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
08/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Smerina
08/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
07/16/2025
Special inspection requirement — Maintenance information
Giuseppe Anzalone
07/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01085800-I1
07/09/2025
Signed off — Alteration
M01000769-I1
07/09/2025
Signed off — Alteration
Renewal of SR22/2241
M00980642-I1
06/06/2025
Special inspection requirement — Final
Giuseppe Anzalone
06/06/2025
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
06/03/2025
Signed off — Alteration
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00468815-I1
06/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY STORAGE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
M00840846-I1
05/20/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & BEAM SYSTEM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00746315-I1
05/12/2025
Signed off — Alteration
Filing application for facade repair work as per plan filed herewith. No change in use, egress, and occupancy.
M00637261-I1
05/07/2025
Cycle 9 facade report signed — SWARMP
05/05/2025
Cycle 9 facade report submitted
05/02/2025
Cycle 9 facade inspection completed
04/07/2025
Filed — Alteration
Filing application for facade repair work as per plan filed herewith. No change in use, egress, and occupancy.
M00637261-P1
03/23/2025
Special inspection requirement — Structural Steel - Details
WILLIAM FITZJOHN
03/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM FITZJOHN
03/23/2025
Special inspection requirement — Final
Kate Groob
03/23/2025
Special inspection requirement — Structural Steel - Welding
WILLIAM FITZJOHN
03/23/2025
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM FITZJOHN
03/23/2025
Special inspection requirement — Masonry
ERIN FISHER
03/23/2025
Special inspection requirement — Post-installed Anchors
WILLIAM FITZJOHN
03/17/2025
Permit issued — Protection and Mechanical Methods
M01000769-I1-PMM
02/27/2025
Permit issued — Sidewalk Shed
M00468815-I1-SH
02/27/2025
Permit issued — Supported Scaffold
M00746315-I1-SF
02/27/2025
Permit issued — Protection and Mechanical Methods
M00840846-I1-PMM
01/10/2025
Permit issued — Sign
M01158165-I1-SG
01/09/2025
Filed — Alteration
ERECT A SET OF HALO LIT CHANNEL LETTERS WALL SIGN A.
M01158165-I1
12/19/2024
Permit issued — Suspended Scaffold
M00980642-I1-SC
10/08/2024
Cycle 9 facade report submitted
10/08/2024
Cycle 9 facade inspection completed
10/08/2024
Cycle 9 facade report signed — UNSAFE
08/20/2024
Filed — Alteration
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01085800-I1
08/20/2024
Permit issued — Protection and Mechanical Methods
M01085800-I1-PMM
08/14/2024
Permit issued — Structural
M00637261-I1-GC-CX
07/26/2024
Filed — Alteration
INTERIOR RENOVATIONS FOR 5 GUYS RESTAURANT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01055242-I1
06/07/2024
Permit issued — Supported Scaffold
M00746315-I1-SF
05/22/2024
Special inspection requirement — Final
THOMAS MESUK
05/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
03/28/2024
Permit issued — Protection and Mechanical Methods
M00840846-I1-PMM
03/15/2024
Filed — Alteration
M01000769-I1
03/15/2024
Permit issued — Protection and Mechanical Methods
M01000769-I1-PMM
02/27/2024
Permit issued — Sidewalk Shed
M00468815-I1-SH
01/10/2024
Permit issued — Suspended Scaffold
M00980642-I1-SC
12/22/2023
Filed — Alteration
Renewal of SR22/2241
M00980642-I1
08/25/2023
Permit issued — General Construction
M00637261-I1-GC-CX
06/07/2023
Permit issued — Supported Scaffold
M00746315-I1-SF
05/18/2023
Signed off — Alteration
Interior renovation - plumbing for new tenant fit out associated with job number M00800186
M00805300-I1
05/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & BEAM SYSTEM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00746315-P2
05/09/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE - NEW TENANT FIT OUT FOR EATING AND DRINKING ESTABLISHMENT. NEW NON-LOAD BEARING PARTION, COUNTERS AND FLOORING. NEW WALK-IN REFRIGERATION AND FREEZER WITH ASSOCAITED CONDENSERS.
