Shopping center, with or without parking
Universal Hip Hop Museum
610 EXTERIOR STREET · Concourse-Concourse Village · BIN 2119100
💬 Discuss this project
2007Year Built
4Stories
K6Building Class
C4-4Zoning
526,259 sfGross Floor Area
12Units
LL97 Covered0 Open Violations
Shopping center, with or without parking · Owner of record: BTM DEVELOPMENT PARTNERS LLC · 208,700 sf lot · 2.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof75p · 6 filings · 20 docs
Floor 61p · 1 filing · 3 docs
Floor 51p · 1 filing · 3 docs
Floor 46p · 2 filings · 6 docs
Floor 313p · 4 filings · 20 docs
Floor 251p · 5 filings · 20 docs
Floor 198p · 9 filings · 20 docs
Site & exterior14p · 5 filings · 20 docs
Filed — no permit issued8p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELATED MANAGEMENT COMPANY3409/12/2026
BTM DEVELOPMENT PARTNERS, LLC14407/08/2026
J S K CONSTRUCTION1003/22/2026
UNITED KING CONSTRUCTION303/22/2026
RELATED503/22/2026
PLAZA CONSTRUCTION903/22/2026
RADIAL POWER DEVELOPMENT, LLC503/21/2026
APPLEBEE'S103/21/2026
APPLEBEES203/21/2026
BTM DEVELOPMENT PARTNERSHIP603/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.S.K. CONSTRUCTION CORPGeneral Contractor603/21/2026
B & B 21 MANAGEMENT INCGeneral Contractor607/08/2026
AVON PLBG & HTG INCFire Protection507/08/2026
CITY CODE CONSTRUCTION LLGeneral Contractor507/08/2026
AVON PLBG & HTG INCPlumbing507/08/2026
PNV INDUSTRIES LLCGeneral Contractor407/08/2026
SALON VTLN INSTALLER & DEGeneral Contractor407/08/2026
UNITED KING CONSTRUCTIONGeneral Contractor303/21/2026
PROMETHEAN BUILDERS LLCGeneral Contractor307/08/2026
LINE VENTURE GROUP LLCGeneral Contractor303/21/2026
HENICK-LANE SERVICE CORPGeneral Contractor303/21/2026
UNIVERSAL SIGNS & SERVICEGeneral Contractor303/21/2026
VALLESIGNS AWNINGSScaffold207/08/2026
KG SPRINKLER CORPFire Protection207/08/2026
ALL JERSEY MECHANICAL & CGeneral Contractor203/21/2026
DEMARTINO CONSTR. CO. INCGeneral Contractor203/21/2026
POWER SURGE ELECTRIC INC 004009General Contractor203/22/2026
DONATO PLUMBING, INCPlumbing207/08/2026
UNIVERSAL SIGNS SVCScaffold107/08/2026
W & M ELECTRIC CORPElectrical103/22/2026
RICHARD NEUElectrical103/22/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor104/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
NEWGRANGE ELECTRIC, INCElectrical103/22/2026
JAVELIN ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASIF JAMIL R.A.7506605/29/2026
SOCOTEC ENGINEERING4983508/01/2025
MJ ENGINEERING & DESIGN55461204/28/2025
AVCON ENGINEERING PC548202/20/2024
AM ENGINEERING SERVICES P7975410/18/2023
ACE INSPECTION AND TESTIN1023208/26/2020
ACTIVE DESIGN GROUP ENGIN6666107/18/2019
Building Lifecycle
All (257)Filed (47)Permit Issued (42)Signed Off (26)Violation (60)Inspection (20)Objection (32)Special Inspection (30)
07/27/2026
Special inspection requirement — Sprinkler Systems
Alexandra Herrera
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
07/07/2026
Objection resolved — Resolved
06/18/2026
Objection raised — Other
05/29/2026
Filed — Alteration
It is proposed to install plumbing and cooking equipment, and modify existing sprinkler system as shown on plans. no change to use, egress or occupancy.
X00191145-P5
04/13/2026
Signed off — Alteration
CONSTRUCT LOCK UP AREA (ROOM 102) PER PLANS.
