613 WEST 155TH STREET · BIN 1081864
💬 Discuss this project
1910Year Built
6Stories
P7Building Class
R8Zoning
57,800 sfGross Floor Area
2Units
LL97 Covered0 Active Violations 4 old, status unconfirmed ▸FDNY Report ↗
Museum · 39,966 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEhispanic MUSEUM&LIBRARY, Hispanic Society Museum & LibraryUnder Construction29p · 4 filings · 20 docs
AtticEhispanic MUSEUM&LIBRARY17p · 1 filing · 20 docs
Floor 41 filing
Floor 3Ehispanic MUSEUM&LIBRARY, Hispanic Society Museum & Library34p · 3 filings · 20 docs
Floor 2Ehispanic MUSEUM&LIBRARY, Hispanic Society Museum & Library35p · 5 filings · 20 docs
Floor 1Ehispanic MUSEUM&LIBRARY, Hispanic Society Museum & LibraryUnder Construction56p · 9 filings · 20 docs
CellarEhispanic MUSEUM&LIBRARY, Hispanic Society Museum & LibraryUnder Construction47p · 5 filings · 20 docs
BasementSlab on grade and mechanical equipment padsUnder Construction4p · 1 filing · 20 docs
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hispanic Society of America10210/13/2026
Bigman Brothers103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Soni Engineering Consulting210/20/2026
Silman505/29/2026
Kohler Ronan805/26/2026
Beyer Blinder Belle105/19/2026
Richard W. Southwick507/11/2025
Murray Engineering105/17/2023
EP Engineering103/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec3003/21/2026
Paul Fusco Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wolf Construction Corp 20General Contractor907/08/2026
Vanguard Construction andGeneral Contractor807/08/2026
William C. Gerakaris P&HPlumbing407/08/2026
Roundsquare BuildersGeneral Contractor208/30/2026
Tarasis ElectricElectrical103/21/2026
Bigman BrothersElectrical103/22/2026
Bigman BrothersElectrical103/21/2026
Star-Delta ElectricElectrical103/21/2026
Cedar Electrical ContractorsElectrical103/22/2026
J.H. Electric of New YorkElectrical103/21/2026
Melissinos NickElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cole Technologies/Control1290605/29/2026
Atlas ATC Engineering8011901/13/2025
Murray Engineering1434105/17/2023
Atlantic Engineeringlabor1381210/14/2022
EP Engineering658103/02/2021
Building Lifecycle
All (140)Filed (23)Permit Issued (13)Signed Off (8)Violation (36)Inspection (2)Objection (28)Special Inspection (30)
10/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01476443-I1
10/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01476442-I1
09/09/2026
Signed off — Alteration
interior removals of partitions and interior renovation, filed in conjunction with M00713133, M00713129, M00713125
M00713135-I1
08/31/2026
Signed off — Alteration
Mechanical systems filed in conjunction with M00713135, M00713133, M00713129
M00713125-I1
08/27/2026
Permit issued — Structural
M01399632-S4-ST
08/20/2026
Permit issued — General Construction
M01399632-I1-GC
07/29/2026
Objection resolved — Addressed
07/28/2026
Objection resolved — Resolved
07/23/2026
Objection raised — Scope
07/23/2026
Objection raised — Cost
06/18/2026
Objection resolved — Resolved
06/18/2026
Objection resolved — Resolved
06/18/2026
Objection resolved — Resolved
06/18/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Resolved
06/07/2026
Objection raised — Admin
06/07/2026
Objection raised — Admin
06/07/2026
Objection raised — Admin
06/07/2026
Objection raised — Admin
06/07/2026
Objection raised — Admin
05/29/2026
Filed — Alteration
REMOVE THE EXISTING BOILER AND ASSOCIATED FUEL OIL SYSTEM (TANKS, PIPES, ETC.)SERVING THE BOILER IN THEIR ENTIRETY. DISCONNECT AND MAINTAIN THE EXISTING STEAMPIPING AND FLUE.
