← Back
Amusement place, bath house, boat house
6119 STRICKLAND AVENUE
BROOKLYN · BIN 3346315
💬 Discuss this project
1950Year Built
1Stories
P6Building Class
R3-1Zoning
51,820 sfGross Floor Area
0Units
LL97 Covered12 Open Violations ▸FDNY Report ↗
Amusement place, bath house, boat house · Owner of record: 101 GILA REALTY INC. · 96,360 sf lot · 0.54 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YAM REALTY409/08/2026
101 GILA REALTY703/22/2026
FUNFEST LLC103/22/2026
GILA REALTY1803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN42 ARCHITECTURE, LLC207/15/2026
ARCHITECTURE DESIGN, PLLC109/30/2025
FOCAL POINT ARCHITECTS & ASS.105/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FOCAL POINT DESIGN & CONST. INC.203/21/2026
SPEEDY EXPEDITING203/21/2026
DKG DESIGN SPACE PLANNING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORSEPOWER ELECTRIC.&Electrical203/22/2026
BBM CONSTRUCTION CORPGeneral Contractor107/08/2026
CRITICAL TEMP, INCGeneral Contractor104/09/2026
ZHONG WANG CONSTRUCTION SGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519109/30/2025
Building Lifecycle
All (40)Filed (4)Permit Issued (3)Signed Off (2)Violation (14)Objection (4)Special Inspection (13)
07/24/2026
Special inspection requirement — Final
Paul Raymond
07/24/2026
Special inspection requirement — Interior lighting power
Paul Raymond
07/24/2026
Special inspection requirement — Lighting controls
Paul Raymond
07/15/2026
Filed — Alteration
INTERIOR WORK TO NON-BEARING PARTITIONS ON FIRST FLOOR - NO CHANGE IN BULK, OCC OR EGRESS UNDER THIS APPLICATION
B01341418-P1
07/09/2026
Special inspection requirement — Lighting controls
Paul Raymond
07/09/2026
Special inspection requirement — Final
Paul Raymond
07/09/2026
Special inspection requirement — Interior lighting power
Paul Raymond
03/18/2026
Permit issued — General Construction
B01341418-I1-GC
01/28/2026
Filed — Alteration
INTERIOR WORK TO NON-BEARING PARTITIONS ON FIRST FLOOR - NO CHANGE IN BULK, OCC OR EGRESS UNDER THIS APPLICATION
B01341418-I1
12/08/2025
Signed off — Alteration
Propose direct replacement of a 15 ton package roof top unit on curb with new. No increase in size as per plans filed herewith.
B01292849-I1
11/17/2025
Permit issued — Mechanical Systems
B01292849-I1-MS
10/31/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Cost
09/30/2025
Filed — Alteration
Propose direct replacement of a 15 ton package roof top unit on curb with new. No increase in size as per plans filed herewith.
B01292849-I1
09/30/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/30/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
09/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/24/2025
Special inspection requirement — Final
NAVEEN KUMAR
09/24/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/17/2025
Violation issued (FDNY_ORDER, closed)
10/20/2022
Signed off — Alteration
Job filed here for minor sheetrock wall removal and painting of existing space. No change in use, occupancy class.
B00737627-I1
07/14/2022
Permit issued — General Construction
B00737627-I1-GC
05/31/2022
Objection resolved — Addressed
05/20/2022
Objection raised — Admin
05/16/2022
Filed — Alteration
Job filed here for minor sheetrock wall removal and painting of existing space. No change in use, occupancy class.
