Office with commercial, 1-6 stories
Yale Presbyterian Church
61-35 220 STREET · Name © OpenStreetMap contributors · Oakland Gardens-Hollis Hills · BIN 4162216
💬 Discuss this project
1958Year Built
2Stories
O5Building Class
R4Zoning
32,790 sfGross Floor Area
0Units
LL97 Covered4 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: ASSOCIATION FOR NEUROLOGICALLY IMPAIRED BRAIN · 18,000 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscapeGeneral
Roof12p · 4 filings · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANIBIC4007/08/2026
ASSOCIATION FOR NEUROLOGICALLY IMPAIRED BRAIN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H2M ARCHITECTS AND ENGINEERS912/02/2024
SCOTT D. LEHN, PE309/26/2024
ROBERT E. IKES, III308/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EMPIRE CITY CONSULTANTS, INC.2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRINCIPAL BUILDERS SOLUTIGeneral Contractor1607/08/2026
YOUNG CHOEElectrical103/21/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA69021012/02/2024
Building Lifecycle
All (84)Filed (15)Permit Issued (9)Signed Off (4)Violation (11)Inspection (5)Objection (10)Special Inspection (30)
06/26/2025
Violation issued (FDNY_ORDER, closed)
03/28/2025
Signed off — Alteration
Gas piping work in support of removal, and re-installation of existing and new roof top HVAC units. Also included will be plumbing for new drains and condensate lines.
Q00515886-I1
03/28/2025
Signed off — Alteration
Removal and replacement of selected HVAC equipment to achieve current Heating and Ventilation code requirements. Per plans attached.
Q00515422-I1
01/23/2025
Signed off — Alteration
Removal of existing chair lift serving cellar and first floor and proposed new concrete foundation and masonry elevator shaft from cellar level through the roof with new bulkhead. Penetration of the roof will not begin until abatement work on the roof in
Q00515954-I1
01/10/2025
Signed off — Alteration
Removal/abatement of existing hot roof and replacement with new code required insulation and TPO membrane. Per plans attached.
Q00515584-I1
12/16/2024
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — Final
IBRAHIM MOURAD
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
12/02/2024
Filed — Alteration
Removal and replacement of selected HVAC equipment to achieve current Heating and Ventilation code requirements. Per plans attached.
Q00515422-P3
11/22/2024
Special inspection requirement — Final
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — Duct leakage testing, insulation and design
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Structural Steel - High Strength Bolting
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Subgrade Inspections
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Structural Cold-Formed Steel
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Final
IBRAHIM MOURAD
10/08/2024
Special inspection requirement — Footing and Foundation
IBRAHIM MOURAD
09/26/2024
Filed — Alteration
Removal of existing chair lift serving cellar and first floor and proposed new concrete foundation and masonry elevator shaft from cellar level through the roof with new bulkhead. Penetration of the roof will not begin until abatement work on the roof in
Q00515954-P4
08/13/2024
Filed — Alteration
Removal/abatement of existing hot roof and replacement with new code required insulation and TPO membrane. Per plans attached.
Q00515584-P2
07/26/2024
Filed — Alteration
Removal and replacement of selected HVAC equipment to achieve current Heating and Ventilation code requirements. Per plans attached.
Q00515422-P2
05/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2024
Permit issued — Structural
Q00515954-I1-GC
05/13/2024
Permit issued — General Construction
Q00515584-I1-GC
05/10/2024
Filed — Alteration
Gas piping work in support of removal, and re-installation of existing and new roof top HVAC units. Also included will be plumbing for new drains and condensate lines.
Q00515886-P4
05/10/2024
Permit issued — General Construction
Q00515954-I1-ST
04/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/18/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/06/2024
Filed — Alteration
Gas piping work in support of removal, and re-installation of existing and new roof top HVAC units. Also included will be plumbing for new drains and condensate lines.
Q00515886-P3
01/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2024
Filed — Alteration
Gas piping work in support of removal, and re-installation of existing and new roof top HVAC units. Also included will be plumbing for new drains and condensate lines.
