← Back
BuildNYC
Church, synagogue, chapel
615 REISS PLACE
BRONX · BIN 2049730
💬 Discuss this project
1930Year Built
2Stories
M1Building Class
R7-1Zoning
16,000 sfGross Floor Area
1Units
0 Active Violations
Church, synagogue, chapel · 11,900 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Sidewalk bridges, barriers, and signage installation4p · 1 filing · 2 docs
Site & exteriorGhana United Methodist Church4p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ghana United Methodist Church2804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jim Kusi PE406/02/2026
Okg Engineers202/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Monica Santos Exp203/21/2026
Dockery Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Adnet EnterprisesGeneral Contractor207/08/2026
Harari DavidElectrical103/21/2026
Bobtek ElectricalElectrical103/21/2026
Omd ElectricalElectrical103/21/2026
Neptune Signs & AwningsSign hanger106/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Okg Engineers7791102/28/2026
Building Lifecycle
All (39)Filed (6)Permit Issued (3)Signed Off (3)Violation (22)Objection (2)Special Inspection (3)
06/08/2026
Signed off — Alteration
INSTALLATION OF ONE ILLUMINATED WALL HUNG SIGN, ADD DISCONNECT SWITCH, DRAINS AND MANUFACTURER INFORMATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01242079-I1
06/04/2026
Special inspection requirement — Final
Jim Kusi
06/02/2026
Filed — Alteration
INSTALLATION OF ONE ILLUMINATED WALL HUNG SIGN, ADD DISCONNECT SWITCH, DRAINS AND MANUFACTURER INFORMATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01242079-P3
06/02/2026
Special inspection requirement — Final
Jim Kusi
03/27/2026
Signed off — Alteration
X01363985-I1
03/13/2026
Permit issued — General Construction
X01363985-I1-GC
02/28/2026
Filed — Alteration
X01363985-I1
02/26/2026
Filed — Alteration
INSTALLATION OF ONE ILLUMINATED WALL HUNG SIGN, ADD DISCONNECT SWITCH, DRAINS AND MANUFACTURER INFORMATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01242079-P2
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2025
Permit issued — Sign
X01242079-I1-SG
07/30/2025
Filed — Alteration
INSTALLATION OF ONE ILLUMINATED WALL HUNG SIGN, ADD DISCONNECT SWITCH, DRAINS AND MANUFACTURER INFORMATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01242079-P1
07/29/2025
Special inspection requirement — Final
Jim Kusi
06/18/2025
Filed — Alteration
INSTALLATION OF ONE ILLUMINATED WALL HUNG SIGN, ADD DISCONNECT SWITCH, DRAINS AND MANUFACTURER INFORMATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01242079-I1
05/02/2025
Signed off — Alteration
Replacement of Existing Curb Cut
X00294792-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/31/2020
Permit issued — Curb Cut
X00294792-I1-CC
02/05/2020
Objection raised — Scope
02/05/2020
Objection resolved — Addressed
02/03/2020
Filed — Alteration
Replacement of Existing Curb Cut
X00294792-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2010
Violation issued (ECB, closed)
Elevators
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAdnet Enterprises03/13/2026
DOB NOWSignSigned-offNeptune Signs & Awnings08/07/2025
DOB NOWCurb CutSigned-offAdnet Enterprises08/31/2020
BIS—ISSUEDAdnet Enterprises03/13/2026
BIS—ISSUEDAdnet Enterprises03/29/2025
BIS—ISSUEDAdnet Enterprises02/14/2024
BIS—ISSUEDAdnet Enterprises08/07/2023
BIS—ISSUEDAdnet Enterprises04/13/2021
BIS—ISSUEDAdnet Enterprises02/05/2020
BIS—ISSUEDAdnet Enterprises07/27/2018
BIS—ISSUEDAdnet Enterprises12/08/2016
BISEQISSUEDAdnet Enterprises11/22/2016
BISOTISSUEDAdnet Enterprises11/22/2016
BISPLISSUEDC James Plumbing & Heating05/27/2016
BIS—ISSUEDAdnet Enterprises11/13/2015
BISSPISSUEDC. James Plumbing & Heating11/21/2014
BIS—ISSUEDExcel Builders & Renovato02/06/2014
BISOTISSUEDEmpire Gen Construction U07/17/2013
BIS—ISSUEDExcel Builders & Renovato03/04/2013
BIS—ISSUEDAdnet Enterprises04/06/2011
BIS—ISSUEDAdnet Enterprises03/04/2010
BIS—ISSUEDAdnet Enterprises04/09/2009
BIS—ISSUEDAdnet Enterprises06/02/2008
BIS—ISSUEDAdnet Enterprises06/08/2007
BISPLISSUEDA & A Plumbing Systems04/04/2007
BIS—ISSUEDAdnet Enterprises05/10/2006
BIS—ISSUEDAdnet Enterprises12/27/2005
2 projects · most recent 04/27/2026
General Wiring Lighting
FiledStatusContractorScope
04/27/2026CompleteOmd ElectricalGeneral Wiring
04/26/2026Permit IssuedOmd ElectricalLighting
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/04/2026FinalJim Kusiprogress
06/02/2026FinalJim Kusiprogress
07/29/2025FinalJim Kusiprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ghana United Methodist ChurchReligious—
Project X01363985 Alteration · LOC Issued · 02/28/2026