X01334025-I1
03/06/2026
Special inspection requirement — Sprinkler Systems
Alexandra Herrera
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
03/05/2026
Permit issued — Sprinklers
X00191145-I1-EW-SP
01/06/2026
Permit issued — General Construction
X01334025-I1-GC
12/31/2025
Filed — Alteration
CONSTRUCT LOCK UP AREA (ROOM 102) PER PLANS.
X01334025-I1
12/15/2025
Special inspection requirement — Final
LOUIS ARENA
12/05/2025
Signed off — Alteration
IT IS PROPOSED SPRINKLER WORK FOR FITOUT OF NAIL SALON FOR NEW SPACE#B1.2 TENANT MODERN NAILS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
X00921308-S3
12/05/2025
Signed off — Alteration
IT IS PROPOSED SPRINKLER WORK FOR FITOUT OF NAIL SALON FOR NEW SPACE#B1.2 TENANT MODERN NAILS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
X00921308-S2
12/05/2025
Signed off — Alteration
Renovation of sprinkler and standpipe system to existing tenant space for new DMV office. Change of use to tenant space B 3.2 from retail to office filed under NB#201072891 MS, GC, and PL filed separately.
X01164809-S3
11/12/2025
Signed off — Alteration
Renovation of sprinkler and standpipe system to existing tenant space for new DMV office. Change of use to tenant space B 3.2 from retail to office filed under NB#201072891 MS, GC, and PL filed separately.
X01164809-S2
10/24/2025
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR APPLEBEE'S. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01253320-I1
10/24/2025
Signed off — Alteration
INSTALL THREE NON-ILLUMINATED AWNINGS FOR APPLEBEE'S. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01253863-I1
10/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/08/2025
Signed off — Alteration
CONSTRUCTION FENCE ENCLOSURE AS PER DRAWINGS. FENCE ENCLOSURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01162341-I1
10/07/2025
Signed off — Alteration
IT IS PROPOSED SPRINKLER WORK FOR FITOUT OF NAIL SALON FOR NEW SPACE#B1.2 TENANT MODERN NAILS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
X00921308-S1
10/06/2025
Signed off — Alteration
IT IS PROPOSED SPRINKLER WORK FOR FITOUT OF NAIL SALON FOR NEW SPACE#B1.2 TENANT MODERN NAILS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
X00921308-I1
09/04/2025
Permit issued — Sign
X01253320-I1-SG
09/04/2025
Permit issued — General Construction
X01253863-I1-GC
09/02/2025
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR APPLEBEE'S. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01253320-I1
08/29/2025
Filed — Alteration
INSTALL THREE NON-ILLUMINATED AWNINGS FOR APPLEBEE'S. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01253863-I1
08/28/2025
Filed — Alteration
It is proposed to install plumbing and cooking equipment, and modify existing sprinkler system as shown on plans. no change to use, egress or occupancy.
X00191145-P4
08/28/2025
Special inspection requirement — Final
JERE MURDOCH
08/19/2025
Signed off — Alteration
Renovation of sprinkler and standpipe system to existing tenant space for new DMV office. Change of use to tenant space B 3.2 from retail to office filed under NB#201072891 MS, GC, and PL filed separately.
X01164809-S1
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Shutoff dampers
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Metering
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Electrical motors and elevators
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
08/01/2025
Filed — Alteration
Renovation of sprinkler and standpipe system to existing tenant space for new DMV office. Change of use to tenant space B 3.2 from retail to office filed under NB#201072891 MS, GC, and PL filed separately.
X01164809-P1
07/31/2025
Special inspection requirement — Electrical motors and elevators
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — Metering
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — Shutoff dampers
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
07/24/2025
Signed off — Alteration
Renovation of sprinkler and standpipe system to existing tenant space for new DMV office. Change of use to tenant space B 3.2 from retail to office filed under NB#201072891 MS, GC, and PL filed separately.