M01399632-S4
05/26/2026
Filed — Alteration
REMOVE THE EXISTING BOILER AND ASSOCIATED FUEL OIL SYSTEM (TANKS, PIPES, ETC.)SERVING THE BOILER IN THEIR ENTIRETY. DISCONNECT AND MAINTAIN THE EXISTING STEAMPIPING AND FLUE.
M01399632-S2
05/26/2026
Filed — Alteration
REMOVE THE EXISTING BOILER AND ASSOCIATED FUEL OIL SYSTEM (TANKS, PIPES, ETC.)SERVING THE BOILER IN THEIR ENTIRETY. DISCONNECT AND MAINTAIN THE EXISTING STEAMPIPING AND FLUE.
M01399632-S3
05/22/2026
Filed — Alteration
REMOVE THE EXISTING BOILER AND ASSOCIATED FUEL OIL SYSTEM (TANKS, PIPES, ETC.)SERVING THE BOILER IN THEIR ENTIRETY. DISCONNECT AND MAINTAIN THE EXISTING STEAMPIPING AND FLUE.
M01399632-S1
05/22/2026
Special inspection requirement — Heating Systems
GEORGE ANDERSEN
05/21/2026
Special inspection requirement — Structural Steel - Welding
GEORGE ANDERSEN
05/21/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE ANDERSEN
05/21/2026
Special inspection requirement — Post-installed anchors in masonry
GEORGE ANDERSEN
05/21/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE ANDERSEN
05/20/2026
Signed off — Alteration
Temporary shoring of the retaining wall probes. No change to use, egress or occupancy.
M01121537-S2
05/19/2026
Filed — Alteration
REMOVE THE EXISTING BOILER AND ASSOCIATED FUEL OIL SYSTEM (TANKS, PIPES, ETC.)SERVING THE BOILER IN THEIR ENTIRETY. DISCONNECT AND MAINTAIN THE EXISTING STEAMPIPING AND FLUE.
M01399632-I1
05/18/2026
Special inspection requirement — Structural Steel - Details
GEORGE ANDERSEN
05/15/2026
Signed off — Alteration
Temporary shoring of the retaining wall probes. No change to use, egress or occupancy.
M01121537-I1
05/14/2026
Special inspection requirement — Final
GEORGE ANDERSEN
04/09/2026
Signed off — Alteration
Temporary shoring of the retaining wall probes. No change to use, egress or occupancy.
M01121537-S1
09/02/2025
Permit issued — General Construction
M01121537-S2-GC-CX
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
07/29/2025
Objection raised — Structural
07/29/2025
Objection raised — Structural
07/29/2025
Objection raised — Admin
07/29/2025
Objection raised — Structural
07/11/2025
Filed — Alteration
Temporary shoring of the retaining wall probes. No change to use, egress or occupancy.
M01121537-P1
07/11/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE ANDERSEN
07/11/2025
Special inspection requirement — Final
GEORGE ANDERSEN
07/11/2025
Special inspection requirement — Structural Steel - Details
GEORGE ANDERSEN
07/11/2025
Special inspection requirement — Post-installed Anchors
GEORGE ANDERSEN
07/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE ANDERSEN
07/09/2025
Filed — Alteration
Temporary shoring of the retaining wall probes. No change to use, egress or occupancy.
