← Back
BuildNYC
Elevator apt, fireproof with stores
601 WEST 160TH STREET
MANHATTAN · BIN 1063350
💬 Discuss this project
1913Year Built
10Stories
D6Building Class
R8Zoning
109,022 sfGross Floor Area
71Units
LL97 CoveredRent Stabilized26 Active Violations 20 unresolved · 6 paperwork only 5 likely answered 3 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, fireproof with stores · Owner of record: 601 West Realty · 12,490 sf lot · 8.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof601 West Realty LLCUnder Construction1p · 1 filing · 3 docs
Floor 4Unit 4CUnder Construction4p · 2 filings · 20 docs
Floor 3601 West Realty LLC1 filing · 7 docs
Floor 2Unit 2CUnder Construction4p · 2 filings · 20 docs
Floor 1601 West Realty LLCUnder Construction35p · 4 filings · 20 docs
CellarSuccessful Management CORP28p · 1 filing · 20 docs
Site & exterior601 West Realty LLCUnder Construction4p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
601 West Realty Co6103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services208/14/2026
Philip Toscano Architects607/06/2026
CX Consulting205/14/2026
Jose M. Landauro, P.E110/01/2025
Arianna Braun Architects208/19/2025
E4P Consulting Engineering305/05/2025
Stratford104/30/2025
Withdrawn108/27/2020
Haider Engineering, P.E111/06/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Philip Toscano Architects203/21/2026
Outsource Consultants1203/21/2026
Right Way Services NYC203/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Billy EnterprisesScaffold707/08/2026
V.C. Global TechGeneral Contractor404/09/2026
Quest Builders GroupGeneral Contractor304/09/2026
Metro Contracting NYScaffold304/09/2026
Robin Electrical CoElectrical303/21/2026
Foster Electrical ServiceElectrical203/21/2026
Oasis PlomoGeneral Contractor107/28/2026
Modern Services SolutionsScaffold107/08/2026
Signore & Sons PlumbingPlumbing107/08/2026
WCK ElectricElectrical103/21/2026
Titan Electrical & Elev ContractingElectrical103/22/2026
Torres IvanElectrical103/21/2026
Boxwood ConstructionGeneral Contractor104/09/2026
Mega Construction ServiceGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899505/14/2026
Mohammad Ahead - Professi9286205/14/2026
Jose M. Landauro3500110/01/2025
HT Engineering6274505/05/2025
Stratford Engineering997104/30/2025
Philip Toscano, Architect2474208/15/2022
Building Lifecycle
All (202)Filed (20)Permit Issued (15)Facade (FISP) (16)Violation (60)Inspection (1)Objection (60)Special Inspection (30)
09/21/2026
Violation issued (ECB, open)
Construction
08/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00988847-P1
08/11/2026
Objection resolved — Resolved
08/10/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Structural
07/29/2026
Objection raised — Scope
07/28/2026
Objection raised — Energy
07/27/2026
Permit issued — General Construction
M01342589-I1-GC
07/15/2026
Violation issued (ECB, open)
Construction
07/06/2026
Filed — Alteration CO
SPLIT APTS #2C & #4C AT FLOORS 002 & 004. WORK INCLUDES NEW PARTITIONS AND DOORS, INSTALLATION OF NEW LIGHTING, AND FINISHES THROUGHOUT. AMEND C/O TO REMOVE SUPER'S APT. OBTAIN NEW C/O.
M01408968-S1
07/02/2026
Filed — Alteration CO
SPLIT APTS #2C & #4C AT FLOORS 002 & 004. WORK INCLUDES NEW PARTITIONS AND DOORS, INSTALLATION OF NEW LIGHTING, AND FINISHES THROUGHOUT. AMEND C/O TO REMOVE SUPER'S APT. OBTAIN NEW C/O.
