1961Year Built
4Stories
O9Building Class
M2-4Zoning
21,600 sfGross Floor Area
3Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Miscellaneous and old-style bank buildings · Owner of record: GLP Newco Fund Investor · 9,725 sf lot · 2.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsInsite Property Group2 filings
RoofInsite Property Group2p · 3 filings
BulkheadSuspended scaffold and material hoist installation1p · 1 filing
Floor 10Suspended scaffold and material hoist installation2p · 2 filings
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41 filing
Floor 31p · 1 filing
Floor 2
Floor 1Securespace Self Storage illuminated signUnder Construction4 filings
Site & exteriorInsite Property GroupUnder Construction7 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Insite Property Group6309/13/2026
EKM Construction604/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates1403/21/2026
DVA Advisors803/21/2026
A1 Expediting Service1603/21/2026
West Aze1003/21/2026
Lombardo Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pbbrown NYCGeneral Contractor1107/08/2026
S&E Bridge & ScaffoldScaffold1107/08/2026
N.Y. Sign ArtSign hanger507/08/2026
Casino Plumbing & HeatingFire Protection307/08/2026
Hexagon GroupScaffold304/09/2026
Accord PowerGeneral Contractor304/09/2026
I.M.P. Plumbing & HeatingPlumbing207/03/2026
Moore GroupScaffold104/09/2026
Nash Electric ServicesElectrical103/22/2026
Denali ElectricElectrical103/22/2026
Pbbrown NYCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlas ATC Engineering80112106/10/2026
Leo Y Lee Associates2481304/15/2026
Synergic Design8561112/19/2025
Ancora Engineering6818503/03/2025
Building Lifecycle
All (246)Filed (45)Permit Issued (39)Signed Off (22)Violation (27)Inspection (13)Objection (70)Special Inspection (30)
08/31/2026
Signed off — Alteration
Installation of construction fence filed in conjunction to New Building app #M00741415-I1.
M01119540-I1
08/28/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S8
08/28/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S9
08/25/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S6
08/07/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/29/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S2
07/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/28/2026
Signed off — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 150 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01260197-I1
07/28/2026
Signed off — Alteration
EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPLICATION SUBMITTED SEPARATELY
M01218477-I1
07/28/2026
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON SIDEWALK/ROADWAY. DOT PERMITS BY OTHERS.
M01218462-I1
07/28/2026
Signed off — Alteration
TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTIES DURING NB, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01218475-I1
07/28/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01218461-I1
07/24/2026
Violation issued (ECB, open)
Unknown
07/15/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/07/2026
Signed off — Alteration
Installation and use of temporary side wall bracket filed herein. No change in egress, use, and occupancy.
M01210307-I1
07/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S5
06/25/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-Z5
06/25/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S4
06/25/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-Z1
06/15/2026
Signed off — Alteration
Installation of 14.96 kw solar energy system on roof. No change of occupancy, use or egress.
M01329713-I1
06/12/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/10/2026
Filed — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-A6
06/10/2026
Permit issued — Curb Cut
M00741415-S9-CC
06/10/2026
Permit issued — Curb Cut
M00741415-S8-CC
06/09/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S7
06/09/2026
Signed off — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-S1
06/09/2026
Special inspection requirement — Final
Jorge Santos
06/09/2026
Special inspection requirement — Concrete - Cast-In-Place
RONALD GRAPIN
06/02/2026
Signed off — Alteration
Installation of swing stage suspended scaffold and installation of material hoist suspended from outrigger beam as per plan and in accordance with Chapter 33 of NYC 2022 Building Code. No change in use, egress, or occupancy.
