| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00537227 ↗ | 109 STATE STREET BROOKLYN | Alteration | Signed-off | 09/28/2021 | 07/03/2023 | Design EP ENGINEERING LLC Contractor PILASTER DEVELOPMENT LLC | MECHANICAL WORK PROPOSED FOR A SINGLE FAMILY HOME |
| M00372104 ↗ | 25 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 11/21/2022 | 01/12/2023 | Design EP ENGINEERING LLC Owner THOR EQUITIES, LLC Contractor FLOW-RIGHT FIRE SUPP CORP Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 14TH FLOOR & 14TH FLOOR MEZZANINE AS PER PLANS FILED HEREWITH. NO CHANGE IN U… |
| M00535530 ↗ | 240 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 06/24/2021 | 10/25/2022 | Contractor RISE CONSTRUCTION SOLUTIO | MODIFICATIONS TO EXISTING PLUMBING SYSTEM IN EXISTING CONDO APT. #16B, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00582764 ↗ | 7 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 09/01/2021 | 10/07/2022 | Design THEODORE BODNAR ARCHITECT PC Contractor MAXWELL PLUMB MECH. CORP | Sprinkler - removal of only low hanging heads. |
| M00190032 ↗ | 132 WEST 21 STREET MANHATTAN | Alteration | Permit Issued | 08/01/2019 | 07/29/2022 | Design EP ENGINEERING LLC Owner SCHOOL OF VISUAL ARTS Contractor GENERAL PLUMBING CORP Filer BURNHAM NATIONWIDE INC | SPRINKLER MODIFICATIONS FOR CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00190049 ↗ | 136 WEST 21 STREET MANHATTAN | Alteration | Permit Issued | 08/01/2019 | 07/29/2022 | Design EP ENGINEERING LLC Contractor GENERAL PLUMBING CORP | SPRINKLER MODIFICATIONS FOR CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| ESNYC CONSULTING INC | 1 | 07/27/2021 |
| HEITLER HOUSTOUN ARCHITECTS | 1 | 09/30/2021 |
| LYNCH EISINGER DESIGN ARCHITECTS | 1 | 08/18/2022 |
| PATTI & ANTHES CONSULTING ENGINEERS | 1 | 01/27/2021 |
| THEODORE BODNAR ARCHITECT PC | 1 | 09/01/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| DK CONSTRUCTION ONE, CORP | 6 | 09/20/2021 |
| AIK RENOVATION INC | 2 | 07/19/2021 |
| ARANDA PLBG & HTG CORP | 2 | 08/05/2021 |
| GENERAL PLUMBING CORP | 2 | 08/01/2019 |
| P.S.I. MECHANICAL | 2 | 07/06/2021 |
| DYNAMIC PLBNG & SPRKR COR | 1 | 08/05/2021 |
| ENOBRAC PLUMBING, INC | 1 | 01/28/2021 |
| FLOW-RIGHT FIRE SUPP CORP | 1 | 11/21/2022 |
| KEVO CONSTRUCTION INC | 1 | 04/12/2021 |
| LYTER GROUP INC | 1 | 01/10/2020 |
| MAXWELL PLUMB MECH. CORP | 1 | 09/01/2021 |
| MCLNY PLBG & HEATING LLC | 1 | 11/09/2021 |
| MICHILLI INC | 1 | 11/09/2021 |
| NATIONWIDE MECHANICAL INC | 1 | 03/02/2023 |
| NU-WAY HEATING & COOLING | 1 | 08/05/2021 |
| P & D MECHANICAL CORP | 1 | 07/07/2020 |
| PILASTER DEVELOPMENT LLC | 1 | 04/11/2025 |
| PLUMBING & HTG DOCTOR INC | 1 | 08/18/2022 |
| POWER COOLING INC | 1 | 01/27/2021 |
| RISE CONSTRUCTION SOLUTIO | 1 | 08/18/2022 |
| S & J INDUSTRIAL CORP | 1 | 04/12/2021 |
| SPRICE CONTRACTING INC | 1 | 09/30/2021 |
| TRISTATE FIRE SPRINK INC | 1 | 09/01/2021 |
| WOLF CONSTRUCTION CORP 20 | 1 | 03/02/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| GORILLAS TECHNOLOGIES US, INC. | 11 | 09/07/2021 |
| BUCHBINDER & WARREN LLC | 3 | 03/02/2023 |
| The Kibel Companies, LLC | 3 | 08/05/2021 |