M01408968-I1
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
06/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/22/2026
Special inspection requirement — Lighting in dwelling units
06/22/2026
Special inspection requirement — Insulation placement and R values
06/03/2026
Special inspection requirement — Structural Steel - Welding
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Sprayed fire-resistant materials
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Final
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Structural Cold-Formed Steel
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Structural Steel - Details
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Final
ARIEL GOLSHAN
05/14/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-P2
05/14/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-P1
05/11/2026
Permit issued — Suspended Scaffold
M01390285-I1-SC
05/05/2026
Cycle 10 facade report submitted
05/05/2026
Cycle 10 facade report signed — UNSAFE
04/29/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01390285-I1
04/29/2026
Violation issued (HPD, closed)
A
04/28/2026
Permit issued — Structural
M01276442-I1-GC-CX
04/28/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
04/20/2026
Cycle 10 facade inspection completed
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
A
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
03/20/2026
Permit issued — Structural
M01342589-S2-ST
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/04/2026
Objection raised — Cost
02/04/2026
Objection raised — Cost
01/27/2026
Violation issued (HPD, closed)
C
01/22/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-I1
01/22/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-S2
12/27/2025
Violation issued (HPD, closed)
C
12/22/2025
Permit issued — Plumbing
M00783119-S1-PL
12/10/2025
Violation issued (ECB, open)
Quality of Life
12/10/2025
Violation issued (ECB, open)
Quality of Life
Latest 60 of 202 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedOasis Plomo07/27/2026
DOB NOWSuspended ScaffoldPermit IssuedMega Construction Services05/11/2026
DOB NOWStructuralPermit IssuedMega Construction Service04/28/2026
DOB NOWStructuralPermit IssuedBoxwood Construction03/20/2026
DOB NOWPlumbingPermit IssuedSignore & Sons Plumbing12/22/2025
DOB NOWSidewalk ShedPermit IssuedMetro Contracting NY11/12/2025
DOB NOWGeneral ConstructionPermit IssuedV.C. Global Tech11/06/2025
DOB NOWMechanical SystemsPermit IssuedQuest Builders Group09/03/2025
DOB NOWGeneral ConstructionPermit IssuedQuest Builders Group06/11/2025
DOB NOWSidewalk ShedPermit IssuedMetro Contracting NY01/19/2024
DOB NOWGeneral ConstructionPermit IssuedV.C. Global Tech10/11/2022
DOB NOWSidewalk ShedPermit IssuedModern Services Solutions09/10/2020
DOB NOWSidewalk ShedPermit IssuedBilly Enterprises10/11/2019
DOB NOWSidewalk ShedPermit IssuedBilly Enterprises01/15/2019
DOB NOWSidewalk ShedPermit IssuedBilly Enterprises12/11/2018
BISEQISSUEDMega Construction Service09/13/2022
BISOTISSUEDMega Construction Service09/13/2022
BISEQISSUEDMega Construction Service09/13/2022
BISOTISSUEDMega Construction Service09/13/2022
BISOTISSUEDModern Services Solutions02/22/2021
BISPLISSUEDSenid PL & Heating01/29/2021
BISOTISSUEDModern Services Solutions01/31/2020
BISPLISSUEDSenid PL & Heating06/11/2019
BISPLISSUEDSenid PL & Heating06/11/2019
BISOTISSUEDModern Services Solutions06/10/2019
BISEQISSUEDV.C. Global Tech02/22/2019
BISOTISSUEDV.C. Global Tech02/22/2019
BISOTISSUEDV.C. Global Tech02/22/2019
BISEQRE-ISSUEDV.C. Global Tech02/22/2019
BISOTISSUEDV.C. Global Tech02/12/2018
BISEQISSUEDV.C. Global Tech02/12/2018
BISEQISSUEDV.C. Global Tech02/09/2018
BISOTISSUEDV.C. Global Tech02/09/2018
BISEQISSUEDBilly Enterprises09/20/2017
BISEQISSUEDRock Group NY08/03/2017
BISPLISSUEDBauer Mechancial07/27/2017
BISEQISSUEDRSG Construction01/12/2017