M01262577-I1
06/01/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
RONALD GRAPIN
05/15/2026
Filed — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-A5
05/14/2026
Permit issued — Boiler Equipment
M00741415-Z5-BE
05/14/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
RONALD GRAPIN
05/03/2026
Special inspection requirement — Fenestration air leakage
RONALD GRAPIN
05/03/2026
Special inspection requirement — Air barrier - visual inspection
RONALD GRAPIN
05/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RONALD GRAPIN
05/03/2026
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
05/03/2026
Special inspection requirement — Luminous Exit Path Markings
RONALD GRAPIN
05/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
05/03/2026
Special inspection requirement — Fenestration areas
RONALD GRAPIN
05/03/2026
Special inspection requirement — Protection of exposed foundation insulation
RONALD GRAPIN
05/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
05/03/2026
Special inspection requirement — Air barrier continuity plan testing
RONALD GRAPIN
05/03/2026
Special inspection requirement — Insulation placement and R values
RONALD GRAPIN
05/03/2026
Special inspection requirement — Vestibules
RONALD GRAPIN
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
04/24/2026
Special inspection requirement — Standpipe Systems
RONALD GRAPIN
04/24/2026
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
04/21/2026
Objection resolved — Resolved
04/17/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
04/15/2026
Filed — Alteration
Installation of swing stage suspended scaffold and installation of material hoist suspended from outrigger beam as per plan and in accordance with Chapter 33 of NYC 2022 Building Code. No change in use, egress, or occupancy.
M01262577-P2
04/13/2026
Filed — New Building
Installation of Fuel Storage tanks for a diesel-based emergency generator.
M00741415-A4
04/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
04/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
04/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
04/12/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
RONALD GRAPIN
04/11/2026
Violation issued (ECB, closed)
Construction
04/11/2026
Violation issued (ECB, closed)
Plumbing
04/11/2026
Violation issued (ECB, closed)
Unknown
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPbbrown NYC06/10/2026
DOB NOWCurb CutSigned-offPbbrown NYC06/10/2026
DOB NOWBoiler EquipmentSigned-offRanshaw Plumbing & Heating05/14/2026
DOB NOWStandpipeSigned-offCasino Plumbing & Heating03/11/2026
DOB NOWSolarSigned-offAccord Power03/03/2026
DOB NOWSignPermit IssuedSkanska Building02/20/2026
DOB NOWSignPermit IssuedSkanska Building02/20/2026
DOB NOWSignPermit IssuedSkanska Building02/20/2026
DOB NOWSignPermit IssuedSkanska Building02/20/2026
DOB NOWSignPermit IssuedSkanska Building02/20/2026
DOB NOWBoiler EquipmentSigned-offRanshaw Plumbing & Heating02/17/2026
DOB NOWSuspended ScaffoldSigned-offHexagon Group02/10/2026
DOB NOWPlumbingSigned-offI.M.P. Plumbing & Heating02/05/2026
DOB NOWSolarSigned-offAccord Power01/22/2026
DOB NOWStandpipeSigned-offCasino Plumbing & Heating12/18/2025
DOB NOWSprinklersSigned-offCasino Plumbing & Heating12/17/2025
DOB NOWGeneral ConstructionPermit IssuedPbbrown NYC10/20/2025
DOB NOWMechanical SystemsSigned-offPbbrown NYC10/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWSidewalk ShedSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWSuspended ScaffoldSigned-offHexagon Group09/05/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold07/23/2025
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold07/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold07/10/2025
DOB NOWStructuralSigned-offPbbrown NYC06/23/2025
DOB NOWSidewalk ShedSigned-offS&E Bridge & Scaffold06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offMoore Group05/28/2025
DOB NOWGeneral ConstructionPermit IssuedPbbrown NYC05/15/2025
DOB NOWFoundationSigned-offPbbrown NYC02/24/2025
DOB NOWFoundationSigned-offPbbrown NYC02/12/2025
DOB NOWPlumbingSigned-offI.M.P. Plumbing & Heating01/29/2025
DOB NOWStructuralSigned-offPbbrown NYC01/08/2025
DOB NOWGeneral ConstructionPermit IssuedPbbrown NYC11/21/2024