X01164809-I1
07/22/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/18/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/16/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/11/2025
Signed off — Alteration
X01157662-I1
07/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 257 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC03/05/2026
DOB NOWGeneral ConstructionSigned-offALL JERSEY MECHANICAL C01/06/2026
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC09/04/2025
DOB NOWGeneral ConstructionSigned-offUNIVERSAL SIGNS & SERVICE09/04/2025
DOB NOWMechanical SystemsSigned-offHENICK-LANE SERVICE CORP04/22/2025
DOB NOWStandpipeSigned-offH M SPRINKLER INC04/16/2025
DOB NOWSprinklersSigned-offH M SPRINKLER INC04/16/2025
DOB NOWGeneral ConstructionSigned-offPROMETHEAN BUILDERS LLC03/06/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offPROMETHEAN BUILDERS LLC01/29/2025
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC01/06/2025
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC08/02/2024
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC08/02/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/25/2024
DOB NOWMechanical SystemsSigned-offCITY CODE CONSTRUCTION LL07/22/2024
DOB NOWStructuralSigned-offCITY CODE CONSTRUCTION LL07/22/2024
DOB NOWGeneral ConstructionSigned-offCITY CODE CONSTRUCTION LL07/18/2024
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC01/19/2024
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC11/22/2023
DOB NOWSignSigned-offUNITECH DESIGN INC10/26/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC10/26/2023
DOB NOWMechanical SystemsSigned-offSALON VTLN INSTALLER & DE10/11/2023
DOB NOWGeneral ConstructionSigned-offSALON VTLN INSTALLER & DE09/28/2023
DOB NOWPlumbingSigned-offMETRO KORT P & H LLC09/27/2023
DOB NOWMechanical SystemsSigned-offPNV INDUSTRIES LLC04/07/2023
DOB NOWGeneral ConstructionSigned-offDEMARTINO CONSTR. CO. INC01/05/2023
DOB NOWMechanical SystemsPermit IssuedLINE VENTURE GROUP LLC12/30/2022
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC10/11/2022
DOB NOWGeneral ConstructionSigned-offPNV INDUSTRIES LLC02/08/2022
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC10/28/2020
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC10/28/2020
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION08/07/2020
DOB NOWMechanical SystemsPermit IssuedB & B 21 MANAGEMENT INC07/16/2020
DOB NOWStructuralPermit IssuedB & B 21 MANAGEMENT INC07/16/2020
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC01/21/2020
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC01/21/2020
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC11/22/2019
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC11/21/2019
DOB NOWMechanical SystemsPermit IssuedB & B 21 MANAGEMENT INC11/06/2019
DOB NOWStructuralPermit IssuedB & B 21 MANAGEMENT INC09/12/2019
+ 52 more permits on file
1 project · most recent 08/26/2020
Associated Ducts and Piping Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2020Permit IssuedLINE VENTURE GROUP LLCAssociated Ducts and Piping, Others, Ventilation Systems
Ventilation
Airius Air Pear A-25-SP 547 CFM ×8
1 project · most recent 05/29/2026
FiledStatusContractorScope
05/29/2026Permit IssuedAVON PLBG & HTG INC2,413 heads
1 project · most recent 05/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/29/2026Permit IssuedAVON PLBG & HTG INCGas, Water/Sanitary
23 projects · most recent 08/20/2025
General Wiring Lighting
FiledStatusContractorScope
08/20/2025CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
06/23/2025CompletePOWER SURGE ELECTRIC, INC13 meters, 1 new_meters
05/27/2025Permit IssuedNOVA ELECTRIC LLCGeneral Wiring
12/20/2024CompleteMASSARO ELECTRIC CORP.General Wiring
10/24/2024Permit IssuedJAM ELECTRICAL CORP—
09/17/2024CompleteSPECTRUM ON BROADWAY-ELEC—
07/24/2024Permit IssuedERIC & NG ELEC'L, INC.General Wiring
03/05/2024CompleteW & M ELECTRIC CORPGeneral Wiring
11/02/2023CompleteATMOS ELECTRIC SVCE CORP—
01/23/2023CompleteNEWGRANGE ELECTRIC, INCGeneral Wiring
05/25/2021CompletePSB ELECTRICAL CORP—
09/26/2020CompleteRM ELECTRIC CO., INC.General Wiring
02/16/2020CancelledRM ELECTRIC CO., INC.General Wiring
02/13/2020CompleteRM ELECTRIC CO., INC.General Wiring
01/28/2020CompleteRM ELECTRIC CO., INC.General Wiring
2 projects · most recent 06/16/2025
Steel
FiledStatusContractorScope
06/16/2025——3 scope_items
07/18/2019Permit IssuedB & B 21 MANAGEMENT INCSteel
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