BISEQISSUEDRock Group NY07/21/2016
BISEQISSUEDRock Group NY07/22/2015
BISEQISSUEDHKS Construction03/02/2015
+ 21 more permits on file
1 project · most recent 08/19/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2025Permit IssuedQuest Builders GroupHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P18NMAU-E5 883 CFM · Vrf Indoor ×2
MXZ-SM36NAMHZ-U1 4 tons · Condensing Unit ×1
MXZ-SM60NAM2-U1 6 tons · Condensing Unit ×1
PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×1
PKFY-P12NLMU-ER1.TH 297 CFM · Vrf Indoor ×1
PMFY-P12NBMU-ER5 328 CFM · Vrf Indoor ×1
Ventilation
Panasonic FV-0511VKS2 100 CFM · Exhaust Fan ×2
1 project · most recent 08/19/2025
Sprinkler System
FiledStatusContractorScope
08/19/2025——Sprinkler System
2 projects · most recent 07/06/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/06/2026——Gas, Plumbing-Sprinkler
08/19/2025——Water/Sanitary
13 projects · most recent 07/17/2025
General Wiring
FiledStatusContractorScope
07/17/2025Permit IssuedCrosswire ElectricalGeneral Wiring
05/12/2025Permit IssuedA.C. Morgan ElectricGeneral Wiring
01/20/2024Permit IssuedRichard Neu—
06/01/2023CompleteRobin Electrical CoGeneral Wiring
12/13/2022Permit IssuedSega ElectricGeneral Wiring
09/10/2020Permit IssuedRichard Neu—
01/21/2020Permit IssuedIlluminous Electric—
12/30/2019CompleteTitan Electrical & Elev Contracting—
12/30/2019CompleteTitan Electrical & Elev Contracting—
11/29/2019CompleteAujla ElectricGeneral Wiring
10/23/2019CompleteAujla Electric—
09/20/2019CancelledTitan Electrical & Elev Contracting—
05/01/2019CompleteAujla ElectricGeneral Wiring
2 projects · most recent 05/14/2026
Steel Concrete
FiledStatusContractorScope
05/14/2026Permit IssuedOasis PlomoSteel
08/19/2025Permit IssuedQuest Builders GroupSteel, Concrete
4 projects · most recent 08/14/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/14/2026Permit IssuedMetro Contracting NYSidewalk Shed
08/19/2025Permit IssuedQuest Builders GroupFence
08/27/2020Permit IssuedModern Services SolutionsSidewalk Shed
11/06/2018Permit IssuedBilly EnterprisesSidewalk Shed
1 project · most recent 04/29/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/29/2026Permit IssuedMega Construction ServicesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/10/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/22/2026Fire-Resistant Penetrations and Joints—special
06/22/2026Tenant Protection Plan Compliance—special
06/22/2026Energy Code Compliance Inspections—progress
06/22/2026Fire-Resistance Rated Construction—progress
06/22/2026Lighting in dwelling units—energy_progress
06/22/2026Insulation placement and R values—energy_progress
06/03/2026Structural Steel - WeldingMOHAMMAD AHEADspecial
06/03/2026Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
06/03/2026Sprayed fire-resistant materialsARIEL GOLSHANspecial
06/03/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
06/03/2026FinalARIEL GOLSHANprogress
06/03/2026Fire-Resistance Rated ConstructionARIEL GOLSHANprogress
06/03/2026Structural Cold-Formed SteelMOHAMMAD AHEADspecial
06/03/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
06/03/2026Post-installed AnchorsMOHAMMAD AHEADspecial
06/03/2026Structural Steel - High Strength BoltingMOHAMMAD AHEADspecial
06/03/2026Structural Steel - DetailsMOHAMMAD AHEADspecial
06/03/2026Structural Stability – Alterations of existing buildingsMOHAMMAD AHEADspecial
06/03/2026FinalARIEL GOLSHANprogress
04/28/2026Post-installed anchors in masonryMichael Lombardospecial
05/01/2025Fire-Resistant Penetrations and JointsHENRY TORRESspecial
05/01/2025Fire-Resistant Penetrations and JointsHENRY TORRESspecial
04/28/2025Tenant Protection Plan ComplianceHENRY TORRESspecial
04/28/2025Interior lighting powerHENRY TORRESenergy_progress
04/28/2025Fire-Resistance Rated ConstructionHENRY TORRESprogress
Latest 25 of 41.
