Elevator apt, fireproof without stores
Brownsville (NYCHA)
619 ROCKAWAY AVENUE · BIN 3326518
💬 Discuss this project
1975Year Built
6Stories
D3Building Class
R6Zoning
553,197 sfGross Floor Area
720Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 465,500 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3409/13/2026
NYCHA 99103/22/2026
NYC HOUSING AUTHORITY303/22/2026
NYC HOUSING AUTHORITY 9103/22/2026
VIKRANT CONTRACTI&BLD INC103/21/2026
NEW YORK CITY HOUSING AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS105/13/2026
ZIE310/17/2023
JOEL PHAGOO P.E. PLLC307/14/2023
AK CONSULTING SERVICES, INC202/10/2023
IKRA CONSULTING LLC202/02/2023
BITOPI CONSULTANTS LLC101/03/2023
SUPERSTRUCTURES ENG. + ARCH.104/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH103/21/2026
IKRA CONSULTING LLC403/21/2026
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor2107/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor507/08/2026
CHARNJIT SINGHElectrical203/21/2026
ACCORD POWER INCGeneral Contractor107/08/2026
THOMAS KELLYElectrical103/21/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561105/13/2026
BUREAU VERITAS NA6902210/17/2023
BITOPI CONSULTANTS LLC7036101/03/2023
ALAN MARGOLIN & ASSOC423104/05/2021
Building Lifecycle
All (76)Filed (13)Permit Issued (17)Signed Off (8)Facade (FISP) (15)Violation (10)Special Inspection (13)
06/02/2026
Permit issued — Solar
B01277631-I1-SL
05/13/2026
Filed — Alteration
Installation of 44.145 kw solar energy system on roof. No change of occupancy, use or egress.
B01277631-I1
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
08/26/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
08/26/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
09/26/2024
Signed off — Alteration
NYCHA Brownsville Houses-Bldg 17, Roofing repairs as per the plans filed including: Removal/replacement/repairs of existing roofing system, roof drains, parapet walls, window glass, spalled/cracked masonry & concrete. Hgt reduction of existing compactor.
B00491843-I1
01/30/2024
Signed off — Alteration
B00816485-I1
01/26/2024
Permit issued — Construction Fence
B00816485-I1-FN
01/24/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852685-I1
01/24/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852693-I1
01/12/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 281 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00806497-I1
12/28/2023
Signed off — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00710830-I1
12/27/2023
Cycle 9 facade report submitted
12/27/2023
Cycle 9 facade inspection completed
12/27/2023
Cycle 9 facade report signed — SAFE
11/23/2023
Signed off — Alteration
B00156726-I1
10/20/2023
Special inspection requirement — Masonry
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Final
IBRAHIM MOURAD
10/17/2023
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00710830-P3
09/11/2023
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00710830-P2
09/06/2023
Special inspection requirement — Final
PHILIP RESCINITI
08/31/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 281 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00171254-I1
07/14/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852685-P1
06/23/2023
Permit issued — Sidewalk Shed
B00171254-I1-SH
05/24/2023
Permit issued — General Construction
B00491843-I1-GC
04/13/2023
Violation issued (ECB, closed)
Construction
04/03/2023
Permit issued — Sidewalk Shed
B00852685-I1-SH
04/03/2023
Permit issued — Construction Fence
B00852693-I1-FN
03/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852685-I1
03/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852693-I1
02/13/2023
Permit issued — Construction Fence
B00816485-I1-FN
02/10/2023
Filed — Alteration
B00816485-I1
02/02/2023
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 281 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00171254-P1
01/05/2023
Permit issued — Supported Scaffold
B00806497-I1-SF
01/03/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 281 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00806497-I1
11/26/2022
Permit issued — General Construction
B00710830-I1-GC
11/08/2022
Cycle 9 facade report submitted
11/08/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2022
Cycle 9 facade report signed — UNSAFE
09/23/2022
Cycle 9 facade inspection completed
07/07/2022
Permit issued — Construction Fence
B00156726-I1-FN
06/21/2022
Permit issued — Sidewalk Shed
B00171254-I1-SH
04/06/2022
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00710830-I1
07/07/2021
Permit issued — Construction Fence
B00156726-I1-FN
06/21/2021
Permit issued — Sidewalk Shed
B00171254-I1-SH
04/05/2021
Filed — Alteration
NYCHA Brownsville Houses-Bldg 17, Roofing repairs as per the plans filed including: Removal/replacement/repairs of existing roofing system, roof drains, parapet walls, window glass, spalled/cracked masonry & concrete. Hgt reduction of existing compactor.