M00800186-I1
03/29/2023
Filed — Alteration
INSTALLATION OF TEMPORARY STORAGE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
M00840846-I1
03/29/2023
Permit issued — Protection and Mechanical Methods
M00840846-I1-PMM
03/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBerkshire Refrigeration S08/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management03/17/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/27/2025
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding02/27/2025
DOB NOWSignSigned-offSigns Cad01/10/2025
DOB NOWSuspended ScaffoldPermit IssuedPreserv BLDNG RST Management I12/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management08/20/2024
DOB NOWStructuralSigned-offPreserv BLD Restoration Management08/14/2024
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding03/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management03/15/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/27/2024
DOB NOWSuspended ScaffoldPermit IssuedPreserv BLDNG RST Management I01/10/2024
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management08/25/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding03/29/2023
DOB NOWPlumbingSigned-offDW Plumbing02/24/2023
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/23/2023
DOB NOWGeneral ConstructionSigned-offRedana01/10/2023
DOB NOWGeneral ConstructionSigned-offNU-Way Heating & Cooling01/10/2023
DOB NOWStructuralSigned-offPreserv BLD Restoration Management09/02/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding05/27/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/24/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/04/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/19/2021
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY07/24/2020
BISOTISSUEDAcg Construction Management06/19/2020
BISOTISSUEDConcept Air Conditioning06/20/2017
BISOTISSUEDSolomon Contracting10/19/2016
BISOTISSUEDAwr Group11/05/2015
BISEQISSUEDEverest Scaffolding09/25/2015
BISMHISSUEDXinli Construction07/08/2015
BISOTISSUEDV A.M.E. Iron Works11/14/2012
BISEQISSUEDV A.M.E. Iron Works10/22/2012
BISEQISSUEDS&E Bridge & Scaffold09/30/2011
BISOTISSUEDAwr Group08/16/2011
BISEQISSUEDEverest Scaffolding08/12/2011
BISOTISSUEDFabric Concepts for Ind*06/30/2011
BISOTISSUEDHeng Wei Construction02/17/2011
+ 37 more permits on file
2 projects · most recent 07/14/2020
Associated Ducts and Piping Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2020——Associated Ducts and Piping—
02/18/2020——Air Conditioning Systems
Cooling
York TCHD48 48,000 BTU · Condensing Unit ×4
TCHF48 48,000 BTU · Condensing Unit ×1
5 projects · most recent 10/07/2025
General Wiring
FiledStatusContractorScope
10/07/2025CompleteSigns Cad—
06/29/2023CompleteCuffaro Electric CompanyGeneral Wiring
02/11/2021Permit IssuedTop Shelf Electric—
07/03/2018CompleteMaximum ElectricGeneral Wiring
04/06/2018CompleteB & G Electrical Contracting of NY IGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/26/2025Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
08/26/2025Tenant Protection Plan ComplianceJoseph Smerinaspecial
08/26/2025HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
07/16/2025Maintenance informationGiuseppe Anzaloneenergy_progress
06/06/2025FinalGiuseppe Anzaloneprogress
06/06/2025Mechanical SystemsGiuseppe Anzalonespecial
03/23/2025Structural Steel - DetailsWILLIAM FITZJOHNspecial
03/23/2025Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
03/23/2025FinalKate Groobprogress
03/23/2025Structural Steel - WeldingWILLIAM FITZJOHNspecial
03/23/2025Structural Steel - High Strength BoltingWILLIAM FITZJOHNspecial
03/23/2025MasonryERIN FISHERspecial
03/23/2025Post-installed AnchorsWILLIAM FITZJOHNspecial
05/22/2024FinalTHOMAS MESUKprogress
05/22/2024Tenant Protection Plan ComplianceMax Leespecial
03/06/2023Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
01/05/2023Lighting in dwelling unitsJOHN STACOMenergy_progress
01/05/2023Energy Code Compliance InspectionsJOHN STACOMprogress
01/05/2023FinalJOHN STACOMprogress
01/05/2023Mechanical SystemsNARI MOTWANIspecial
01/05/2023Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
01/05/2023Lighting controlsJOHN STACOMenergy_progress
01/05/2023Maintenance informationJOHN STACOMenergy_progress
01/04/2023Fire-Resistant Penetrations and Joints—special
04/03/2020FinalMAURICIO ANDRADEprogress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Five GuysRestaurant / Food ServiceCellar, Floor 1
Project M01158165 Alteration · LOC Issued · 01/09/2025
Project M01055242 Alteration · Approved · 07/26/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 556 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch17
09/02/2026M00746315-P2Request digital key ↗
09/02/2026M00746315-P1Request digital key ↗
09/02/2026M00746315-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00288576-I1Request digital key ↗
09/04/2026M00340005-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00468815-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00340336-I1Request digital key ↗
▸Applications & Permits98
▸BISPLAN / WORK APPROVAL APPLICATION54
04/04/2023123917388Open ↗
03/21/2023123917388Open ↗