M01121537-S2
07/09/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE ANDERSEN
06/12/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE ANDERSEN
06/12/2025
Special inspection requirement — Footing and Foundation
GEORGE ANDERSEN
06/12/2025
Special inspection requirement — Final
GEORGE ANDERSEN
06/12/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE ANDERSEN
06/12/2025
Special inspection requirement — Subgrade Inspections
GEORGE ANDERSEN
03/24/2025
Signed off — Alteration
FILING FOR STRUCTURAL WORK IN CONJUCNTION WITH M00713135; M00713129; M00713125
M00713133-I1
01/21/2025
Signed off — Alteration
Installation of plumbing fixtures in conjunction with M00713125, M00713133, M00713135. Single occupancy restroom on floor 001 - fed by the existing plumbing in the building. Secondary backflow preventor is being installed
M00713129-I1
01/21/2025
Special inspection requirement — Final
RONALD GRAPIN
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedRoundsquare Builders08/27/2026
DOB NOWGeneral ConstructionPermit IssuedRoundsquare Builders08/20/2026
DOB NOWGeneral ConstructionSigned-offWolf Construction Corp 2009/02/2025
DOB NOWStructuralSigned-offWolf Construction Corp 2011/15/2024
DOB NOWStructuralSigned-offWolf Construction Corp 2011/13/2024
DOB NOWGeneral ConstructionSigned-offVanguard Construction and06/14/2023
DOB NOWMechanical SystemsSigned-offVanguard Construction and06/14/2023
DOB NOWGeneral ConstructionSigned-offWolf Construction Corp 2005/24/2023
DOB NOWEarth WorkSigned-offVanguard Construction and10/21/2022
DOB NOWMechanical SystemsSigned-offVanguard Construction and08/22/2022
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H08/18/2022
DOB NOWGeneral ConstructionSigned-offVanguard Construction and08/10/2022
DOB NOWMechanical SystemsPermit IssuedWolf Construction Corp 2003/02/2021
BISPLISSUEDI.M.P. Plumbing & Heating11/06/2025
BISMHISSUEDPJM and Sons02/05/2020
BISPLISSUEDHydronic Concepts NY P&H02/11/2019
BISMHISSUEDPJM and Sons02/06/2019
BISPLISSUEDMac Felder08/16/2018
BISOTISSUEDWesterman Construction Co07/03/2018
BISMHISSUEDWesterman Construction Co07/03/2018
BISOTISSUEDWesterman Construction Co07/03/2018
BISEQISSUEDEagle Scaffolding Services06/18/2018
BISEQISSUEDEagle Scaffolding Services03/12/2018
BISEQISSUEDEagle Scaffolding Services03/12/2018
BISEQISSUEDEagle Scaffolding Services02/21/2018
BISPLISSUEDMac Felder08/24/2017
BISOTISSUEDWesterman Construction Co07/11/2017
BISOTISSUEDWesterman Construction Co07/11/2017
BISMHISSUEDWesterman Construction Co07/11/2017
BISEQISSUEDEagle Scaffolding Services06/23/2017
BISEQISSUEDEagle Scaffolding Services04/25/2017
BISEQISSUEDEagle Scaffolding Services03/24/2017
BISEQISSUEDEagle Scaffolding Services03/08/2017
BISPLISSUEDMaxwell Plumbing Mechanical01/24/2017
BISOTISSUEDA.W. & S. Construction Co07/23/2015
BISEQISSUEDPrecision Hoist & Scaffo*05/28/2015
BISEQISSUEDCS Bridge04/03/2015
BISEQISSUEDCS Bridge04/03/2015
BISEQISSUEDCS Bridge03/21/2014
BISEQISSUEDCS Bridge03/21/2014
+ 23 more permits on file
2 projects · most recent 01/13/2025
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/13/2025Signed-offVanguard Construction andAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
— DAIKIN / FXTQ60TAVJUAAD DAIKIN / RXTQ60TAVJUA 1,500 CFM · Split System ×4
DAIKIN FXTQ60TAVJUAAD DAIKIN RXTQ60TAVJUA 1,500 CFM · Split System ×4
Daikin DAIKIN 1,500 CFM · Split System ×1
daikin 1,500 CFM · Split System ×1
Ventilation
N/A aaon cfa-002-a-a-8-ba00g aaon v3-alb-8-0-141d-000 800 CFM · Erv ×4
na 1 BTU ×1
Aaon AAON 1 BTU · Erv ×1
Ducts & Piping
N/A na 1 tons ×5
03/02/2021Permit IssuedWolf Construction Corp 20Air Conditioning Systems
Cooling
Daikin FXTQ48TAVJUA 1,480 CFM · Vrf Indoor ×1
RXTQ48TAVJUA 4 tons · Vrf Outdoor ×1
1 project · most recent 05/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/29/2026——Gas, Water/Sanitary
9 projects · most recent 10/15/2026
General Wiring Lighting
FiledStatusContractorScope
10/15/2026Permit IssuedSolas Electrical—
10/12/2026Permit IssuedPJZ MaintenanceGeneral Wiring
12/17/2022Permit IssuedCedar Electrical ContractorsGeneral Wiring