DOB NOWConstruction FenceSigned-offPbbrown NYC11/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold01/17/2024
BISPLISSUEDAqueduct Plumbing & Mechanical04/20/2015
+ 4 more permits on file
1 project · most recent 06/10/2026
Air Conditioning Systems Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2026Signed-offPbbrown NYCAir Conditioning Systems, Generators, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Aaon RNA006AA8GJA0AA04NB 1,560 CFM · Rooftop Unit ×2
Samsung AC024BNADCH/AA 24,000 BTU · Vrf Indoor ×3
York PHE4A2424A 800 CFM · Heat Pump Outdoor ×2
Heat / Cool
Samsung AM192BXVGFH/AA 192,000 BTU · Vrf Outdoor ×9
AM120BXVGFH/AA 120,000 BTU · Vrf Outdoor ×6
AM012NN4DCH/AA 12,000 BTU · Vrf Indoor ×3
AM012TNVDCH/AA 12,000 BTU · Vrf Indoor ×3
AM018NN4DCH/AA 18,000 BTU · Vrf Indoor ×3
AM030FNLDCH/AA 30,000 BTU · Vrf Indoor ×3
AM168BXVGFH/AA 168,000 BTU · Vrf Outdoor ×3
AC024BXSCCC/AA 24,000 BTU · Vrf Indoor ×1
Durastar DRA1U24S2A 24,000 BTU · Condensing Unit ×2
Mitsubishi Electric PKFY-P24NKMU-E 24,000 BTU · Vrf Indoor ×3
Greenheck RV-25-5A-1-E1 88,500 BTU · Makeup Air ×1
Ventilation
Renewaire EV 450IN 200 CFM · Erv ×3
EV PREMIUM S 70 CFM · Erv ×3
Generators
Generac SD300 300 kW · Generator ×3
1 project · most recent 06/10/2026
Sprinkler System
FiledStatusContractorScope
06/10/2026Signed-offCasino Plumbing & HeatingSprinkler System
1 project · most recent 06/10/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/10/2026Signed-offI.M.P. Plumbing & HeatingStorm, Water/Sanitary
7 projects · most recent 09/24/2026
General Wiring
FiledStatusContractorScope
09/24/2026Permit IssuedSpectrum on Broadway-Electric—
08/12/2026CompleteElectric EssentialsGeneral Wiring
12/11/2025CompleteAccord Power Electric—
08/13/2025CompleteElectric Essentials—
08/02/2025CompleteDenali Electric—
07/30/2025CompleteNash Electric Services—
06/17/2025CompleteNash Electric Services—
1 project · most recent 06/10/2026
Concrete
FiledStatusContractorScope
06/10/2026Signed-offPbbrown NYCConcrete
1 project · most recent 12/19/2025
FiledStatusContractorScope
12/19/2025Signed-offAccord Power68 panels, 29.92 kw, 6,277.28 roof_area_sqft
1 project · most recent 04/15/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/15/2026Signed-offHexagon GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/07/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
07/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2026Pass-Final Boiler Equipment InspectionPassView ↗
04/07/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/29/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
10/01/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/21/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/09/2026Concrete - Cast-In-PlaceRONALD GRAPINspecial
06/09/2026FinalJorge Santosprogress
06/01/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsRONALD GRAPINspecial
05/14/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsRONALD GRAPINspecial
05/03/2026Fire-Resistance Rated ConstructionRONALD GRAPINprogress
05/03/2026Fenestration air leakageRONALD GRAPINenergy_progress
05/03/2026Protection of exposed foundation insulationRONALD GRAPINenergy_progress
05/03/2026Air barrier - visual inspectionRONALD GRAPINenergy_progress
05/03/2026Air barrier continuity plan testingRONALD GRAPINenergy_progress
05/03/2026Fenestration areasRONALD GRAPINenergy_progress
05/03/2026VestibulesRONALD GRAPINenergy_progress
05/03/2026Fenestration and door U-factor and product ratingsRONALD GRAPINenergy_progress
05/03/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
05/03/2026Luminous Exit Path MarkingsRONALD GRAPINspecial
05/03/2026Energy Code Compliance InspectionsRONALD GRAPINprogress
05/03/2026Insulation placement and R valuesRONALD GRAPINenergy_progress
04/24/2026Sprinkler SystemsRONALD GRAPINspecial
04/24/2026Standpipe SystemsRONALD GRAPINspecial
04/24/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
04/17/2026Post-installed AnchorsLeo Leespecial
04/12/2026HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
04/12/2026HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
04/12/2026HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
04/12/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsRONALD GRAPINspecial
03/25/2026HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
Latest 25 of 150.