Project X01242079 Alteration · LOC Issued · 06/18/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/17/2026X01363985-I1Request digital key ↗
08/16/2026X01242079-P1Request digital key ↗
08/16/2026X01242079-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026X00294792-I1Request digital key ↗
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION18
05/19/2025200899251Open ↗
05/05/2025200933892Open ↗
04/11/2025220477062Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION9
06/06/2025220477062Open ↗
08/14/2023200933892Open ↗
11/07/2018200933892Open ↗
Showing 3 of 9 on file for this type
▸BISPLACE OF ASSEMBLY8
02/08/2016220483206Open ↗
02/08/2016220483180Open ↗
02/08/2016220483199Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/12/2019220560417Open ↗
10/15/2018220560417Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/14/2024200933892Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/21/2024220560426Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
02/17/2024200933892Open ↗
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/11/2020220553719Open ↗
11/14/2016220553719Open ↗
11/13/2015220483199Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026X00294792-I1Open ↗
08/17/2026X01363985-I1Open ↗
08/16/2026X01242079-P3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/14/2016220553719Open ↗
10/09/2014220409225Open ↗
07/17/2013240030729Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/14/2016220553719Open ↗
10/09/2014220409225Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X01242079-I1Open ↗
08/26/2026X01242079-P3Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/17/2013240030729Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/17/2013240030729Open ↗
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE PERMITS4
07/29/2019200933892Open ↗
07/29/2019200933892Open ↗
07/29/2019200933892Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/06/2019200933892Open ↗
01/20/2016200933892Open ↗
10/09/2014220409225Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
07/29/2019200933892Open ↗
07/29/2019200933892Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/23/2015220409225Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
02/23/2015220409225Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/11/2025220477062Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE SIGNOFF1
02/13/2025220560417Open ↗
▸BISSTREET TREE CHECKLIST1
10/15/2018220560417Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/17/2013240030729Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/26/2020220553719Open ↗
02/11/2020220553719Open ↗
11/14/2016220553719Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/17/2013240030729Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/11/2020220553719Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/17/2013240030729Open ↗
▸Inspections & Test Reports3
▸BIS* TR3 PRIOR TO SIGNOFF1
11/22/2021200933892Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/06/2025220477062Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/17/2013240030729Open ↗
▸Approvals, Objections & Sign-offs28
▸BISLETTERS - SUPPORTING DOCUMENTATION9
06/13/2025220477062Open ↗
03/04/2025220477062Open ↗
02/11/2020220553719Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
06/13/2025220477062Open ↗
02/26/2020220553719Open ↗
02/12/2020200933892Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/17/2026X01363985-I1Open ↗
08/16/2026X01242079-P3Open ↗
08/13/2026X00294792-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/05/2025200933892Open ↗
07/16/2024200933892Open ↗
01/20/2016200933892Open ↗
▸BISFEE DEFERRAL LETTER1
08/14/2023200933892Open ↗
▸BISFINAL1
06/09/2025220477062Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT6
02/27/2020200933892Open ↗
02/11/2020220553719Open ↗
04/12/2017220409225Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/14/2023200933892Open ↗
07/27/2018200933892Open ↗
12/09/2016200933892Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION1
02/17/2024220560417Open ↗
▸BISINSURANCE: DISABILITY1
02/17/2024220560417Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/17/2024200933892Open ↗
▸BISINSURANCE: LIABILITY1
02/17/2024220560417Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET5
11/18/2016220560417Open ↗
11/18/2016220560426Open ↗
11/14/2016220553719Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
03/04/2025220477062Open ↗
02/12/2020200933892Open ↗
04/12/2019200933892Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
10/15/2018220560417Open ↗
11/22/2016220560417Open ↗
▸BISBOROUGH INTAKE FORM2
02/26/2020220553719Open ↗
02/11/2020220553719Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/17/2013240030729Open ↗