| AVISON YOUNG - NEW YORK, LLC | 1 | 07/07/2020 |
| BOULEVARD TOGETHER DEVELOPER LLC | 1 | 01/10/2020 |
| BROAD STREET PLAZA LLC | 1 | 01/28/2021 |
| Hispanic Society of America | 1 | 03/02/2021 |
| PINETREE GROUP, INC. | 1 | 09/20/2021 |
| SAMSUNG 837 | 1 | 09/30/2021 |
| SCHOOL OF VISUAL ARTS | 1 | 08/01/2019 |
| THOR EQUITIES, LLC | 1 | 11/21/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| PWF | 20 | 03/02/2023 |
| AGOUTI CONSTRUCTION CONSULTING | 1 | 08/18/2022 |
| RIZZO GROUP | 1 | 01/28/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00537227 ↗ | 109 STATE STREET BROOKLYN | Alteration | Signed-off | 09/28/2021 | 07/03/2023 | Design EP ENGINEERING LLC Contractor PILASTER DEVELOPMENT LLC | MECHANICAL WORK PROPOSED FOR A SINGLE FAMILY HOME |
| M00372104 ↗ | 25 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 11/21/2022 | 01/12/2023 | Design EP ENGINEERING LLC Owner THOR EQUITIES, LLC Contractor FLOW-RIGHT FIRE SUPP CORP Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 14TH FLOOR & 14TH FLOOR MEZZANINE AS PER PLANS FILED HEREWITH. NO CHANGE IN U… |
| M00535530 ↗ | 240 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 06/24/2021 | 10/25/2022 | Contractor RISE CONSTRUCTION SOLUTIO | MODIFICATIONS TO EXISTING PLUMBING SYSTEM IN EXISTING CONDO APT. #16B, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00582764 ↗ | 7 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 09/01/2021 | 10/07/2022 | Design THEODORE BODNAR ARCHITECT PC Contractor MAXWELL PLUMB MECH. CORP | Sprinkler - removal of only low hanging heads. |
| M00190032 ↗ | 132 WEST 21 STREET MANHATTAN | Alteration | Permit Issued | 08/01/2019 | 07/29/2022 | Design EP ENGINEERING LLC Owner SCHOOL OF VISUAL ARTS Contractor GENERAL PLUMBING CORP Filer BURNHAM NATIONWIDE INC | SPRINKLER MODIFICATIONS FOR CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00190049 ↗ | 136 WEST 21 STREET MANHATTAN | Alteration | Permit Issued | 08/01/2019 | 07/29/2022 | Design EP ENGINEERING LLC Contractor GENERAL PLUMBING CORP | SPRINKLER MODIFICATIONS FOR CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00492378 ↗ | 45 MAIN STREET BROOKLYN | Alteration | Signed-off | 04/12/2021 | 04/14/2022 | Design EP ENGINEERING LLC Contractor KEVO CONSTRUCTION INC | APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR (RETAIL STORE - REFORM) AS PER PLANS FIELD HEREWITH. NO CHANGE IN … |
| B00492405 ↗ | 45 MAIN STREET BROOKLYN | Alteration | Signed-off | 04/12/2021 | 03/04/2022 | Design EP ENGINEERING LLC Contractor S & J INDUSTRIAL CORP | APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR (RETAIL STORE - REFORM) AS PER PLANS FIELD HEREWITH. NO CHANGE IN U… |
| M00619644 ↗ | 100 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/09/2021 | 11/23/2021 | Design EP ENGINEERING LLC Owner BUCHBINDER & WARREN LLC Contractor NATIONWIDE MECHANICAL INC Filer PWF | MODIFICATION OF EXISTING SPRINKLER SYSTEM TO INCLUDE INSTALLATION OF NEW SPRINKLER HEADS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, … |