▾Documents — 368 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch42
08/28/2026M00985602-I1Request digital key ↗
08/23/2026M01210307-I1Request digital key ↗
08/23/2026M01218461-P1Request digital key ↗
Showing 3 of 42 on file for this type
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION23
02/06/2026122273994Open ↗
01/27/2026122455388Open ↗
01/27/2026141024433Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION5
04/29/2015122273994Open ↗
04/29/2015122273994Open ↗
04/29/2015122273994Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
10/06/2023141022033Open ↗
02/23/2023141022033Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/22/2024141024433Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026M00741415-P1Open ↗
08/17/2026M00741415-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026M00741415-P1Open ↗
08/17/2026M00741415-I1Open ↗
Showing 2 of 3 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION1
04/24/2015122273994Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/26/2023141022033Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications165
▸DOB NOWProgress Inspector Seal & Signature61
10/08/2026M00741415-A3Open ↗
09/18/2026M00741415-I1Open ↗
09/18/2026M00741415-I1Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
08/28/2026M00985602-I1Open ↗
08/26/2026M01119540-I1Open ↗
08/23/2026M01218461-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
10/08/2026M00741415-A3Open ↗
09/18/2026M00741415-I1Open ↗
09/02/2026M00741415-P3Open ↗
Showing 3 of 42 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
12/28/2015122273994Open ↗
12/28/2015122273994Open ↗
12/28/2015122273994Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/21/2023141024433Open ↗
02/22/2023141022033Open ↗
04/15/2015140333226Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/15/2015140333226Open ↗
04/15/2015140333887Open ↗
02/20/2015122273994Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/15/2015140333226Open ↗
04/15/2015140333887Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
09/21/2023141024433Open ↗
02/22/2023141022033Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/20/2015122273994Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/27/2015122273994Open ↗
11/09/2015122273994Open ↗
09/28/2015122273994Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/17/2026M00741415-I1Open ↗
08/17/2026M00741415-P1Open ↗
Showing 2 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
12/22/2015122273994Open ↗
06/04/2015122273994Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026M00741415-I1—
▸Safety & Tenant Protection44
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist35
08/23/2026M01218461-I1Open ↗
08/17/2026M00741415-S9Open ↗
08/17/2026M00741415-Z1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWStreet Tree Checklist3
08/17/2026M00741415-I1Open ↗
08/17/2026M00741415-P1Open ↗
Showing 2 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/20/2015122273994Open ↗
▸BISSTREET TREES SITE PLAN1
08/16/2023141022033Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/06/2023141022033Open ↗
▸BISSTREET TREE CHECKLIST1
10/06/2023141022033Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
09/21/2023141024433Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/22/2016122455388Open ↗
04/15/2015140333887Open ↗
▸Energy Compliance7
▸DOB NOWPreliminary Commissioning Report Certification3
08/17/2026M00741415-Z1Open ↗
08/17/2026M00741415-S4Open ↗
08/17/2026M00741415-S5Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/12/2015122273994Open ↗
02/20/2015122273994Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
05/27/2025141024433Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/21/2023141024433Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/17/2026M00741415-S1Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/21/2023141024433Open ↗
04/15/2015140333226Open ↗
04/15/2015140333887Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/22/2016122455388Open ↗
02/20/2015122273994Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION14
04/30/2024141024433Open ↗
02/22/2024141024433Open ↗
11/16/2023141024433Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/21/2023141024433Open ↗
02/22/2023141022033Open ↗
04/15/2015140333226Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
03/22/2016122455388Open ↗
02/20/2015122273994Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents22
▸DOB NOWMultiple Dwelling Special District Notice to Community Board3
08/17/2026M00741415-A4Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/21/2026M01262577-P2Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWCalculations3
08/21/2026M01262577-P2Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation3
08/17/2026M00741415-A4Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026M00741415-I1Open ↗
08/17/2026M00741415-P1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProperty Ownership Certification3
08/17/2026M00741415-P1Open ↗
08/17/2026M00741415-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWSite Survey: Initial3
08/17/2026M00741415-I1Open ↗
08/17/2026M00741415-P1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type