← Back
Elevator apt, fireproof without stores
Brownsville (NYCHA)
619 ROCKAWAY AVENUE · BIN 3326519
💬 Discuss this project
1975Year Built
6Stories
D3Building Class
R6Zoning
553,197 sfGross Floor Area
720Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 465,500 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3609/07/2026
NYCHA 99303/22/2026
NEW YORK CITY HOUSING AUTHORITY203/22/2026
NYC HOUSING AUTHORITY303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS105/13/2026
ZIE410/17/2023
JOEL PHAGOO P.E. PLLC409/21/2023
AK CONSULTING SERVICES, INC202/10/2023
IKRA CONSULTING LLC202/02/2023
BITOPI CONSULTANTS LLC101/03/2023
SUPERSTRUCTURES ENG. + ARCH.104/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH103/21/2026
AK CONSULTING SERVICES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor2307/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor507/08/2026
LIT MODE ELECL CONTG INCElectrical203/22/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
ACCORD POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561105/13/2026
BUREAU VERITAS NA6902210/17/2023
BITOPI CONSULTANTS LLC7036101/03/2023
ALAN MARGOLIN & ASSOC423104/05/2021
Building Lifecycle
All (85)Filed (15)Permit Issued (17)Signed Off (8)Facade (FISP) (16)Violation (16)Inspection (4)Special Inspection (9)
06/05/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/01/2026
Permit issued — Solar
B01277657-I1-SL
05/13/2026
Filed — Alteration
Installation of 40.875 kw solar energy system on roof. No change of occupancy, use or egress.
B01277657-I1
02/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/26/2024
Signed off — Alteration
NYCHA Brownsville Houses-Bldg 18, Roofing repairs as per the plans filed including: Removal/replacement/repairs of existing roofing system, roof drains, parapet walls, window glass, spalled/cracked masonry & concrete. Hgt reduction of existing compactor.
B00491866-I1
01/30/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 293 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00816491-I1
01/26/2024
Permit issued — Construction Fence
B00816491-I1-FN
01/12/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 293 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00806506-I1
01/09/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 293 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00166694-I1
01/03/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852701-I1
01/03/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852707-I1
12/28/2023
Signed off — Alteration
B00710843-I1
11/23/2023
Signed off — Alteration
B00172335-I1
11/17/2023
Cycle 9 facade report submitted
11/17/2023
Cycle 9 facade report signed — SAFE
11/15/2023
Cycle 9 facade inspection completed
10/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Final
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Masonry
IBRAHIM MOURAD
10/17/2023
Filed — Alteration
B00710843-P4
09/22/2023
Filed — Alteration
B00710843-P3
09/21/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852701-P1
09/21/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852707-P1
09/08/2023
Special inspection requirement — Final
IBRAHIM MOURAD
07/21/2023
Violation issued (FDNY_NOV, closed)
07/21/2023
Violation issued (FDNY_NOV, closed)
07/21/2023
Violation issued (FDNY_NOV, closed)
06/23/2023
Permit issued — Sidewalk Shed
B00166694-I1-SH
05/24/2023
Permit issued — General Construction
B00491866-I1-GC
04/03/2023
Permit issued — Construction Fence
B00852707-I1-FN
04/03/2023
Permit issued — Sidewalk Shed
B00852701-I1-SH
03/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852701-I1
03/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00852707-I1
02/13/2023
Permit issued — Construction Fence
B00816491-I1-FN
02/10/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 293 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00816491-I1
02/02/2023
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 293 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00166694-P1
01/05/2023
Permit issued — Supported Scaffold
B00806506-I1-SF
01/03/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 293 DUMONT AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00806506-I1
01/03/2023
Special inspection requirement — Post-installed Anchors
KAMRUL AHSAN
11/26/2022
Permit issued — General Construction
B00710843-I1-GC
11/08/2022
Cycle 9 facade report submitted
11/08/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2022
Cycle 9 facade report signed — UNSAFE
10/31/2022
Filed — Alteration
B00710843-P1
10/04/2022
Cycle 9 facade inspection completed
07/07/2022
Permit issued — Construction Fence
B00172335-I1-FN
06/21/2022
Permit issued — Sidewalk Shed
B00166694-I1-SH
04/06/2022
Filed — Alteration
B00710843-I1
07/07/2021
Permit issued — Construction Fence
B00172335-I1-FN
06/21/2021
Permit issued — Sidewalk Shed
B00166694-I1-SH
04/05/2021
Filed — Alteration
NYCHA Brownsville Houses-Bldg 18, Roofing repairs as per the plans filed including: Removal/replacement/repairs of existing roofing system, roof drains, parapet walls, window glass, spalled/cracked masonry & concrete. Hgt reduction of existing compactor.
