| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01164075 ↗ | 11 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 02/18/2025 | 08/05/2026 | Design ABLE ARCHITECTS LLC Filer ABLE ARCHITECTS LLC | COMBINIING TWO APARTMENT UNITS IN VERTICAL BY ADDING A STAIRCASE/REMOVAL OF NON-BEARING WALLS/CONVERT EXST KITCHEN IN 5W TO A WET BAR/NEW PA… |
| M01314558 ↗ | 614 WEST 146 STREET MANHATTAN | Alteration CO | Permit Issued | 11/24/2025 | 07/27/2026 | Design ABLE ARCHITECTS LLC | Propose rear enlargement (approx. 800 SF) to existing building. Interior renovation under separate Alt-2 application (Job# M01228024-l1).No … |
| M01133367 ↗ | 767 WASHINGTON STREET MANHATTAN | Alteration | Permit Issued | 11/21/2024 | 07/24/2026 | Design CROSS ARCHITECTURE Filer CHROME HEARTS | Construction Fence Application filed in Conjunction with Alt-2 M00937213. No Change in Use, Egress or Occupancy. |
| M01178499 ↗ | 29 3 AVENUE MANHATTAN | Alteration | Permit Issued | 10/01/2025 | 07/24/2026 | Design ABLE ARCHITECTS LLC | RELOCATE THE EXISTING FLOOR DRAIN TO ACCOMMODATE THE RECONFIGURATION OF WALK-IN UNITS. |
| M01280147 ↗ | 612 WEST 146 STREET MANHATTAN | Alteration CO | Permit Issued | 11/14/2025 | 07/24/2026 | Design ABLE ARCHITECTS LLC Owner FAMIY REALTY CORP | INTERIOR ALTERATION OF EXISTING MULTI-DWELLING BUILDING, INCLUDING MILLWORK, ELECTRICAL, AND PLUMBING AS PER PLANS SUBMITTED HEREWITH. |
| B01315579 ↗ | 216 GRAND STREET BROOKLYN | Alteration | Signed-off | 03/02/2026 | 07/23/2026 | Design JD Engineering PC Owner THE LESCHES GROUP INC Filer CAVALRY LLC | PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH ALT II JOB B01315579-I1 |
| Name | Projects together | Most recent |
|---|---|---|
| ABLE ARCHITECTS LLC | 7 | 08/24/2026 |
| CROSS ARCHITECTURE | 3 | 08/12/2025 |
| BRIAN MCDONOUGH, PE | 2 | 10/17/2024 |
| KUSHNER STUDIOS | 2 | 12/01/2025 |
| OM CONSULTING ENGINEERS GROUP | 2 | 08/22/2026 |
| A2 ARCHITECT, PC | 1 | 02/09/2026 |
| ALL CITY ENGINEERING, P.C. | 1 | 08/12/2026 |
| ALLRED & MARTINSON ARCHITECTS PLLC | 1 | 02/18/2026 |
| ANDREW KATZ ENGINEERS | 1 | 10/22/2024 |
| ARCHYTECX DESIGN AND ARCHITECTURE | 1 | 08/12/2026 |
| GARRETT SINGER ARCHITECTS | 1 | 06/15/2023 |
| HANSEN ENGINEERING, PC | 1 | 12/01/2025 |
| JD Engineering PC | 1 | 08/12/2026 |
| SAUL DAVID HAYUTIN ARCHITECTS | 1 | 10/22/2024 |
| THORNTON TOMASETTI | 1 | 05/06/2025 |
| TL ENGINEERING, PC | 1 | 09/11/2024 |
| TSF ENGINEERING, PC | 1 | 05/14/2025 |
| WES CONSULTING ENGINEERS, PLLC | 1 | 05/14/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| CROSSFIELD PLBG.&HTG | 10 | 08/24/2026 |
| JTJ STUDIO CORP | 4 | 10/22/2024 |
| EDSON HTNG & COOLING LLC | 2 | 08/22/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| THE COOPER UNION FOR THE ADVANCEMEN | 2 | 08/24/2026 |
| William Gottlieb Management Co. LLC | 2 | 08/12/2025 |
| 129 EAST 60TH STREET LLC | 1 | 06/15/2023 |
| FAMIY REALTY CORP | 1 | 01/07/2026 |
| FM CONSOLIDATED HOLDING | 1 | 05/16/2025 |
| THE BRAMFORD LLC | 1 | 07/02/2024 |
| THE LESCHES GROUP INC | 1 | 08/12/2026 |
| TIDAL REAL ESTATE PARTNERS LP | 1 | 12/01/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| CHROME HEARTS | 2 | 08/12/2025 |
| KUSHNER STUDIOS | 2 | 12/01/2025 |
