| Owner | Filings | Most Recent |
|---|---|---|
| Insite Property Group | 63 | 09/13/2026 |
| EKM Construction | 6 | 04/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Halsey McCormack Helmer | 10 | 06/10/2026 |
| Ettinger Engineering Associates | 13 | 05/15/2026 |
| Amm Engineering | 3 | 04/15/2026 |
| Aaxd | 5 | 02/20/2026 |
| Synergic Design Architects | 1 | 12/19/2025 |
| G. Blinn Consulting | 8 | 08/19/2025 |
| Lombardo Professional Engineering | 1 | 05/28/2025 |
| Ancora Engineering | 4 | 01/03/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| William Vitacco Associates | 14 | 03/21/2026 |
| DVA Advisors | 8 | 03/21/2026 |
| A1 Expediting Service | 16 | 03/21/2026 |
| West Aze | 10 | 03/21/2026 |
| Lombardo Building Consultants | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Pbbrown NYC | General Contractor | 11 | 07/08/2026 |
| S&E Bridge & Scaffold | Scaffold | 11 | 07/08/2026 |
| N.Y. Sign Art | Sign hanger | 5 | 07/08/2026 |
| Casino Plumbing & Heating | Fire Protection | 3 | 07/08/2026 |
| Hexagon Group | Scaffold | 3 | 04/09/2026 |
| Accord Power | General Contractor | 3 | 04/09/2026 |
| I.M.P. Plumbing & Heating | Plumbing | 2 | 07/03/2026 |
| Moore Group | Scaffold | 1 | 04/09/2026 |
| Nash Electric Services | Electrical | 1 | 03/22/2026 |
| Denali Electric | Electrical | 1 | 03/22/2026 |
| Pbbrown NYC | Scaffold | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Atlas ATC Engineering | 8011 | 21 | 06/10/2026 |
| Leo Y Lee Associates | 2481 | 3 | 04/15/2026 |
| Synergic Design | 8561 | 1 | 12/19/2025 |
| Ancora Engineering | 6818 | 5 | 03/03/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | Pbbrown NYC | 06/10/2026 |
| DOB NOW | Curb Cut | Signed-off | Pbbrown NYC | 06/10/2026 |
| DOB NOW | Boiler Equipment | Signed-off | Ranshaw Plumbing & Heating | 05/14/2026 |
| DOB NOW | Standpipe | Signed-off | Casino Plumbing & Heating | 03/11/2026 |
| DOB NOW | Solar | Signed-off | Accord Power | 03/03/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 02/20/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 02/20/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 02/20/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 02/20/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 02/20/2026 |
| DOB NOW | Boiler Equipment | Signed-off | Ranshaw Plumbing & Heating | 02/17/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | Hexagon Group | 02/10/2026 |
| DOB NOW | Plumbing | Signed-off | I.M.P. Plumbing & Heating | 02/05/2026 |
| DOB NOW | Solar | Signed-off | Accord Power | 01/22/2026 |
| DOB NOW | Standpipe | Signed-off | Casino Plumbing & Heating | 12/18/2025 |
| DOB NOW | Sprinklers | Signed-off | Casino Plumbing & Heating | 12/17/2025 |
| DOB NOW | General Construction | Permit Issued | Pbbrown NYC | 10/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Pbbrown NYC | 10/20/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 09/29/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E Bridge & Scaffold | 09/29/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 09/29/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 09/29/2025 |
| DOB NOW | Construction Fence | Signed-off | S&E Bridge & Scaffold | 09/29/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Hexagon Group | 09/05/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 07/23/2025 |
| DOB NOW | Construction Fence | Signed-off | S&E Bridge & Scaffold | 07/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 07/10/2025 |
| DOB NOW | Structural | Signed-off | Pbbrown NYC | 06/23/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E Bridge & Scaffold | 06/17/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 06/17/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Moore Group | 05/28/2025 |
| DOB NOW | General Construction | Permit Issued | Pbbrown NYC | 05/15/2025 |
| DOB NOW | Foundation | Signed-off | Pbbrown NYC | 02/24/2025 |
| DOB NOW | Foundation | Signed-off | Pbbrown NYC | 02/12/2025 |
| DOB NOW | Plumbing | Signed-off | I.M.P. Plumbing & Heating | 01/29/2025 |
| DOB NOW | Structural | Signed-off | Pbbrown NYC | 01/08/2025 |
| DOB NOW | General Construction | Permit Issued | Pbbrown NYC | 11/21/2024 |
| DOB NOW | Construction Fence | Signed-off | Pbbrown NYC | 11/07/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 01/17/2024 |