| M00618876 ↗ | 100 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/09/2021 | 11/22/2021 | Design EP ENGINEERING LLC Owner BUCHBINDER & WARREN LLC Contractor NATIONWIDE MECHANICAL INC Filer PWF | MODIFICATIONS TO EXISTING PLUMBING SYSTEMS TO INCLUDE FIXTURE INSTALLATION AND ASSOCIATED PIPING. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDE… |
| M00555677 ↗ | 547 WEST 27 STREET MANHATTAN | Alteration | Permit Issued | 09/20/2021 | 11/17/2021 | Design EP ENGINEERING LLC Owner PINETREE GROUP, INC. Contractor DK CONSTRUCTION ONE, CORP Filer PWF | MECHANICAL MODIFICATIONS TO EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE HVAC INSTALLATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE T… |
| M00618902 ↗ | 100 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/09/2021 | 11/12/2021 | Design EP ENGINEERING LLC Owner BUCHBINDER & WARREN LLC Contractor MICHILLI INC Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCT WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANG… |
| M00598365 ↗ | 837 WASHINGTON STREET MANHATTAN | Alteration | Signed-off | 09/30/2021 | 10/04/2021 | Design HEITLER HOUSTOUN ARCHITECTS Owner SAMSUNG 837 Contractor SPRICE CONTRACTING INC Filer PWF | INTERIOR ALTERATIONS OF EXISTING COMMERCIAL OFFICE SPACE TO INCLUDE PARTITION, DOOR AND FINISH WORK AS PER PLANS SUBMITTED HEREWITH. NO CHAN… |
| M00554036 ↗ | 678 BROADWAY MANHATTAN | Alteration | Signed-off | 08/05/2021 | 09/09/2021 | Design EP ENGINEERING LLC Contractor ARANDA PLBG & HTG CORP Filer PWF | MODIFICATIONS TO EXISTING PLUMBING SYSTEMS TO INCLUDE PLUMBING FIXTURE INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLIC… |
| M00535318 ↗ | 90 WEST STREET MANHATTAN | Alteration | Signed-off | 06/29/2021 | 09/01/2021 | Design EP ENGINEERING LLC Owner The Kibel Companies, LLC Contractor ARANDA PLBG & HTG CORP Filer PWF | MODIFICATIONS TO EXISTING PLUMBING SYSTEMS IN GROUND FLOOR COMMERCIAL SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR … |
| M00554019 ↗ | 678 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 08/05/2021 | — | Design EP ENGINEERING LLC Filer PWF | — |
| M00564203 ↗ | 336 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 07/27/2021 | — | Design ESNYC CONSULTING INC Filer PWF | — |
| B00543747 ↗ | 2815 CHURCH AVE BROOKLYN | Alteration | Signed-off | 06/21/2021 | 07/23/2021 | Design EP ENGINEERING LLC Contractor DK CONSTRUCTION ONE, CORP Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EG… |
| M00535920 ↗ | 90 WEST STREET MANHATTAN | Alteration | Permit Issued | 07/06/2021 | 07/23/2021 | Design EP ENGINEERING LLC Owner The Kibel Companies, LLC Contractor NU-WAY HEATING & COOLING Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN GROUND FLOOR COMMERCIAL SPACE TO INCLUDE HVAC REPLACEMENT AND ASSOCIATED DUCT WORK AS PER PL… |
| M00535361 ↗ | 90 WEST STREET MANHATTAN | Alteration | Permit Issued | 07/06/2021 | 07/22/2021 | Design EP ENGINEERING LLC Owner The Kibel Companies, LLC Contractor CITYWIDE PLBG, HTG &SPRKL Filer PWF | MODIFICATION TO EXISTING SPRINKLER SYSTEM IN GROUND FLOOR COMMERCIAL SPACE TO INCLUDE RELOCATION AND INSTALLATION OF SPRINKLER HEADS AND ASS… |