Q00515886-P2
07/15/2023
Permit issued — General Construction
Q00515584-I1-GC
07/11/2023
Permit issued — Mechanical Systems
Q00515422-I1-MS
07/11/2023
Permit issued — General Construction
Q00515954-I1-ST
07/11/2023
Permit issued — Structural
Q00515954-I1-FO
06/23/2023
Permit issued — Plumbing
Q00515886-I1-PL
02/22/2023
Permit issued — General Construction
Q00515954-I1-GC
02/09/2023
Filed — Alteration
Removal of existing chair lift serving cellar and first floor and proposed new concrete foundation and masonry elevator shaft from cellar level through the roof with new bulkhead. Penetration of the roof will not begin until abatement work on the roof in
Q00515954-P1
02/08/2023
Filed — Alteration
Removal/abatement of existing hot roof and replacement with new code required insulation and TPO membrane. Per plans attached.
Q00515584-P1
02/07/2023
Filed — Alteration
Removal and replacement of selected HVAC equipment to achieve current Heating and Ventilation code requirements. Per plans attached.
Q00515422-P1
02/07/2023
Filed — Alteration
Gas piping work in support of removal, and re-installation of existing and new roof top HVAC units. Also included will be plumbing for new drains and condensate lines.
Q00515886-P1
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPRINCIPAL BUILDERS SOLUTI05/14/2024
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI05/13/2024
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI05/10/2024
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI07/15/2023
DOB NOWMechanical SystemsSigned-offPRINCIPAL BUILDERS SOLUTI07/11/2023
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI07/11/2023
DOB NOWStructuralSigned-offPRINCIPAL BUILDERS SOLUTI07/11/2023
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP06/23/2023
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI02/22/2023
BISPLISSUEDABR PLBG&HTG CONTR INC07/17/2020
BISOTISSUEDPRECISION CONSTRUCTION OF06/08/2020
BISOTISSUEDPRECISION CONSTRUCTION OF10/10/2019
BISPLISSUEDABR PLBG&HTG CONTR INC03/27/2019
BIS—ISSUEDPRECISION CONSTRUCTION OF03/20/2019
BISPLISSUEDMYRTO PLUMBING & HVAC COR10/26/2017
BISOTISSUEDCHIOS RENOVATION INC10/11/2017
BISPLISSUEDABR PLBG&HTG CONTR INC09/25/2017
BISOTISSUEDPRECISION CONSTRUCTION OF09/25/2017
BISPLISSUEDQBK PLUMBING & HTNG INC04/09/2009
BISOTISSUEDG.C. HOME IMPROVEMENT COR03/04/2009
BISOTISSUEDG.C. HOME IMPROVEMENT COR01/23/2009
BISMHISSUEDVANDER MECHANICAL CORP.07/24/2007
BISOTISSUEDA1 EMPIRE CONSTRUCTION, INC.06/19/2007
BISMHISSUEDNATIVO LLC12/20/2006
BISPLISSUEDLAFATA CORALLO P & H INC07/07/2006
BISOTISSUEDNATIVO LLC06/28/2006
2 projects · most recent 04/25/2025
General Wiring
FiledStatusContractorScope
04/25/2025CompleteALL CITY ELECTRICAL INCGeneral Wiring
06/20/2023Permit IssuedARGON ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
12/16/2024HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
12/16/2024HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
12/16/2024Maintenance informationIBRAHIM MOURADenergy_progress
12/16/2024Mechanical SystemsIBRAHIM MOURADspecial
12/16/2024Heating SystemsIBRAHIM MOURADspecial
12/16/2024Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
12/16/2024Energy Code Compliance InspectionsIBRAHIM MOURADprogress
12/16/2024FinalIBRAHIM MOURADprogress
12/16/2024HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
12/16/2024Duct leakage testing, insulation and designIBRAHIM MOURADenergy_progress
12/16/2024Shutoff dampersIBRAHIM MOURADenergy_progress
11/22/2024Heating SystemsIBRAHIM MOURADspecial
11/22/2024Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
11/22/2024Shutoff dampersIBRAHIM MOURADenergy_progress
11/22/2024HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
11/22/2024Maintenance informationIBRAHIM MOURADenergy_progress
11/22/2024Duct leakage testing, insulation and designIBRAHIM MOURADenergy_progress
11/22/2024HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
11/22/2024HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
11/22/2024FinalIBRAHIM MOURADprogress
11/22/2024Energy Code Compliance InspectionsIBRAHIM MOURADprogress
11/22/2024Mechanical SystemsIBRAHIM MOURADspecial
10/08/2024Structural Cold-Formed SteelIBRAHIM MOURADspecial
10/08/2024Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/08/2024Subgrade InspectionsIBRAHIM MOURADspecial
Latest 25 of 82.