| BIS | PL | ISSUED | Aqueduct Plumbing & Mechanical | 04/20/2015 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/10/2026 | Signed-off | Pbbrown NYC | Air Conditioning Systems, Generators, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Aaon RNA006AA8GJA0AA04NB 1,560 CFM · Rooftop Unit ×2 Samsung AC024BNADCH/AA 24,000 BTU · Vrf Indoor ×3 York PHE4A2424A 800 CFM · Heat Pump Outdoor ×2 Heat / Cool Samsung AM192BXVGFH/AA 192,000 BTU · Vrf Outdoor ×9 AM120BXVGFH/AA 120,000 BTU · Vrf Outdoor ×6 AM012NN4DCH/AA 12,000 BTU · Vrf Indoor ×3 AM012TNVDCH/AA 12,000 BTU · Vrf Indoor ×3 AM018NN4DCH/AA 18,000 BTU · Vrf Indoor ×3 AM030FNLDCH/AA 30,000 BTU · Vrf Indoor ×3 AM168BXVGFH/AA 168,000 BTU · Vrf Outdoor ×3 AC024BXSCCC/AA 24,000 BTU · Vrf Indoor ×1 Durastar DRA1U24S2A 24,000 BTU · Condensing Unit ×2 Mitsubishi Electric PKFY-P24NKMU-E 24,000 BTU · Vrf Indoor ×3 Greenheck RV-25-5A-1-E1 88,500 BTU · Makeup Air ×1 Ventilation Generators Generac SD300 300 kW · Generator ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Signed-off | Casino Plumbing & Heating | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Signed-off | I.M.P. Plumbing & Heating | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | Spectrum on Broadway-Electric | — |
| 08/12/2026 | Complete | Electric Essentials | General Wiring |
| 12/11/2025 | Complete | Accord Power Electric | — |
| 08/13/2025 | Complete | Electric Essentials | — |
| 08/02/2025 | Complete | Denali Electric | — |
| 07/30/2025 | Complete | Nash Electric Services | — |
| 06/17/2025 | Complete | Nash Electric Services | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Signed-off | Pbbrown NYC | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/19/2025 | Signed-off | Accord Power | 68 panels, 29.92 kw, 6,277.28 roof_area_sqft |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Signed-off | Hexagon Group | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/07/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 07/29/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/15/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 07/06/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/12/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 04/07/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 10/29/2025 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 10/01/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 08/21/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 08/20/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 06/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/30/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/09/2026 | Concrete - Cast-In-Place | RONALD GRAPIN | special |
| 06/09/2026 | Final | Jorge Santos | progress |
| 06/01/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | RONALD GRAPIN | special |
| 05/14/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | RONALD GRAPIN | special |
| 05/03/2026 | Fire-Resistance Rated Construction | RONALD GRAPIN | progress |
| 05/03/2026 | Fenestration air leakage | RONALD GRAPIN | energy_progress |
| 05/03/2026 | Protection of exposed foundation insulation | RONALD GRAPIN | energy_progress |
| 05/03/2026 | Air barrier - visual inspection | RONALD GRAPIN | energy_progress |
| 05/03/2026 | Air barrier continuity plan testing | RONALD GRAPIN | energy_progress |
| 05/03/2026 | Fenestration areas | RONALD GRAPIN | energy_progress |
| 05/03/2026 | Vestibules | RONALD GRAPIN | energy_progress |
| 05/03/2026 | Fenestration and door U-factor and product ratings | RONALD GRAPIN | energy_progress |
| 05/03/2026 | Fire-Resistant Penetrations and Joints | RONALD GRAPIN | special |
| 05/03/2026 | Luminous Exit Path Markings | RONALD GRAPIN | special |
| 05/03/2026 | Energy Code Compliance Inspections | RONALD GRAPIN | progress |
| 05/03/2026 | Insulation placement and R values | RONALD GRAPIN | energy_progress |
| 04/24/2026 | Sprinkler Systems | RONALD GRAPIN | special |
| 04/24/2026 | Standpipe Systems | RONALD GRAPIN | special |
| 04/24/2026 | Fire-Resistant Penetrations and Joints | RONALD GRAPIN | special |
| 04/17/2026 | Post-installed Anchors | Leo Lee | special |
| 04/12/2026 | HVAC-R and service water heating system controls | RONALD GRAPIN | energy_progress |
| 04/12/2026 | HVAC-R and service water heating equipment | RONALD GRAPIN | energy_progress |
| 04/12/2026 | HVAC-R and service water piping design and insulation | RONALD GRAPIN | energy_progress |
| 04/12/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | RONALD GRAPIN | special |
| 03/25/2026 | HVAC-R and service water heating equipment | RONALD GRAPIN | energy_progress |