← Back
Two family brick
61-65 70 STREET
QUEENS · BIN 4066984
💬 Discuss this project
1960Year Built
2Stories
B1Building Class
R4Zoning
3,099 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two family brick · 2,667 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Basement1p · 1 filing · 10 docs
Sub-Basement1p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/20/2025$1.3M—VINCENT AND ANGELA ALONGI TRUST → Private party$428/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADAL ENGINEERING PLLC202/12/2026
KZ ENGINEERING, P.C209/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMSTERDAM RESTORATIONGeneral Contractor208/13/2026
SUPERB PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADAL ENGINEERING PLLC4205202/12/2026
KZ ENGINEERING, P.C.4665209/05/2025
Building Lifecycle
All (29)Filed (4)Permit Issued (3)Violation (1)Inspection (7)Special Inspection (14)
08/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/12/2026
Permit issued — General Construction
Q01276983-I1-GC-CX
02/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
02/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
02/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
02/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
02/12/2026
Filed — Alteration
Modification of gas piping in the basement and installation on new boiler and HWH as per plans filed herewith. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01277480-P1
12/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
10/01/2025
Permit issued — Plumbing
Q01277480-I1-PL
10/01/2025
Violation issued (ECB, open)
Unknown
09/12/2025
Filed — Alteration
Modification of gas piping in the basement and installation on new boiler and HWH as per plans filed herewith. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01277480-I1
09/09/2025
Permit issued — General Construction
Q01276983-I1-GC-CX
09/05/2025
Filed — Alteration
STRUCTURAL DESIGN FOR PROPOSED NEW STEEL DECK FRAMING AT THE REAR YARD AREA OF THE BUILDING AND LINTEL REPLACEMENT FOR ENLARGE EXISTING MASONRY OPENING TO ACCOMMODATE NEW DOOR FOR THE NEW DECK ENTRANCE AT THE REAR YARD
Q01276983-P1
09/05/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
09/05/2025
Special inspection requirement — Masonry
Karol Zdancewicz
09/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Karol Zdancewicz
09/05/2025
Special inspection requirement — Final
Karol Zdancewicz
09/05/2025
Special inspection requirement — Structural Steel - Details
Karol Zdancewicz
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Karol Zdancewicz
08/29/2025
Filed — Alteration
STRUCTURAL DESIGN FOR PROPOSED NEW STEEL DECK FRAMING AT THE REAR YARD AREA OF THE BUILDING AND LINTEL REPLACEMENT FOR ENLARGE EXISTING MASONRY OPENING TO ACCOMMODATE NEW DOOR FOR THE NEW DECK ENTRANCE AT THE REAR YARD
Q01276983-I1
03/21/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
03/21/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM RESTORATION08/12/2026
DOB NOWPlumbingPermit IssuedSUPERB PLUMBING & HEATING10/01/2025
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM RESTORATION09/09/2025
1 project · most recent 02/12/2026
Gas
FiledStatusContractorScope
02/12/2026Permit IssuedSUPERB PLUMBING & HEATINGGas
3 projects · most recent 04/24/2026
HVAC Wiring General Wiring
FiledStatusContractorScope
04/24/2026CompleteHIGH QUALITY ELEC.OF NYCHVAC Wiring
03/03/2026Permit IssuedHIGH QUALITY ELEC.OF NYCGeneral Wiring
02/20/2026CancelledHIGH QUALITY ELEC.OF NYCHVAC Wiring
1 project · most recent 09/05/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/05/2025Permit IssuedNEW AMSTERDAM RESTORATIONSteel, Concrete, Masonry
2 projects · most recent 02/12/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/12/2026Permit IssuedSUPERB PLUMBING & HEATINGTenant Protection Plan 72 Hour
09/05/2025Permit IssuedNEW AMSTERDAM RESTORATIONTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/21/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/13/2026Fire-Resistant Penetrations and JointsDariusz Makaraspecial
02/13/2026HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
02/13/2026HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
02/13/2026HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
10/29/2025HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsDariusz Makaraspecial
10/29/2025HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
10/29/2025HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
09/05/2025Post-installed AnchorsKarol Zdancewiczspecial
09/05/2025MasonryKarol Zdancewiczspecial
09/05/2025Concrete - Cast-In-PlaceKarol Zdancewiczspecial
09/05/2025FinalKarol Zdancewiczprogress
09/05/2025Structural Steel - DetailsKarol Zdancewiczspecial
09/05/2025Structural Stability – Alterations of existing buildingsKarol Zdancewiczspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026Q01276983-P1Request digital key ↗
08/19/2026Q01276983-I1Request digital key ↗
08/17/2026Q01277480-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026Q01277480-I1Open ↗
08/28/2026Q01276983-P1Open ↗
08/28/2026Q01276983-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026Q01276983-I1Open ↗
08/17/2026Q01277480-I1Open ↗
08/13/2026Q01277480-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026Q01277480-I1Open ↗
08/28/2026Q01276983-P1Open ↗
08/26/2026Q01277480-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01277480-I1Open ↗
08/13/2026Q01277480-P1Open ↗