08/18/2022CompleteBigman BrothersGeneral Wiring, Lighting
10/04/2021CompleteBigman BrothersLighting
06/03/2021CompleteBigman BrothersGeneral Wiring
12/08/2020Permit IssuedCogen Electrical ServicesGeneral Wiring
08/10/2018CompleteH & L ElectricGeneral Wiring
02/20/2018CompleteH & L ElectricGeneral Wiring
2 projects · most recent 05/29/2026
Steel Concrete
FiledStatusContractorScope
05/29/2026Permit IssuedRoundsquare BuildersSteel
07/11/2025Signed-offWolf Construction Corp 20Concrete
2 projects · most recent 10/20/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/20/2026——Sidewalk Shed
10/20/2026——Scaffold
1 project · most recent 07/11/2025
Earthwork
FiledStatusContractorScope
07/11/2025Signed-offWolf Construction Corp 20Earthwork
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
05/22/2026Heating SystemsGEORGE ANDERSENspecial
05/21/2026Structural Steel - WeldingGEORGE ANDERSENspecial
05/21/2026Concrete - Cast-In-PlaceGEORGE ANDERSENspecial
05/21/2026Post-installed anchors in masonryGEORGE ANDERSENspecial
05/21/2026Structural Steel - High Strength BoltingGEORGE ANDERSENspecial
05/18/2026Structural Steel - DetailsGEORGE ANDERSENspecial
05/14/2026FinalGEORGE ANDERSENprogress
07/11/2025Structural Steel - High Strength BoltingGEORGE ANDERSENspecial
07/11/2025FinalGEORGE ANDERSENprogress
07/11/2025Structural Steel - DetailsGEORGE ANDERSENspecial
07/11/2025Post-installed AnchorsGEORGE ANDERSENspecial
07/11/2025Structural Stability – Alterations of existing buildingsGEORGE ANDERSENspecial
07/09/2025Concrete - Cast-In-PlaceGEORGE ANDERSENspecial
06/12/2025Excavations - Sheeting, Shoring, and BracingGEORGE ANDERSENspecial
06/12/2025Footing and FoundationGEORGE ANDERSENprogress
06/12/2025FinalGEORGE ANDERSENprogress
06/12/2025Subsurface Conditions – Fill Placement & In-Place DensityGEORGE ANDERSENspecial
06/12/2025Subgrade InspectionsGEORGE ANDERSENspecial
01/21/2025FinalRONALD GRAPINprogress
01/21/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
01/21/2025Mechanical SystemsRONALD GRAPINspecial
01/09/2025Mechanical SystemsRONALD GRAPINspecial
01/09/2025FinalRONALD GRAPINprogress
01/09/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
10/11/2024PreliminaryGEORGE ANDERSENprogress
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ehispanic MUSEUM&LIBRARYArts / Culture / EntertainmentCellar, Floors 1–3, Roof
Project M01121537 Alteration · LOC Issued · 10/28/2024
Project M00713133 Alteration · LOC Issued · 04/14/2022
Project M00713125 Alteration · LOC Issued · 04/13/2022
Project M00713129 Alteration · LOC Issued · 04/13/2022
Hispanic Society Museum & LibraryArts / Culture / EntertainmentCellar, Floors 1–3
Project M00863646 Alteration · LOC Issued · 05/17/2023
Project M00713135 Alteration · LOC Issued · 04/18/2022
Project M00459570 Alteration · Permit Entire · 03/02/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 605 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch20
09/02/2026M00713133-P3Request digital key ↗
09/02/2026M00713133-I1Request digital key ↗
09/02/2026M00713135-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00459570-I1Request digital key ↗
▸Applications & Permits138
▸BISWORK PERMIT APPLICATION67
11/06/2025123376417Open ↗
02/06/2020123376417Open ↗
08/16/2019122901155Open ↗
Showing 3 of 67 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION52
09/15/2025123376417Open ↗
09/15/2025123376417Open ↗
09/15/2025123376417Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWLPC Approval/Permit19
09/02/2026M00713135-I1Open ↗
09/02/2026M00713135-P2Open ↗
08/17/2026M01399632-S3Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications162
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION77
01/13/2020122901155Open ↗
12/26/2019122901155Open ↗
10/09/2019123056600Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/04/2026M00459570-I1Open ↗
09/02/2026M00713133-P2Open ↗
09/02/2026M00713133-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
07/03/2017123295834Open ↗
04/27/2017123087033Open ↗
04/04/2017123056600Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/29/2026M01121537-S2Open ↗