▾Documents — 368 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/06/2026M00093532-I1Request digital key ↗
09/02/2026M00783119-S1Request digital key ↗
09/02/2026M00783119-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026M00390224-I1Request digital key ↗
▸Applications & Permits76
▸BISPLAN / WORK APPROVAL APPLICATION36
03/09/2022123226892Open ↗
03/01/2022123226892Open ↗
02/15/2022123226892Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION35
09/14/2022123226892Open ↗
09/14/2022123226892Open ↗
09/14/2022123226008Open ↗
Showing 3 of 35 on file for this type
▸BISLL114/19 PERMIT RESTRICTION4
09/14/2022123226892Open ↗
09/14/2022123226892Open ↗
09/14/2022123226008Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/06/2020123703475Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026M01408968-I1Open ↗
▸Seals & Professional Certifications93
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00390224-I1Open ↗
08/28/2026M00988847-I1Open ↗
08/28/2026M00988847-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
01/30/2020123703475Open ↗
06/26/2019122915550Open ↗
06/10/2019123859538Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
04/30/2019123730515Open ↗
03/28/2019123859538Open ↗
02/13/2019123226892Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
04/30/2019123730515Open ↗
03/28/2019123859538Open ↗
02/13/2019123226892Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00783119-I1Open ↗
09/01/2026M00783119-I1Open ↗
09/01/2026M00783119-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M00783119-I1Open ↗
09/01/2026M01216954-S3Open ↗
08/31/2026M01216954-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/13/2017140691865Open ↗
07/18/2017140669729Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
09/13/2017140691865Open ↗
07/18/2017140669729Open ↗
Showing 2 of 5 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING6
02/15/2022123226892Open ↗
07/18/2017140669729Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
06/26/2019122915550Open ↗
04/30/2019123730515Open ↗
02/13/2019123226892Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes10
01/30/2020123703475Open ↗
07/12/2019122915550Open ↗
06/26/2019122915550Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
07/23/2019122915550Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00390224-I1Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/21/2026M01216954-S4Open ↗
08/21/2026M01216954-S3Open ↗
08/21/2026M01216954-S2Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
02/15/2022123226892Open ↗
01/31/2020123703475Open ↗
07/12/2019122915550Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/19/2019123859538Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
03/08/2022123226892Open ↗
02/07/2022123226892Open ↗
01/20/2022123226008Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/30/2020123703475Open ↗
06/26/2019122915550Open ↗
04/30/2019123730515Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/13/2017140691865Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/18/2017140669729Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/19/2021123859538Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
03/08/2022123226892Open ↗
02/07/2022123226892Open ↗
01/12/2022123226008Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISLETTERS - SUPPORTING DOCUMENTATION11
09/14/2022123226008Open ↗
09/14/2022123226008Open ↗
09/14/2022123226892Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSHED LETTER3
08/11/2017140372102Open ↗
02/10/2017140372102Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/14/2025123226892Open ↗
07/19/2021123859538Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT21
03/01/2022123226892Open ↗
02/14/2022123226892Open ↗
02/08/2022123226892Open ↗
Showing 3 of 21 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST4
09/19/2017140691865Open ↗
07/27/2017140669729Open ↗
07/27/2017140669729Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/20/2019122915550Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/19/2021123859538Open ↗
▸Filing & Intake Forms42
▸BISBOROUGH INTAKE FORM14
09/14/2022123226008Open ↗
09/14/2022123226892Open ↗
09/14/2022123226008Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
03/09/2022123226892Open ↗
01/13/2022123226008Open ↗
05/06/2021123859538Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET11
01/30/2020123703475Open ↗
06/26/2019122915550Open ↗
04/30/2019123730515Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
09/13/2017140691865Open ↗
07/18/2017140669729Open ↗
01/09/2017140592491Open ↗
Showing 3 of 6 on file for this type
▸Other Documents6
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/17/2026M01390285-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00093532-I1Open ↗
▸DOB NOWCalculations1
08/17/2026M01390285-I1Open ↗