▾Documents — 241 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026Q00515886-P3Request digital key ↗
08/25/2026Q00515886-P2Request digital key ↗
08/25/2026Q00515886-P4Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION22
02/18/2026421528706Open ↗
05/06/2025421528706Open ↗
10/02/2024421528706Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION13
12/03/2020440436146Open ↗
06/11/2020440436146Open ↗
10/11/2019440436146Open ↗
Showing 3 of 13 on file for this type
▸BISPLACE OF ASSEMBLY1
04/21/2011420345914Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/09/2025421528706Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
08/04/2011420345914Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/18/2018420345914Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00515584-I1Open ↗
09/01/2026Q00515584-I1Open ↗
08/29/2026Q00515584-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026Q00515954-I1Open ↗
08/25/2026Q00515954-P1Open ↗
08/25/2026Q00515954-P4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00515584-I1Open ↗
08/29/2026Q00515584-P1Open ↗
08/29/2026Q00515422-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
12/05/2019440436146Open ↗
04/08/2019402656835Open ↗
03/26/2019421528706Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/24/2017440427254Open ↗
▸BISPC FULL REPORT1
02/13/2008410066208Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/24/2017440427254Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/28/2017440436146Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/24/2017440427254Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING5
03/19/2020440436146Open ↗
09/28/2017440436146Open ↗
08/24/2017440427254Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/05/2019440436146Open ↗
07/31/2017421528706Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
05/15/2009410132388Open ↗
04/22/2009410132388Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/15/2013420812669Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/25/2026Q00515954-P4Open ↗
08/25/2026Q00515954-P1Open ↗
08/21/2026Q00515584-P2Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/25/2019421528706Open ↗
09/28/2017440436146Open ↗
08/24/2017440427254Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/26/2008410132388Open ↗
02/13/2008410066208Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/24/2017440427254Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
06/23/2025421528706Open ↗
05/13/2025421528706Open ↗
10/01/2024421528706Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/05/2019440436146Open ↗
03/25/2019421528706Open ↗
07/31/2017421528706Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00515584-I1Open ↗
08/13/2026Q00515422-I1Open ↗
▸BISLIGHTING CONTROLS1
05/06/2025421528706Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/06/2025421528706Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/24/2017440427254Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/06/2025421528706Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/06/2025421528706Open ↗
▸BISINTERIOR LIGHTING POWER1
05/06/2025421528706Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/02/2021440436146Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/06/2025421528706Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/06/2025421528706Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/26/2025421528706Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY12
06/23/2025421528706Open ↗
05/06/2025421528706Open ↗
10/01/2024421528706Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE2
11/03/2022421528706Open ↗
03/26/2019421528706Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/06/2025421528706Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/06/2025421528706Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/06/2025421528706Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/13/2026Q00515584-I1Open ↗
08/13/2026Q00515954-P1Open ↗
08/13/2026Q00515584-P1Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
04/09/2024421528706Open ↗
03/25/2024421528706Open ↗
07/20/2022421528706Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/19/2024421528706Open ↗
04/19/2024421528706Open ↗
10/22/2019440436146Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
02/15/2013420812669Open ↗
04/21/2011420345914Open ↗
06/26/2008410132388Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/02/2021440436146Open ↗
04/08/2019402656835Open ↗
▸BISSUPERSEDING LETTER2
12/03/2020440436146Open ↗
10/11/2019440436146Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
11/03/2022421528706Open ↗
03/02/2021440436146Open ↗
04/08/2019402656835Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION8
04/19/2024421528706Open ↗
07/15/2022421528706Open ↗
03/24/2022421528706Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
06/11/2020440436146Open ↗
12/05/2019440436146Open ↗
12/18/2018410066208Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
07/31/2017421528706Open ↗
02/15/2013420812669Open ↗
06/26/2008410132388Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/28/2017440436146Open ↗
08/24/2017440427254Open ↗