03/08/2023123917388Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION27
06/19/2020140914535Open ↗
07/31/2019123820071Open ↗
07/23/2019123760901Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWLPC Approval/Permit13
09/02/2026M00637261-I1Open ↗
09/01/2026M00800186-I1Open ↗
08/31/2026M00805300-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPLACE OF ASSEMBLY2
05/31/2019104634754Open ↗
11/05/2018104634754Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications111
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
11/18/2019123760901Open ↗
11/18/2019123760901Open ↗
07/01/2019123820071Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/04/2026M00340336-I1Open ↗
09/02/2026M00746315-P2Open ↗
09/02/2026M00746315-P1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
06/26/2019123820071Open ↗
06/18/2019123760901Open ↗
04/19/2017123065253Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
06/18/2020140914535Open ↗
06/26/2019123820071Open ↗
06/26/2019123820071Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/08/2026M00340005-I1Open ↗
09/01/2026M00800186-I1Open ↗
08/29/2026M00805300-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/08/2026M00340005-I1Open ↗
09/01/2026M00800186-I1Open ↗
09/01/2026M00800186-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/18/2020140914535Open ↗
09/24/2015140407147Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/18/2020140914535Open ↗
09/24/2015140407147Open ↗
▸Trade Schedules & Equipment38
▸BISEQUIPMENT USE PERMITS9
11/22/2019123760901Open ↗
11/22/2019123760901Open ↗
11/22/2019123760901Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
07/07/2020123820071Open ↗
06/22/2020123820071Open ↗
Showing 2 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
11/22/2019123760901Open ↗
08/18/2017123065253Open ↗
04/19/2017123065253Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/29/2020123820071Open ↗
12/04/2019123820071Open ↗
11/08/2019123820071Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection56
▸BISSRO MD ANTI-HARASSMENT CHECKLIST18
04/25/2023123917388Open ↗
06/18/2020140914535Open ↗
06/27/2019123820071Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist18
09/01/2026M00800186-I1Open ↗
08/31/2026M00805300-I1Open ↗
08/31/2026M00805300-P1Open ↗
Showing 3 of 18 on file for this type
▸BISSTREET TREE CHECKLIST8
04/19/2017123065253Open ↗
Showing 1 of 8 on file for this type
▸BISTenant Protection Plan and Notes6
07/23/2019123760901Open ↗
06/26/2019123820071Open ↗
06/18/2019123760901Open ↗
Showing 3 of 6 on file for this type
▸BISDS1-Demolition Submittal Certification Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00340005-I1Open ↗
08/13/2026M00288576-I1Open ↗
08/13/2026M00340336-I1Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/04/2026M00340336-I1Open ↗
09/02/2026M00637261-I1Open ↗
09/01/2026M00800186-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
06/18/2020140914535Open ↗
06/26/2019123820071Open ↗
06/18/2019123760901Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
11/18/2019123760901Open ↗
11/18/2019123760901Open ↗
07/01/2019123820071Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
04/02/2021123820071Open ↗
11/18/2019123760901Open ↗
10/20/2017123065253Open ↗
Showing 3 of 6 on file for this type
▸BISNYCECC EXEMPTION1
06/18/2020140914535Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/02/2021123820071Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/02/2021123820071Open ↗
06/19/2020140914535Open ↗
06/18/2020140914535Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
04/02/2021123820071Open ↗
11/18/2019123760901Open ↗
10/20/2017123065253Open ↗
Showing 3 of 24 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLANDMARKS APPROVAL6
08/14/2023123917388Open ↗
06/18/2020140914535Open ↗
07/23/2019123760901Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLANDMARKS SIGNOFF1
04/02/2021123820071Open ↗
▸BISHPD: INCLUSIONARY HOUSING LETTER1
10/12/2016122884478Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT33
04/02/2021123820071Open ↗
06/18/2020140914535Open ↗
11/18/2019123760901Open ↗
Showing 3 of 33 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
03/28/2023123917388Open ↗
03/28/2023123917388Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/06/2016140407147Open ↗
▸Filing & Intake Forms53
▸BISEFILING COVER SHEET22
03/08/2023123917388Open ↗
06/26/2019123820071Open ↗
06/26/2019123820071Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION19
06/20/2023123917388Open ↗
11/29/2019123820071Open ↗
11/08/2019123820071Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM8
03/08/2023123917388Open ↗
12/04/2019123820071Open ↗
11/18/2019123760901Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/18/2020140914535Open ↗
09/24/2015140407147Open ↗
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION18
06/20/2023123917388Open ↗
06/20/2023123917388Open ↗
06/20/2023123917388Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProof of Historic Building2
09/02/2026M00637261-I1Open ↗
08/13/2026M00637261-P1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/28/2023123917388Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00980642-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00980642-I1Open ↗