| B00543764 ↗ | 2815 CHURCH AVE BROOKLYN | Alteration | Signed-off | 06/21/2021 | 07/14/2021 | Design EP ENGINEERING LLC Contractor P.S.I. MECHANICAL Filer PWF | MODIFICATIONS TO EXISTING PLUMBING SYSTEM TO INCLUDE FIXTURE AND PLUMBING LINE INSTALLATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO US… |
| M00553068 ↗ | 426 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 07/07/2021 | 07/08/2021 | Design EP ENGINEERING LLC Contractor DK CONSTRUCTION ONE, CORP Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC WORK IN EXISTING GROUND FLOOR COMMERCIAL SPACE AS PER PLANS SUBMITTED HEREWITH.… |
| M00548994 ↗ | 159 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 06/29/2021 | 07/01/2021 | Design EP ENGINEERING LLC Contractor AIK RENOVATION INC Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE INSTALLATION OF HVAC UNITS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPA… |
| M00543792 ↗ | 237 EAST 34 STREET MANHATTAN | Alteration | Permit Issued | 06/21/2021 | 06/22/2021 | Design EP ENGINEERING LLC Contractor DK CONSTRUCTION ONE, CORP Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE HVAC INSTALLATION AS PER PLANS SUBMITTED H… |
| M00537629 ↗ | 515 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 06/14/2021 | 06/14/2021 | Design EP ENGINEERING LLC Contractor DK CONSTRUCTION ONE, CORP Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN GROUND FLOOR COMMERCIAL SPACE TO INCLUDE HVAC WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANG… |
| M00537689 ↗ | WEST 133 STREET MANHATTAN | Alteration | Signed-off | 06/11/2021 | 06/14/2021 | Design EP ENGINEERING LLC Contractor AIK RENOVATION INC | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC WORK AND ASSOCIATED DUCT WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE… |
| B00529945 ↗ | 309 GRAND STREET BROOKLYN | Alteration | Signed-off | 05/27/2021 | 06/10/2021 | Design EP ENGINEERING LLC Contractor P.S.I. MECHANICAL Filer PWF | MODIFICATIONS TO EXISTING PLUMBING SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| B00529916 ↗ | 309 GRAND STREET BROOKLYN | Alteration | Signed-off | 05/27/2021 | 06/03/2021 | Design EP ENGINEERING LLC Contractor DK CONSTRUCTION ONE, CORP Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC UNITS AND ASSOCIATED DUCT WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THI… |
| M00459570 ↗ | 613 WEST 155 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2021 | 03/02/2021 | Design EP ENGINEERING LLC Contractor WOLF CONSTRUCTION CORP 20 Filer PWF | FILING HEREWITH MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE,… |
| M00433057 ↗ | 15 WEST 63 STREET MANHATTAN | Alteration | Permit Issued | 01/27/2021 | 02/08/2021 | Contractor POWER COOLING INC | Replace existing HVAC on roof and all related ductwork/piping on 11-40 floors as per plans. No change in use, egress, or occupancy. |
| M00461257 ↗ | 90 BROAD STREET MANHATTAN | Alteration | Signed-off | 01/28/2021 | 01/31/2021 | Design EP ENGINEERING LLC Owner BROAD STREET PLAZA LLC Contractor ENOBRAC PLUMBING, INC Filer RIZZO GROUP | Standpipe modifications to include valve removal as per plans filed herewith. No change in use, egress or occupancy. |