09/23/2026M00713133-P2Open ↗
09/23/2026M00713133-P2Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
04/03/2013121569409Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/29/2026M01121537-S2Open ↗
09/23/2026M00713133-P2Open ↗
09/02/2026M00713135-P2Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/03/2017123295834Open ↗
04/27/2017123087033Open ↗
04/04/2017123056600Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/27/2015140352981Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/27/2015140352981Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/02/2018123376417Open ↗
12/30/2016122983566Open ↗
09/23/2016122901155Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/02/2018123376417Open ↗
12/30/2016122983566Open ↗
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos47
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/04/2026M00459570-I1Open ↗
09/02/2026M00713133-I1Open ↗
09/02/2026M00713133-P3Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/13/2020122901155Open ↗
04/04/2017123056600Open ↗
12/30/2016122983566Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/15/2026M01399632-S2Open ↗
08/15/2026M01399632-S4Open ↗
08/15/2026M01399632-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
01/13/2020122901155Open ↗
01/13/2020122901155Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/02/2018123376417Open ↗
▸Energy Compliance6
▸BISTR8: Energy Code Progress Inspections2
01/28/2013121514780Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
07/15/2019122901155Open ↗
07/05/2019122901155Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/22/2017122411657Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/10/2015122411657Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/27/2015140352981Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/13/2020122901155Open ↗
▸Approvals, Objections & Sign-offs98
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
01/13/2020122901155Open ↗
10/09/2019123056600Open ↗
08/19/2019123295834Open ↗
Showing 3 of 24 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
04/03/2013121569409Open ↗
01/28/2013121514780Open ↗
Showing 2 of 21 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
09/02/2026M00713133-I1Open ↗
09/02/2026M00713133-P3Open ↗
09/02/2026M00713135-P2Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
09/15/2025123376417Open ↗
09/15/2025123376417Open ↗
02/23/2018123020480Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS APPROVAL13
07/15/2019122901155Open ↗
08/14/2018123376417Open ↗
07/02/2018123376417Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS4
03/25/2013120014590Open ↗
03/25/2013120014590Open ↗
03/25/2013120098367Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
11/06/2025123376417Open ↗
▸BISLANDMARKS SIGNOFF1
01/25/2017122983566Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT28
01/13/2020122901155Open ↗
07/15/2019122901155Open ↗
07/02/2018123376417Open ↗
Showing 3 of 28 on file for this type
▸Filing & Intake Forms50
▸BISEFILING COVER SHEET31
07/02/2018123376417Open ↗
07/03/2017123295834Open ↗
04/27/2017123087033Open ↗
Showing 3 of 31 on file for this type
▸BISADDITIONAL INFORMATION12
12/26/2019122901155Open ↗
03/28/2018123056600Open ↗
03/28/2018123020480Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM6
01/13/2020122901155Open ↗
10/09/2019123056600Open ↗
08/19/2019123295834Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/27/2015140352981Open ↗
▸Other Documents38
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION20
07/05/2019122901155Open ↗
07/21/2017122901155Open ↗
07/03/2017123295834Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProof of Historic Building11
09/02/2026M00713135-P2Open ↗
09/02/2026M00713135-I1Open ↗
08/13/2026M00713129-I1Open ↗
Showing 3 of 11 on file for this type
▸BISSupporting Document: Fee Deferment2
12/30/2016122983566Open ↗
09/23/2016122901155Open ↗
▸BISLAA - Supporting Documentation2
01/13/2020122901155Open ↗
01/13/2020122901155Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00713133-I1Open ↗
08/13/2026M01121537-S2Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type