| ABLE ARCHITECTS LLC | 1 | 08/04/2025 |
| AGOUTI CONSTRUCTION CONSULTING | 1 | 02/18/2026 |
| CAVALRY LLC | 1 | 08/12/2026 |
| J.A. EXPEDITING, LLC | 1 | 02/09/2026 |
| JM ZONING, LLC. | 1 | 05/14/2025 |
| WILLIAM VITACCO ASSOCIATES | 1 | 06/15/2023 |
| WSCONSULTANT & EXPEDITING SERVICES | 1 | 10/22/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01164075 ↗ | 11 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 02/18/2025 | 08/05/2026 | Design ABLE ARCHITECTS LLC Filer ABLE ARCHITECTS LLC | COMBINIING TWO APARTMENT UNITS IN VERTICAL BY ADDING A STAIRCASE/REMOVAL OF NON-BEARING WALLS/CONVERT EXST KITCHEN IN 5W TO A WET BAR/NEW PA… |
| M01314558 ↗ | 614 WEST 146 STREET MANHATTAN | Alteration CO | Permit Issued | 11/24/2025 | 07/27/2026 | Design ABLE ARCHITECTS LLC | Propose rear enlargement (approx. 800 SF) to existing building. Interior renovation under separate Alt-2 application (Job# M01228024-l1).No … |
| M01133367 ↗ | 767 WASHINGTON STREET MANHATTAN | Alteration | Permit Issued | 11/21/2024 | 07/24/2026 | Design CROSS ARCHITECTURE Filer CHROME HEARTS | Construction Fence Application filed in Conjunction with Alt-2 M00937213. No Change in Use, Egress or Occupancy. |
| M01178499 ↗ | 29 3 AVENUE MANHATTAN | Alteration | Permit Issued | 10/01/2025 | 07/24/2026 | Design ABLE ARCHITECTS LLC | RELOCATE THE EXISTING FLOOR DRAIN TO ACCOMMODATE THE RECONFIGURATION OF WALK-IN UNITS. |
| M01280147 ↗ | 612 WEST 146 STREET MANHATTAN | Alteration CO | Permit Issued | 11/14/2025 | 07/24/2026 | Design ABLE ARCHITECTS LLC Owner FAMIY REALTY CORP | INTERIOR ALTERATION OF EXISTING MULTI-DWELLING BUILDING, INCLUDING MILLWORK, ELECTRICAL, AND PLUMBING AS PER PLANS SUBMITTED HEREWITH. |
| B01315579 ↗ | 216 GRAND STREET BROOKLYN | Alteration | Signed-off | 03/02/2026 | 07/23/2026 | Design JD Engineering PC Owner THE LESCHES GROUP INC Filer CAVALRY LLC | PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH ALT II JOB B01315579-I1 |
| M00480807 ↗ | 129 EAST 60 STREET MANHATTAN | Alteration CO | Permit Issued | 06/15/2021 | 07/23/2026 | Design GARRETT SINGER ARCHITECTS Owner 129 EAST 60TH STREET LLC | Relocating residential unit and commercial unit on the 1st floor. Related work is been filed under separated applications OT-123788534, PL-M… |
| M00937213 ↗ | 767 WASHINGTON STREET MANHATTAN | Alteration | Permit Issued | 12/01/2023 | 07/23/2026 | Design CROSS ARCHITECTURE | Interior Demolition and Renovation of an Existing Restaurant and (2) Dwelling Units. No Change in Use, or Occupancy. |
| M00937408 ↗ | 767 WASHINGTON STREET MANHATTAN | Alteration CO | Permit Issued | 12/18/2023 | 07/23/2026 | Filer JM ZONING, LLC. | FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS. |
| M01188346 ↗ | 9 BARROW STREET MANHATTAN | Alteration | Permit Issued | 05/06/2025 | 07/23/2026 | Design THORNTON TOMASETTI | Provide and install new grease hood exhaust ductwork, grease hood exhaust fan, New Air Conditioning ductwork, dampers, air handling unit gro… |
| M01228024 ↗ | 614 WEST 146 STREET MANHATTAN | Alteration | Permit Issued | 05/29/2025 | 07/23/2026 | Design ABLE ARCHITECTS LLC | NEW OUTDOOR CONDENSER & INDOOR AIR HANDLING UNITS INSTALLATION |