| B00248463 ↗ | 314 SCHOLES STREET BROOKLYN | Alteration | Signed-off | 10/22/2019 | 12/18/2019 | Design EP ENGINEERING LLC Contractor LYTER GROUP INC | Mechanical work to include ventilation work only. No change to use, egress or occupancy. |
| M00223694 ↗ | 590 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/15/2019 | 11/20/2019 | Design EP ENGINEERING LLC Contractor P & D MECHANICAL CORP | SPRINKLER MODIFICATIONS TO COMPLY WITH LOCAL LAW 26 OF 2004. WORK TO INCLUDE RELOCATION OF EXISTING HEADS AND INSTALLATIONS OF NEW PIPING … |
| Building | Filings | Most Recent |
|---|---|---|
| 109 STATE STREET ↗ | 2 | 04/11/2025 |
| 100 5 AVENUE ↗ | 4 | 03/02/2023 |
| 25 WEST 39 STREET ↗ | 1 | 11/21/2022 |
| 837 WASHINGTON STREET ↗ | 1 | 09/30/2021 |
| 547 WEST 27 STREET ↗ | 1 | 09/20/2021 |
| 2815 CHURCH AVE ↗ | 5 | 09/07/2021 |
| 7 WEST 22 STREET ↗ | 1 | 09/01/2021 |
| 678 BROADWAY ↗ | 2 | 08/05/2021 |
| 90 WEST STREET ↗ | 6 | 08/05/2021 |
| 336 BROADWAY ↗ | 1 | 07/27/2021 |
| 159 EAST 125 STREET ↗ | 2 | 07/19/2021 |
| 426 EAST 14 STREET ↗ | 1 | 07/07/2021 |
| 240 EAST 10 STREET ↗ | 2 | 07/07/2021 |
| 237 EAST 34 STREET ↗ | 1 | 06/21/2021 |
| WEST 133 STREET ↗ | 2 | 06/17/2021 |
| 515 GREENWICH STREET ↗ | 1 | 06/14/2021 |
| 309 GRAND STREET ↗ | 2 | 05/27/2021 |
| 45 MAIN STREET ↗ | 2 | 04/12/2021 |
| 613 WEST 155 STREET ↗ | 1 | 03/02/2021 |
| 90 BROAD STREET ↗ | 1 | 01/28/2021 |
| 15 WEST 63 STREET ↗ | 1 | 01/27/2021 |
| 590 5 AVENUE ↗ | 2 | 07/07/2020 |
| 314 SCHOLES STREET ↗ | 2 | 01/10/2020 |
| 136 WEST 21 STREET ↗ | 1 | 08/01/2019 |
| 132 WEST 21 STREET ↗ | 1 | 08/01/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 03/06/2023 | Fire-Resistant Penetrations and Joints | 100 5 AVENUE | EVAN PARGANOS | special |
| 03/06/2023 | Sprinkler Systems | 100 5 AVENUE | EVAN PARGANOS | special |
| 03/06/2023 | Post-installed Anchors | 100 5 AVENUE | EVAN PARGANOS | special |
| 11/15/2022 | Sprinkler Systems | 100 5 AVENUE | EVAN PARGANOS | special |
| 11/15/2022 | Fire-Resistant Penetrations and Joints | 100 5 AVENUE | EVAN PARGANOS | special |
| 11/15/2022 | Post-installed Anchors | 100 5 AVENUE | EVAN PARGANOS | special |
| 12/08/2021 | Fire-Resistant Penetrations and Joints | 109 STATE STREET | EVAN PARGANOS | special |
| 12/08/2021 | Heating Systems | 109 STATE STREET | EVAN PARGANOS | special |
| 12/08/2021 | Mechanical Systems | 109 STATE STREET | EVAN PARGANOS | special |
| 12/08/2021 | Final | 109 STATE STREET | EVAN PARGANOS | progress |
| 10/26/2021 | Shutoff dampers | 100 5 AVENUE | EVAN PARGANOS | energy_progress |
| 10/26/2021 | Final | 100 5 AVENUE | EVAN PARGANOS | progress |
| 10/26/2021 | Fire-Resistant Penetrations and Joints | 100 5 AVENUE | EVAN PARGANOS | special |
| 10/26/2021 | HVAC-R and service water heating equipment | 100 5 AVENUE | EVAN PARGANOS | energy_progress |
| 10/26/2021 | Duct leakage testing, insulation and design | 100 5 AVENUE | EVAN PARGANOS | energy_progress |
| 10/26/2021 | Maintenance information | 100 5 AVENUE | EVAN PARGANOS | energy_progress |
| 10/26/2021 | HVAC-R and service water piping design and insulation | 100 5 AVENUE | EVAN PARGANOS | energy_progress |
