← Back
Converted dwellings or rooming house
612 WEST 146 STREET
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1062385
💬 Discuss this project
1926Year Built
3Stories
C5Building Class
R6AZoning
3,268 sfGross Floor Area
10Units
Rent Stabilized12 Open Violations ▸
Converted dwellings or rooming house · Owner of record: 612 A&P REALTY LLC · 1,982 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction24p · 1 filing · 19 docs
Floor 2Under Construction26p · 1 filing · 19 docs
Floor 1Under Construction25p · 1 filing · 19 docs
CellarUnder Construction15p · 1 filing · 19 docs
BasementUnder Construction4p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAMIY REALTY1007/25/2026
612 A&P REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/26/2025$1.4M—— → —$413/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABLE ARCHITECTS LLC301/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ON SITE NYC INCGeneral Contractor207/25/2026
AP PLUMBING & HVAC LLCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABLE ARCHITECTS9452111/14/2025
Building Lifecycle
All (38)Filed (3)Permit Issued (3)Violation (21)Inspection (8)Special Inspection (3)
07/24/2026
Permit issued — General Construction
M01280147-I1-GC
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/07/2026
Filed — Alteration CO
INTERIOR ALTERATION OF EXISTING MULTI-DWELLING BUILDING, INCLUDING MILLWORK, ELECTRICAL, AND PLUMBING AS PER PLANS SUBMITTED HEREWITH.
M01280147-P1
12/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/28/2025
Permit issued — Plumbing
M01280147-S1-PL
11/26/2025
Permit issued — General Construction
M01280147-I1-GC
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Filed — Alteration CO
INTERIOR ALTERATION OF EXISTING MULTI-DWELLING BUILDING, INCLUDING MILLWORK, ELECTRICAL, AND PLUMBING AS PER PLANS SUBMITTED HEREWITH.
M01280147-I1
11/14/2025
Filed — Alteration CO
INTERIOR ALTERATION OF EXISTING MULTI-DWELLING BUILDING, INCLUDING MILLWORK, ELECTRICAL, AND PLUMBING AS PER PLANS SUBMITTED HEREWITH.
M01280147-S1
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINN HWANG
10/31/2025
Special inspection requirement — Interior lighting power
JINN HWANG
10/31/2025
Special inspection requirement — Lighting controls
JINN HWANG
06/04/2025
Violation issued (HPD, open)
A
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/27/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
05/01/2013
Violation issued (HPD, open)
B
08/02/2010
Violation issued (HPD, open)
B
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/1986
Violation issued (HPD, open)
A
10/30/1986
Violation issued (HPD, open)
A
10/30/1986
Violation issued (HPD, open)
B
10/30/1986
Violation issued (HPD, open)
B
10/30/1986
Violation issued (HPD, open)
A
10/30/1986
Violation issued (HPD, open)
A
10/30/1986
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedON SITE NYC INC07/24/2026
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG11/28/2025
DOB NOWGeneral ConstructionPermit IssuedON SITE NYC INC11/26/2025
1 project · most recent 01/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/07/2026Permit IssuedCROSSFIELD PLBG.&HTGGas, Water/Sanitary
1 project · most recent 03/02/2026
General Wiring
FiledStatusContractorScope
03/02/2026Permit IssuedKYL ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/31/2025Fire-Resistant Penetrations and JointsJINN HWANGspecial
10/31/2025Interior lighting powerJINN HWANGenergy_progress
10/31/2025Lighting controlsJINN HWANGenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026M01280147-P1Request digital key ↗
08/20/2026M01280147-I1Request digital key ↗
08/20/2026M01280147-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026M01280147-S1Open ↗
08/13/2026M01280147-P1Open ↗
08/13/2026M01280147-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026M01280147-I1Open ↗
08/22/2026M01280147-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026M01280147-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist3
08/13/2026M01280147-I1Open ↗
08/13/2026M01280147-P1Open ↗
08/13/2026M01280147-S1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01280147-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M01280147-P1Open ↗
08/13/2026M01280147-I1Open ↗
08/13/2026M01280147-S1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026M01280147-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01280147-I1Open ↗