| M01354979 ↗ | 1025 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/18/2026 | 07/23/2026 | Renovation of an existing apartment # 8AS on the 8th floor. Work includes non-structural demolition, general construction and mechanical mod… | |
| M01182201 ↗ | 29 3 AVENUE MANHATTAN | Alteration | Permit Issued | 09/30/2025 | 04/09/2026 | Design ABLE ARCHITECTS LLC | REVISED PLUMBING RISER DIAGRAM BASED ON AS-BUILT CONDITIONS |
| M01273885 ↗ | 415 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 08/26/2025 | 10/06/2025 | Design A2 ARCHITECT, PC Filer J.A. EXPEDITING, LLC | FILING APPLICATION FOR THE INTERIOR RENOVATION AND MECHANICAL SYSTEMS WORK AT APARTMENT 6D ON THE 6th FLOOR. FILED IN CONJUNCTION WITH PLUM… |
| B01186320 ↗ | 326 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 03/07/2025 | 06/24/2025 | Design KUSHNER STUDIOS Filer KUSHNER STUDIOS | MINOR ALTERATION TO EXISTING SPRINKLER SYSTEM TO ACCOMMODATE TENANT FITOUT INCLUDING A NEW NON-RATED DROP CEILING DETAIL AS PER THE DRAWINGS… |
| B01215759 ↗ | 1329 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 05/16/2025 | 06/12/2025 | Design KUSHNER STUDIOS Owner FM CONSOLIDATED HOLDING Filer KUSHNER STUDIOS | MINOR INTERIOR DEMO TO WHITE BOX THE SPACE FOR FUTURE TENANT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01115130 ↗ | 100 2 AVENUE MANHATTAN | Alteration | Signed-off | 10/17/2024 | 01/29/2025 | Design BRIAN MCDONOUGH, PE | LEGALIZATION OF EXISTING REFRIGERATION COMPRESSOR. FOOD SERVICE EQUIPMENT BEING SUBMITTED FOR OBTAINING CERTIFICATE OF COMPLIANCE. |
| M01063752 ↗ | 100 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 01/15/2025 | Design BRIAN MCDONOUGH, PE Owner THE BRAMFORD LLC | Filing Submission for Legalization of (6) split AC Heat Pumps. |
| M00980165 ↗ | 832 BROADWAY MANHATTAN | Alteration | Permit Issued | 12/24/2023 | 11/01/2024 | Design ANDREW KATZ ENGINEERS | SPRINKLER MODIFICATIONS FOR 4TH FLOOR APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q01106852 ↗ | 150-24 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 09/11/2024 | 09/17/2024 | Design TL ENGINEERING, PC | INSTALLATION OF S/S KITCHEN HOOD FOR EXISTING KITCHEN AT CELLAR AND SECOND FLOOR. NO CHANGE IN USE, OCCUPANCY ND MEANS OF EGRESS IS INVOLVED… |
| M01058690 ↗ | 1025 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/10/2024 | 09/10/2024 | Design ABLE ARCHITECTS LLC | COOP RENOVATION. UPDATING BATHROOMS & KITCHEN (NO MOVING OR RISERS OR PLUMBING LOCATIONS) REFINISH FLOORING. RESTORE TO ITS ORIGINAL CONDITI… |
| Building | Filings | Most Recent |
|---|---|---|
| 216 GRAND STREET ↗ | 2 | 08/26/2026 |
| 11 WEST 18 STREET ↗ | 3 | 08/06/2026 |
| 614 WEST 146 STREET ↗ | 12 | 07/28/2026 |
| 612 WEST 146 STREET ↗ | 2 | 07/25/2026 |
| 29 3 AVENUE ↗ | 2 | 07/25/2026 |
| 767 WASHINGTON STREET ↗ | 10 | 07/25/2026 |
| 129 EAST 60 STREET ↗ | 2 | 07/25/2026 |
| 1025 5 AVENUE ↗ | 4 | 07/25/2026 |
| 9 BARROW STREET ↗ | 4 | 07/25/2026 |
| 100 2 AVENUE ↗ | 2 | 07/08/2026 |
| 832 BROADWAY ↗ | 1 | 07/08/2026 |
| 1329 WILLOUGHBY AVENUE ↗ | 1 | 07/08/2026 |
| 326 WYTHE AVENUE ↗ | 1 | 07/08/2026 |
| 29 3 AVENUE ↗ | 2 | 06/27/2026 |
| 415 GREENWICH STREET ↗ | 1 | 04/08/2026 |
| 150-24 NORTHERN BOULEVARD ↗ | 3 | 03/21/2026 |