B00737627-I1
02/16/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/03/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2001
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBBM CONSTRUCTION CORP03/18/2026
DOB NOWMechanical SystemsSigned-offCRITICAL TEMP, INC11/17/2025
DOB NOWGeneral ConstructionSigned-offZHONG WANG CONSTRUCTION S07/14/2022
BISOTISSUEDJOE GINA CONTRACTING INC05/06/2015
BIS—ISSUEDPAUL SIGNS, INC05/04/2011
BISPLISSUEDSTELLMAR PLBG & MECH.CORP08/03/2009
BISOTISSUEDPEROTTO CONSULTING&MGT IN05/07/2009
BISSPISSUEDVIP FIRE SPRINKLER INC01/31/2007
BISPLISSUEDDEVICTORIA PLBG & HTG CORP01/30/2007
BISOTISSUEDCAT CONST CORP12/13/2006
BISOTISSUEDCAT CONST CORP11/28/2006
BISSPISSUEDVIP FIRE SPRINKLER INC12/03/2004
BIS—ISSUEDJMB ARCHITECH LLC11/17/2004
BISPLISSUEDDEVICTORIA PLBG & HTG CORP10/31/2003
BISMHISSUEDDOLINITY DEVELOPMENT CORP.10/30/2003
BISOTISSUEDDOLINITY DEVELOPMENT CORP.10/30/2003
BISOTISSUED1570 BOWLING CORP07/15/1994
BIS—ISSUEDARTHUR BLUM SIGN CO.11/06/1991
5 projects · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
03/31/2026CompleteS&R ELECTRICAL & MECHANIC—
01/12/2020CompleteHORSEPOWER ELECTRIC.&General Wiring
10/15/2019CompleteHORSEPOWER ELECTRIC.&—
07/24/2019CompleteHORSEPOWER ELECTRIC.&General Wiring
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/24/2026FinalPaul Raymondprogress
07/24/2026Interior lighting powerPaul Raymondenergy_progress
07/24/2026Lighting controlsPaul Raymondenergy_progress
07/09/2026Lighting controlsPaul Raymondenergy_progress
07/09/2026FinalPaul Raymondprogress
07/09/2026Interior lighting powerPaul Raymondenergy_progress
09/30/2025Permanent certificateYounes Abouyaalaenergy_progress
09/30/2025Maintenance informationYounes Abouyaalaenergy_progress
09/30/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/30/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/30/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/24/2025FinalNAVEEN KUMARprogress
09/24/2025Mechanical SystemsYounes Abouyaalaspecial
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01292849-I1Request digital key ↗
08/18/2026B01341418-P1Request digital key ↗
08/18/2026B01341418-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits20
▸BISPLACE OF ASSEMBLY8
05/01/2018321750217Open ↗
06/27/2014321007771Open ↗
07/16/2013310214728Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
05/02/2018321750226Open ↗
01/20/2015321015361Open ↗
10/19/2012310214728Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
07/18/2019321750226Open ↗
03/29/2019321750217Open ↗
05/08/2015321015361Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/02/2018321750226Open ↗
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/24/2020321750217Open ↗
07/18/2019321750226Open ↗
07/19/2018321750226Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B01292849-I1Open ↗
09/23/2026B01292849-I1Open ↗
09/23/2026B01292849-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01292849-I1Open ↗
08/18/2026B01341418-P1Open ↗
08/18/2026B01341418-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/27/2014321007771Open ↗
04/06/2011320291439Open ↗
08/04/2009320056693Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/06/2011320291439Open ↗
08/04/2009320056693Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B01292849-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
12/09/2009320056693Open ↗
10/30/2009320056693Open ↗
08/04/2009320056693Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
04/30/2010320056693Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
05/02/2018321750226Open ↗
08/04/2009320056693Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026B01341418-P1Open ↗
08/18/2026B01341418-I1Open ↗
08/13/2026B00737627-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
08/04/2009320056693Open ↗
10/20/2008310214728Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/02/2018321750226Open ↗
05/02/2018321750226Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/06/2011320291439Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
06/27/2014321007771Open ↗
▸Energy Compliance6
▸BISEN2 - As Built Energy Analysis3
01/20/2015321015361Open ↗
01/20/2015321015361Open ↗
11/23/2019321750226Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/18/2019321750226Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/20/2015321015361Open ↗
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)1
09/30/2015321007771Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
11/23/2019321750226Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/23/2019321750226Open ↗
02/17/2016321007771Open ↗
09/11/2015321015361Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/01/2018321750217Open ↗
01/20/2015321015361Open ↗
04/06/2011320291439Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/19/2012310214728Open ↗
10/19/2012320313246Open ↗
10/19/2012320313246Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/23/2019321750226Open ↗
05/02/2018321750226Open ↗
09/11/2015321015361Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET4
05/02/2018321750226Open ↗
01/20/2015321015361Open ↗
04/06/2011320291439Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
10/31/2012320313246Open ↗
10/19/2012310214728Open ↗
10/29/2009310214728Open ↗
▸BISBOROUGH INTAKE FORM2
03/24/2020321750217Open ↗
11/23/2019321750226Open ↗