10/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/18/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/16/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/01/2023Pass-Final Sign Permit InspectionPassView ↗
10/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 145
DateRequirementInspectorRole
07/27/2026Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
07/27/2026Sprinkler SystemsAlexandra Herreraspecial
03/06/2026Sprinkler SystemsAlexandra Herreraspecial
03/06/2026Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
12/15/2025FinalLOUIS ARENAprogress
08/28/2025FinalJERE MURDOCHprogress
08/04/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/04/2025MeteringALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Shutoff dampersALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Electrical motors and elevatorsALEXIS SCHLESSINGERMANenergy_progress
08/04/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
08/04/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Mechanical SystemsALEXIS SCHLESSINGERMANspecial
08/04/2025FinalALEXIS SCHLESSINGERMANprogress
08/04/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
08/04/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
07/31/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/31/2025Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
07/31/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
07/31/2025Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
07/31/2025MeteringALEXIS SCHLESSINGERMANenergy_progress
07/31/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 145.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Applebee'sRestaurant / Food ServiceFloor 1
Project X01253320 Alteration · LOC Issued · 09/02/2025
Project X01253863 Alteration · LOC Issued · 08/29/2025
Project X00818998 Alteration · LOC Issued · 02/17/2023
BJ'sRetail—
Project X01189743 Alteration · Incomplete · 03/17/2025
WingstopRestaurant / Food ServiceGround
Project X01065747 Alteration · LOC Issued · 06/14/2024
Modern NailsOtherFloor 1
Project X00921308 Alteration · LOC Issued · 09/19/2023
Food BazaarRestaurant / Food ServiceFloor 2
Project X00191145 Alteration · Permit Entire · 08/29/2019
Bogopa Service Corp. Food BazaarRetailFloor 2
Project X00193426 Alteration · Permit Entire · 07/18/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,804 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch36
08/25/2026X00642524-I1Request digital key ↗
08/23/2026X00801414-I1Request digital key ↗
08/23/2026X00818998-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/16/2026X00191145-P3Request digital key ↗
08/16/2026X00191145-I1Request digital key ↗
08/16/2026X00191145-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/16/2026X00191145-I1Request digital key ↗
08/16/2026X00191145-P4Request digital key ↗
08/16/2026X00191145-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00197966-I1Request digital key ↗
08/26/2026X00381962-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026X00191041-I1Request digital key ↗
08/15/2026X00191041-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00197972-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026X00193426-I1Request digital key ↗
▸Applications & Permits306
▸BISPLAN / WORK APPROVAL APPLICATION176
02/06/2026201072891Open ↗
10/24/2025220340566Open ↗
02/18/2025201072891Open ↗
Showing 3 of 176 on file for this type
▸BISWORK PERMIT APPLICATION120
08/02/2023240349084Open ↗
01/04/2021210053350Open ↗
08/13/2019220707607Open ↗
Showing 3 of 120 on file for this type
▸DOB NOWState DEC Permit6
08/13/2026X00191145-I1Open ↗
08/13/2026X00191145-P5Open ↗
08/13/2026X00191145-P4Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING LOT CERTIFICATION EXHIBIT I & III1
01/09/2025201072891Open ↗
▸Seals & Professional Certifications477
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION251
04/09/2020220684258Open ↗
08/30/2019220684258Open ↗
08/23/2019220684258Open ↗
Showing 3 of 251 on file for this type
▸DOB NOWProgress Inspector Seal & Signature50
09/02/2026X01334025-I1Open ↗
09/01/2026X00818998-P1Open ↗
09/01/2026X00818998-P1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
08/26/2026X00193426-I1Open ↗
08/26/2026X00191041-P1Open ↗
08/26/2026X00191041-I1Open ↗
Showing 3 of 48 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/27/2026X00191145-P3Open ↗
09/27/2026X00191145-P3Open ↗
09/01/2026X00818998-P1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
08/06/2019240259670Open ↗
Showing 1 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/31/2023240349084Open ↗