B00491866-I1
03/24/2021
Special inspection requirement — Insulation placement and R values
Young Suh
03/24/2021
Special inspection requirement — Final
Paul Millman
03/24/2021
Special inspection requirement — Post-installed Anchors
Young Suh
03/24/2021
Special inspection requirement — Masonry
Young Suh
06/16/2020
Permit issued — Sidewalk Shed
B00166694-I1-SH
05/20/2020
Permit issued — Construction Fence
B00172335-I1-FN
06/24/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedACCORD POWER INC06/01/2026
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/26/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/23/2023
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP05/24/2023
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP04/03/2023
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP04/03/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/13/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/05/2023
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC11/26/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/16/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/20/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/29/2019
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/23/2019
BISEQISSUEDZORIA HOUSING, LLC11/20/2013
BISOTISSUEDZORIA HOUSING, LLC11/15/2013
BISOTISSUEDZORIA HOUSING, LLC11/15/2013
BISEQISSUEDZORIA HOUSING, LLC11/15/2013
BISOTISSUEDZORIA HOUSING, LLC10/10/2013
BISEQISSUEDZORIA HOUSING, LLC08/21/2013
BISPLISSUEDKORDUN CONSTRUCTION CORP06/14/2011
BISPLISSUEDKORDUN CONSTRUCTION CORP01/04/2008
BISOTISSUEDCROW CONSTRUCTION CO_JONES11/06/1998
BISMHISSUEDCROW CONSTRUCTION CO__JONES11/06/1998
BISOTISSUEDCROW CONSTRUCTION CO06/15/1998
BISPLISSUEDD & S PLG & HTG CORP06/06/1997
BISMHISSUEDCROW CONSTRUCTION CO12/11/1996
6 projects · most recent 09/03/2025
FiledStatusContractorScope
09/03/2025Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
03/24/2023CompleteLIT MODE ELECL CONTG INC—
03/24/2023CompleteLIT MODE ELECL CONTG INC—
04/19/2021Permit IssuedHYLAN DATACOM & ELECL LLC—
09/12/2020Permit IssuedAMIN ELECTRICAL CORP—
05/13/2019Permit IssuedUSA ELECT'L SERVICES CORP—
1 project · most recent 05/13/2026
FiledStatusContractorScope
05/13/2026Permit IssuedACCORD POWER INC75 panels, 40.87 kw, 8,819.7 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/05/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/20/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/20/2023FinalIBRAHIM MOURADprogress
10/20/2023MasonryIBRAHIM MOURADspecial
09/08/2023FinalIBRAHIM MOURADprogress
01/03/2023Post-installed AnchorsKAMRUL AHSANspecial
03/24/2021Insulation placement and R valuesYoung Suhenergy_progress
03/24/2021FinalPaul Millmanprogress
03/24/2021Post-installed AnchorsYoung Suhspecial
03/24/2021MasonryYoung Suhspecial
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch12
09/01/2026B00491866-I1Request digital key ↗
08/28/2026B00806506-I1Request digital key ↗
08/27/2026B00816491-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00166694-P1Request digital key ↗
09/01/2026B00166694-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00172335-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
08/20/2013340077160Open ↗
08/20/2013340077142Open ↗
07/11/2012320503683Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION5
11/29/2013340077142Open ↗
08/20/2013340077160Open ↗
08/20/2013340077142Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/02/2026B00166694-I1Open ↗
09/02/2026B00166694-P1Open ↗
09/02/2026B00172335-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
01/16/2014340077160Open ↗
12/12/2012320503683Open ↗
12/12/2012320503683Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B00710843-I1Open ↗
08/26/2026B00491866-I1Open ↗
08/26/2026B00491866-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026B00806506-I1Open ↗
09/02/2026B00710843-I1Open ↗
08/26/2026B00491866-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/20/2013340077160Open ↗
08/20/2013340077142Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/20/2013340077160Open ↗
08/20/2013340077142Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/20/2013340077160Open ↗
08/20/2013340077142Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/11/2012320503683Open ↗
10/10/2007310033219Open ↗
▸BISPC FULL REPORT1
10/10/2007310033219Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/10/2007310033219Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00491866-I1Open ↗
08/26/2026B00710843-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/14/2014320503683Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/10/2007310033219Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01277657-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/12/2012320503683Open ↗
12/12/2012320503683Open ↗
12/12/2012320503683Open ↗
▸BISTR8: Energy Code Progress Inspections2
04/14/2014320503683Open ↗
07/11/2012320503683Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/20/2013340077142Open ↗
▸BISEN2 - As Built Energy Analysis1
04/14/2014320503683Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00491866-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/20/2013340077160Open ↗
08/20/2013340077142Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/02/2026B00166694-I1Open ↗
09/02/2026B00166694-P1Open ↗
09/02/2026B00172335-I1Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/14/2014320503683Open ↗
01/16/2014340077160Open ↗
01/10/2014340077142Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/16/2014340077160Open ↗
10/07/2011310033219Open ↗
10/05/2011310033219Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
07/11/2012320503683Open ↗
10/10/2007310033219Open ↗
▸DOB NOWDEP Variance (V5) letter2
09/01/2026B00491866-I1Open ↗
08/26/2026B00710843-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/14/2014320503683Open ↗
07/11/2012320503683Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET3
08/20/2013340077160Open ↗
08/20/2013340077142Open ↗
07/11/2012320503683Open ↗