B00491843-I1
03/24/2021
Special inspection requirement — Insulation placement and R values
Young Suh
03/24/2021
Special inspection requirement — Final
Paul Millman
03/24/2021
Special inspection requirement — Post-installed Anchors
Young Suh
03/24/2021
Special inspection requirement — Masonry
Young Suh
06/16/2020
Permit issued — Sidewalk Shed
B00171254-I1-SH
06/16/2020
Violation issued (ECB, closed)
Construction
05/11/2020
Permit issued — Construction Fence
B00156726-I1-FN
02/12/2020
Violation issued (ECB, closed)
Construction
06/24/2019
Violation issued (ECB, closed)
Construction
05/28/2019
Permit issued — Sidewalk Shed
B00171254-I1-SH
05/26/2019
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 281 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00171254-I1
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedACCORD POWER INC06/02/2026
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/26/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/23/2023
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP05/24/2023
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP04/03/2023
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP04/03/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/13/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/05/2023
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC11/26/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/16/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/11/2020
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/28/2019
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC04/23/2019
BISOTISSUEDZORIA HOUSING, LLC11/15/2013
BISEQISSUEDZORIA HOUSING, LLC11/15/2013
BISEQISSUEDZORIA HOUSING, LLC08/21/2013
BISEQISSUEDZORIA HOUSING, LLC08/20/2013
BISPLISSUEDKORDUN CONSTRUCTION CORP01/04/2008
BISPLISSUEDAMK CONT CORP10/04/2006
BISPLISSUEDAMK CONT CORP10/04/2005
BISOTISSUEDCROW CONSTRUCTION CO_JONES11/06/1998
BISMHISSUEDCROW CONSTRUCTION CO_JONES11/06/1998
BISOTISSUEDCROW CONSTRUCTION CO06/15/1998
BISPLISSUEDD & S PLG & HTG CORP06/06/1997
BISMHISSUEDCROW CONSTRUCTION CO12/11/1996
BISPLISSUEDD&SPLG&HTGCORP/ZAFFUTOCONSTCOINC06/27/1996
6 projects · most recent 09/02/2025
FiledStatusContractorScope
09/02/2025Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
03/24/2023CompleteLIT MODE ELECL CONTG INC—
03/24/2023CompleteLIT MODE ELECL CONTG INC—
04/19/2021Permit IssuedHYLAN DATACOM & ELECL LLC—
09/12/2020Permit IssuedAMIN ELECTRICAL CORP—
03/26/2019Permit IssuedUSA ELECT'L SERVICES CORP—
1 project · most recent 05/13/2026
FiledStatusContractorScope
05/13/2026Permit IssuedACCORD POWER INC81 panels, 44.14 kw, 6,481.42 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/12/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
08/26/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
08/26/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
08/26/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
08/26/2025FinalMalathi Ananthakrishnanprogress
10/20/2023MasonryIBRAHIM MOURADspecial
10/20/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/20/2023FinalIBRAHIM MOURADprogress
09/06/2023FinalPHILIP RESCINITIprogress
03/24/2021Insulation placement and R valuesYoung Suhenergy_progress
03/24/2021FinalPaul Millmanprogress
03/24/2021Post-installed AnchorsYoung Suhspecial
03/24/2021MasonryYoung Suhspecial
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
09/01/2026B00491843-I1Request digital key ↗
08/30/2026B00710830-P3Request digital key ↗
08/30/2026B00710830-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00171254-P1Request digital key ↗
09/02/2026B00171254-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00156726-I1Request digital key ↗
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
10/17/2013320503692Open ↗
08/20/2013340077124Open ↗
08/20/2013340077133Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/20/2013340077124Open ↗
08/20/2013340077133Open ↗
07/11/2012320503692Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00156726-I1Open ↗
09/02/2026B00171254-P1Open ↗
09/02/2026B00171254-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/16/2014340077124Open ↗
12/12/2012320503692Open ↗
12/12/2012320503692Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00491843-I1Open ↗
09/02/2026B00491843-I1Open ↗
09/01/2026B00710830-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00491843-I1Open ↗
09/01/2026B00710830-I1Open ↗
08/27/2026B01277631-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/20/2013340077124Open ↗
08/20/2013340077133Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/20/2013340077124Open ↗
08/20/2013340077133Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/20/2013340077124Open ↗
08/20/2013340077133Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/11/2012320503692Open ↗
10/10/2007310033200Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/11/2012320503692Open ↗
10/10/2007310033200Open ↗
▸BISPC FULL REPORT1
10/10/2007310033200Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00491843-I1Open ↗
08/30/2026B00710830-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/14/2014320503692Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/10/2007310033200Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01277631-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/12/2012320503692Open ↗
12/12/2012320503692Open ↗
12/12/2012320503692Open ↗
▸BISTR8: Energy Code Progress Inspections2
04/14/2014320503692Open ↗
07/11/2012320503692Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/20/2013340077133Open ↗
▸BISEN2 - As Built Energy Analysis1
04/14/2014320503692Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00491843-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/20/2013340077124Open ↗
08/20/2013340077133Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/02/2026B00156726-I1Open ↗
09/02/2026B00171254-I1Open ↗
09/02/2026B00171254-P1Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/14/2014320503692Open ↗
01/16/2014340077124Open ↗
10/17/2013320503692Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/07/2011310033200Open ↗
10/05/2011310033200Open ↗
04/14/2014320503692Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/11/2012320503692Open ↗
10/10/2007310033200Open ↗
▸DOB NOWDEP Variance (V5) letter2
09/01/2026B00491843-I1Open ↗
08/30/2026B00710830-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/14/2014320503692Open ↗
07/11/2012320503692Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET3
08/20/2013340077124Open ↗
08/20/2013340077133Open ↗
07/11/2012320503692Open ↗