08/06/2019240259670Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/31/2023240349084Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment164
▸BISSELF-CERT PLUMBING NOTICE47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISSCHEDULE B - PLUMBING39
11/02/2020210053350Open ↗
Showing 1 of 39 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA14
05/31/2022220162179Open ↗
12/22/2021220400297Open ↗
01/27/2020201072891Open ↗
Showing 3 of 14 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSIGN HANGER CERTIFICATE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/08/2020220681625Open ↗
12/30/2019220681625Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
08/15/2019220707607Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026X00197966-I1Open ↗
08/13/2026X00197972-I1Open ↗
▸Environmental & Asbestos66
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER59
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 59 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/06/2019240259670Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
04/09/2020220684258Open ↗
08/15/2019220707607Open ↗
08/13/2019220707607Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
01/13/2026240349084Open ↗
02/09/2021220681625Open ↗
11/12/2020240259670Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
01/13/2026240349084Open ↗
07/31/2023240349084Open ↗
11/12/2020240259670Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/31/2023240349084Open ↗
08/06/2019240259670Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/31/2023240349084Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
01/15/2026240349084Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY13
01/13/2026240349084Open ↗
07/31/2023240349084Open ↗
02/09/2021220681625Open ↗
Showing 3 of 13 on file for this type
▸BISHYDRO FLOW TEST LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
03/25/2021220681625Open ↗
06/10/2019220681625Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/10/2019220681625Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs309
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST129
01/15/2026240349084Open ↗
06/29/2022220162179Open ↗
01/24/2022220400297Open ↗
Showing 3 of 129 on file for this type
▸BISADMINISTRATIVE OBJECTIONS71
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 71 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION70
01/15/2026240349084Open ↗
12/03/2020201072891Open ↗
11/02/2020210053350Open ↗
Showing 3 of 70 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
02/06/2026201072891Open ↗
01/23/2025201072891Open ↗
01/15/2025201072891Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/13/2026X00191145-P3Open ↗
08/13/2026X01253320-I1Open ↗
08/13/2026X00191041-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026X00197972-I1Open ↗
08/13/2026X00197966-I1Open ↗
08/13/2026X00818998-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
01/04/2021210053350Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00381962-I1Open ↗
08/13/2026X01162341-I1Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/12/2020240259670Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
08/06/2019240259670Open ↗
▸DOB NOWOTCR Letter of Conditional Acceptance1
08/13/2026X01189743-S1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01189743-S1Open ↗
▸DOB NOWOTCR Final Approval1
08/13/2026X01189743-S1Open ↗
▸Cost, Insurance & Ownership166
▸BISCOST AFFIDAVIT152
01/13/2026240349084Open ↗
07/31/2023240349084Open ↗
11/12/2020240259670Open ↗
Showing 3 of 152 on file for this type
▸BISLL58-88 CIVIL PENALTY AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/16/2021220400297Open ↗
02/09/2021220681625Open ↗
11/12/2020210053350Open ↗
▸BISEMERGENCY RESPONSE AGENCIES C/O NOTIFICATION AFFIDAVIT1
06/18/2020220690278Open ↗
▸Filing & Intake Forms150
▸BISEFILING COVER SHEET91
04/15/2020201072891Open ↗
07/15/2019220707607Open ↗
Showing 2 of 91 on file for this type
▸BISBOROUGH INTAKE FORM29
01/21/2021220684258Open ↗
01/21/2021220684258Open ↗
04/09/2020220689486Open ↗
Showing 3 of 29 on file for this type
▸BISADDITIONAL INFORMATION28
02/26/2025201072891Open ↗
01/23/2025201072891Open ↗
07/31/2023240349084Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/31/2023240349084Open ↗
08/06/2019240259670Open ↗
▸Other Documents5
▸BIS(42ND) TCO RENEWAL - $100.00 TCO FEE DUE FOR THIS TCO RENEWAL1
09/10/2020201072891Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/24/2022201072891Open ↗
▸BIS(43RD) TCO RENEWAL - $100.00 TCO FEE1
12/04/2020201072891Open ↗
▸BISDRY PIPE VALVE TEST : FP-101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
07/31/2023240349084Open ↗