6 Active Violations ▸FDNY Report ↗
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCobella Realty Group15p · 3 filings · 9 docs
BulkheadCobella Realty Group2p · 2 filings · 4 docs
Floor 66p · 1 filing · 2 docs
Floor 56p · 1 filing · 2 docs
Floor 4Cobella Realty Group14p · 2 filings · 4 docs
Floor 3Cobella Realty Group14p · 2 filings · 4 docs
Floor 2Unit 2A, Unit 2B14p · 2 filings · 4 docs
Floor 1Cobella Realty Group14p · 2 filings · 4 docs
CellarCobella Realty Group16p · 2 filings · 4 docs
Site & exteriorCobella Realty Group28p · 6 filings · 17 docs
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519209/15/2020
Building Lifecycle
All (42)Filed (11)Signed Off (7)Violation (15)Objection (6)Special Inspection (3)
10/14/2026
Violation issued (ECB, open)
Construction
10/14/2026
Violation issued (ECB, open)
Construction
10/07/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01468607-I1
09/28/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/30/2023
Signed off — Alteration
B00398289-I1
10/12/2023
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00453706-I1
08/02/2023
Signed off — Alteration
B00398360-I1
08/01/2023
Signed off — Alteration
INSTALLATION OF NEEDLE BEAM AS PER PLANS. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00498644-I1
07/19/2023
Signed off — Alteration
B00156250-I1
07/19/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00757779-I1
04/27/2023
Objection raised — Scope
04/27/2023
Objection resolved — Addressed
04/26/2023
Objection raised — Other
04/26/2023
Objection resolved — Addressed
04/26/2023
Objection raised — Scope
04/26/2023
Objection resolved — Addressed
04/24/2023
Filed — Alteration
Extend chimney of adjoining two story building at 63 Clarkson alongside wall of 61 Clarkson all the way to roof .
B00862753-I1
04/20/2023
Special inspection requirement — Mechanical Systems
04/20/2023
Special inspection requirement — Final
02/09/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
B00366807-I1
01/10/2023
Violation issued (ECB, closed)
Construction
10/17/2022
Violation issued (ECB, closed)
Construction
08/31/2022
Violation issued (ECB, closed)
Construction
08/31/2022
Violation issued (ECB, closed)
Construction
08/31/2022
Violation issued (ECB, closed)
Unknown
08/31/2022
Violation issued (ECB, closed)
Construction
08/31/2022
Violation issued (ECB, closed)
Construction
08/31/2022
Violation issued (ECB, closed)
Construction
08/31/2022
Violation issued (ECB, closed)
Construction
06/21/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00757779-I1
03/22/2022
Special inspection requirement — Final
NAVEEN KUMAR
03/17/2022
Filed — Alteration
INSTALLATION OF NEEDLE BEAM AS PER PLANS. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00498644-P1
04/09/2021
Filed — Alteration
INSTALLATION OF NEEDLE BEAM AS PER PLANS. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00498644-I1
03/10/2021
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00453706-I1
10/23/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
B00366807-P1
09/15/2020
Filed — Alteration
B00398289-I1
09/15/2020
Filed — Alteration
B00398360-I1
07/06/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
B00366807-I1
04/18/2019
Filed — Alteration
B00156250-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDRite Way Construction06/14/2023
BIS—ISSUEDRite Way Construction05/24/2022
BIS—ISSUEDRite Way Construction10/21/2021
BIS—ISSUEDRite Way Construction06/29/2021
BIS—ISSUEDRite Way Construction11/13/2020
BIS—ISSUEDRite Way Construction07/14/2020
BIS—ISSUEDRite Way Construction07/14/2020
BISEQISSUEDRite Way Construction07/14/2020
1 project · most recent 04/24/2023
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
04/24/2023——Associated Ducts and Piping
Ducts & Piping
4 projects · most recent 10/01/2026
General Wiring
FiledStatusContractorScope
10/01/2026Permit IssuedHigh Quality Electric of NYC—
09/08/2023CompleteStar Electrical Contractors—
04/04/2023CompleteLens ElectricGeneral Wiring
07/06/2020CompleteRichard Neu—
1 project · most recent 10/06/2026
Sidewalk Shed
FiledStatusContractorScope
10/06/2026——Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/20/2023Mechanical Systems—special
04/20/2023Final—progress
03/22/2022FinalNAVEEN KUMARprogress
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch6
10/07/2026B01468607-I1Request digital key ↗
09/03/2026B00491017-I1Request digital key ↗
09/01/2026B00498644-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00366807-I1Request digital key ↗
08/15/2026B00366807-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00398360-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00156250-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/01/2026B00453706-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00398289-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION21
10/26/2023321539572Open ↗
08/22/2023321539572Open ↗
08/03/2023321539572Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION4
06/30/2021321539572Open ↗
06/23/2021321539572Open ↗
02/16/2021321539572Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/09/2019321539572Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/11/2023321539572Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM4
02/05/2021321539572Open ↗
02/03/2021321539572Open ↗
11/09/2020321539572Open ↗
Showing 3 of 4 on file for this type
▸BISVERIFY TAX LOT1
03/20/2025321539572Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/14/2018321539572Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/30/2023321539572Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/07/2026B01468607-I1Open ↗
09/03/2026B00491017-I1Open ↗
09/02/2026B00156250-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/22/2020321539572Open ↗
12/14/2018321539572Open ↗
12/14/2018321539572Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00498644-I1Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING6
07/06/2023321539572Open ↗
06/30/2023321539572Open ↗
05/01/2023321539572Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
11/27/2023321539572Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/17/2017321539572Open ↗
▸BISFIRE ALARM TEST1
11/13/2023321539572Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/13/2023321539572Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/13/2023321539572Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/13/2023321539572Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
08/30/2023321539572Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
12/14/2018321539572Open ↗
12/14/2018321539572Open ↗
07/17/2017321539572Open ↗
▸BISSTREET TREE SIGNOFF1
09/13/2023321539572Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/19/2020321539572Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/18/2023321539572Open ↗
08/18/2023321539572Open ↗
07/21/2023321539572Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/22/2020321539572Open ↗
12/14/2018321539572Open ↗
07/17/2017321539572Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/18/2023321539572Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/18/2023321539572Open ↗
08/18/2023321539572Open ↗
07/24/2023321539572Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
02/05/2024321539572Open ↗
07/22/2020321539572Open ↗
07/19/2020321539572Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/22/2020321539572Open ↗
07/19/2020321539572Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
09/13/2023321539572Open ↗
▸BISSOIL REPORT1
12/14/2018321539572Open ↗
▸Approvals, Objections & Sign-offs14
▸BISSCHEDULE A - OCCUPANCY / USE8
07/21/2023321539572Open ↗
07/20/2023321539572Open ↗
07/14/2023321539572Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/05/2020321539572Open ↗
12/14/2018321539572Open ↗
12/14/2018321539572Open ↗
Showing 3 of 4 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
12/13/2023321539572Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
12/06/2023321539572Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/30/2021321539572Open ↗
07/22/2020321539572Open ↗
07/19/2020321539572Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION11
12/19/2023321539572Open ↗
12/19/2023321539572Open ↗
07/10/2023321539572Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET3
10/18/2018321539572Open ↗
10/18/2018321539572Open ↗
07/17/2017321539572Open ↗