BROOKLYN · 6
5 buildings
10
Total Filings
6
Projects on File
5
Buildings Worked
0
Projects w/ Open Permits
General Contractor
Primary Trade
Activity
Projects by first filing month6 projects all-time
0112Jun '21 · 1Feb '22 · 1Nov '22 · 1Jun '23 · 1Sep '24 · 1Sep '25 · 12022202320242025
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off6100%
By project type
Alteration6
Most active buildings
All buildings →
7118 3 AVENUEBROOKLYN · latest 10/23/2024
2 projects
397 PRESIDENT STREETBROOKLYN · latest 03/17/2022
1 projects
8701 4 AVENUEBROOKLYN · latest 06/30/2023
1 projects
943 KINGS HIGHWAYBROOKLYN · latest 03/11/2022
1 projects
6119 STRICKLAND AVENUEBROOKLYN · latest 11/17/2025
1 projects
Key relationships
Everyone →
Filing representatives
2 projects
Owners
2 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01292849 ↗6119 STRICKLAND AVENUE
BROOKLYN
AlterationSigned-off09/30/202511/17/2025
Filer DKG
Propose direct replacement of a 15 ton package roof top unit on curb with new. No increase in size as per plans filed herewith.
B01071576 ↗7118 3 AVENUE
BROOKLYN
AlterationSigned-off09/05/202410/23/2024
Filer DKG
PROPOSE DIRECT REPLACEMENT OF (1) 5 TON PACKAGED UNIT ON EXISTING ROOF CURBS ALL AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE OCCU…
B00860931 ↗8701 4 AVENUE
BROOKLYN
AlterationSigned-off06/21/202306/30/2023Propose to directly replace (2) 7.5 Packaged Roof Top units and (1) 15 ton roof top packaged unit on existing steel dunnage at roof, all as …
B08022570 ↗7118 3 AVENUE
BROOKLYN
AlterationSigned-off11/28/202203/21/2023SCOPE OF WORK:PROPOSE DIRECT REPLACEMENT OF (3) 10 TON PACKAGED UNITS, (2) 5 TON PACKAGED UNITS, (1) 3 TON PACKAGED UNIT, & (1) 4 TON CONDEN…
B00544634 ↗397 PRESIDENT STREET
BROOKLYN
AlterationSigned-off06/29/202103/17/2022PROPOSE NEW MINI-SPLIT SYSTEMS IN CONJUNCTION WITH APPLICATION 321140234.
B00640940 ↗943 KINGS HIGHWAY
BROOKLYN
AlterationSigned-off02/25/202203/11/2022Filing mechanical systems in conjunction with DOB NOW job #B00639307-I1
Counts cover all 6 projects (6 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ARCHITECTURE DESIGN, PLLC409/30/2025
FC CONSULTING ENGINEER, PLLC111/01/2023
NSC ARCHITECTURE, PC106/29/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
HARBOR FITNESS209/30/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DKG209/30/2025
KSTM EXPEDIRING SERVICES206/21/2023
6 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 6Signed off 6
6 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01292849 ↗6119 STRICKLAND AVENUE
BROOKLYN
AlterationSigned-off09/30/202511/17/2025
Filer DKG
Propose direct replacement of a 15 ton package roof top unit on curb with new. No increase in size as per plans filed herewith.
B01071576 ↗7118 3 AVENUE
BROOKLYN
AlterationSigned-off09/05/202410/23/2024
Filer DKG
PROPOSE DIRECT REPLACEMENT OF (1) 5 TON PACKAGED UNIT ON EXISTING ROOF CURBS ALL AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE OCCU…
B00860931 ↗8701 4 AVENUE
BROOKLYN
AlterationSigned-off06/21/202306/30/2023Propose to directly replace (2) 7.5 Packaged Roof Top units and (1) 15 ton roof top packaged unit on existing steel dunnage at roof, all as …
B08022570 ↗7118 3 AVENUE
BROOKLYN
AlterationSigned-off11/28/202203/21/2023SCOPE OF WORK:PROPOSE DIRECT REPLACEMENT OF (3) 10 TON PACKAGED UNITS, (2) 5 TON PACKAGED UNITS, (1) 3 TON PACKAGED UNIT, & (1) 4 TON CONDEN…
B00544634 ↗397 PRESIDENT STREET
BROOKLYN
AlterationSigned-off06/29/202103/17/2022PROPOSE NEW MINI-SPLIT SYSTEMS IN CONJUNCTION WITH APPLICATION 321140234.
B00640940 ↗943 KINGS HIGHWAY
BROOKLYN
AlterationSigned-off02/25/202203/11/2022Filing mechanical systems in conjunction with DOB NOW job #B00639307-I1
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
943 KINGS HIGHWAY ↗107/08/2026
397 PRESIDENT STREET ↗107/08/2026
7118 3 AVENUE ↗407/08/2026
6119 STRICKLAND AVENUE ↗104/09/2026
8701 4 AVENUE ↗303/21/2026
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature32
09/23/2026B01292849-I1 · 6119 STRICKLAND AVENUEOpen ↗
09/23/2026B01292849-I1 · 6119 STRICKLAND AVENUEOpen ↗
09/23/2026B01292849-I1 · 6119 STRICKLAND AVENUEOpen ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B01292849-I1 · 6119 STRICKLAND AVENUEOpen ↗
08/31/2026B08022570-I1 · 7118 3 AVENUEOpen ↗
08/29/2026B00640940-I1 · 943 KINGS HIGHWAYOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00544634-I1 · 397 PRESIDENT STREETOpen ↗
08/31/2026B00640940-P1 · 943 KINGS HIGHWAYOpen ↗
08/31/2026B00640940-I1 · 943 KINGS HIGHWAYOpen ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00544634-I1 · 397 PRESIDENT STREETOpen ↗
08/31/2026B00640940-P1 · 943 KINGS HIGHWAYOpen ↗
08/31/2026B00640940-I1 · 943 KINGS HIGHWAYOpen ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00544634-I1 · 397 PRESIDENT STREETOpen ↗
Showing 1 of 2 on file for this type