| 10/26/2021 | HVAC-R and service water heating system controls | 100 5 AVENUE | EVAN PARGANOS | energy_progress |
| 10/26/2021 | Post-installed Anchors | 100 5 AVENUE | EVAN PARGANOS | special |
| 10/26/2021 | Mechanical Systems | 100 5 AVENUE | EVAN PARGANOS | special |
| 10/26/2021 | Fire-Resistant Penetrations and Joints | 100 5 AVENUE | EVAN PARGANOS | special |
| 10/26/2021 | Post-installed Anchors | 100 5 AVENUE | EVAN PARGANOS | special |
| 09/22/2021 | Fire-Resistant Penetrations and Joints | 837 WASHINGTON STREET | EVAN PARGANOS | special |
| 09/22/2021 | Interior lighting power | 837 WASHINGTON STREET | EVAN PARGANOS | energy_progress |
| 09/22/2021 | Lighting controls | 837 WASHINGTON STREET | EVAN PARGANOS | energy_progress |
| 09/22/2021 | Final | 837 WASHINGTON STREET | Josh Heitler | progress |
| 09/17/2021 | Post-installed Anchors | 547 WEST 27 STREET | EVAN PARGANOS | special |
| 09/17/2021 | HVAC-R and service water heating system controls | 547 WEST 27 STREET | EVAN PARGANOS | energy_progress |
| 09/17/2021 | Maintenance information | 547 WEST 27 STREET | EVAN PARGANOS | energy_progress |
| 09/17/2021 | HVAC-R and service water piping design and insulation | 547 WEST 27 STREET | EVAN PARGANOS | energy_progress |
| 09/17/2021 | HVAC-R and service water heating equipment | 547 WEST 27 STREET | EVAN PARGANOS | energy_progress |
| 09/17/2021 | Duct leakage testing, insulation and design | 547 WEST 27 STREET | EVAN PARGANOS | energy_progress |
| 09/09/2021 | Fire-Resistant Penetrations and Joints | 2815 CHURCH AVE | EVAN PARGANOS | special |
| 09/09/2021 | Final | 2815 CHURCH AVE | EVAN PARGANOS | progress |
| 09/09/2021 | Shutoff dampers | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/09/2021 | HVAC-R and service water heating equipment | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/09/2021 | HVAC-R and service water heating system controls | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/09/2021 | Duct leakage testing, insulation and design | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/09/2021 | Maintenance information | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/09/2021 | HVAC-R and service water piping design and insulation | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/09/2021 | Mechanical Systems | 2815 CHURCH AVE | EVAN PARGANOS | special |
| 09/09/2021 | Post-installed Anchors | 2815 CHURCH AVE | EVAN PARGANOS | special |
| 09/07/2021 | Fire-Resistant Penetrations and Joints | 2815 CHURCH AVE | EVAN PARGANOS | special |
| 09/07/2021 | Mechanical Systems | 2815 CHURCH AVE | EVAN PARGANOS | special |
| 09/07/2021 | Post-installed Anchors | 2815 CHURCH AVE | EVAN PARGANOS | special |
| 09/07/2021 | Final | 2815 CHURCH AVE | EVAN PARGANOS | progress |
| 09/07/2021 | HVAC-R and service water piping design and insulation | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/07/2021 | Duct leakage testing, insulation and design | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/07/2021 | Shutoff dampers | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |
| 09/07/2021 | Maintenance information | 2815 CHURCH AVE | EVAN PARGANOS | energy_progress |