← Back
Elevator apt, fireproof without stores
Brownsville (NYCHA)
619 ROCKAWAY AVENUE · BIN 3326526
💬 Discuss this project
1975Year Built
6Stories
D3Building Class
R6Zoning
553,197 sfGross Floor Area
720Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 465,500 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3908/29/2026
NYCHA 99103/22/2026
NYC HOUSING AUTHORITY NYC HOUSING AUTHORITY103/22/2026
NEW YORK CITY HOUSING AUTHORITY103/21/2026
NYC HOUSING AUTHORITY203/21/2026
NYC HOUSING AUTH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS105/13/2026
ZIE410/17/2023
JOEL PHAGOO P.E. PLLC307/14/2023
AK CONSULTING SERVICES, INC211/09/2022
BITOPI CONSULTANTS LLC211/08/2022
IKRA CONSULTING LLC110/26/2022
SUPERSTRUCTURES ENG. + ARCH.104/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH103/21/2026
AK CONSULTING SERVICES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor1907/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor507/08/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
DAVEN ELECTRIC CORPElectrical103/22/2026
ACCORD POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561105/13/2026
BUREAU VERITAS NA6902210/17/2023
IKRA CONSULTING LLC7032110/26/2022
ALAN MARGOLIN & ASSOC423104/05/2021
Building Lifecycle
All (75)Filed (14)Permit Issued (15)Signed Off (8)Facade (FISP) (15)Violation (12)Inspection (2)Special Inspection (9)
08/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2026
Permit issued — Solar
B01277055-I1-SL
05/13/2026
Filed — Alteration
Installation of 31.61 kw solar energy system on roof. No change of occupancy, use or egress.
B01277055-I1
07/10/2025
Violation issued (FDNY_NOV, closed)
09/26/2024
Signed off — Alteration
B00491356-I1
12/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 290 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08035108-I1
12/28/2023
Signed off — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00756432-I1
10/30/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00816161-I1
10/30/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00816155-I1
10/20/2023
Special inspection requirement — Final
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Masonry
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
10/17/2023
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00756432-P3
10/16/2023
Special inspection requirement — Final
IBRAHIM MOURAD
10/16/2023
Special inspection requirement — Masonry
IBRAHIM MOURAD
10/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
09/12/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 290 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08021641-I1
09/06/2023
Cycle 9 facade report submitted
09/05/2023
Cycle 9 facade report signed — SAFE
08/31/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 290 BLAKE AVENUE , BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00134394-I1
08/31/2023
Cycle 9 facade inspection completed
07/14/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00816155-P1
05/05/2023
Permit issued — General Construction
B00491356-I1-GC
02/24/2023
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00756432-P2
02/23/2023
Special inspection requirement — Final
PHILIP RESCINITI
02/03/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00816161-I1
02/03/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00816155-I1
02/03/2023
Permit issued — Sidewalk Shed
B00816155-I1-SH
02/03/2023
Permit issued — Construction Fence
B00816161-I1-FN
12/06/2022
Signed off — Alteration
B00156647-I1
11/17/2022
Violation issued (FDNY_NOV, closed)
11/16/2022
Cycle 9 facade report submitted
11/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2022
Permit issued — Construction Fence
B08035108-I1-FN
11/09/2022
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 290 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08035108-I1
11/08/2022
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 290 BLAKE AVENUE , BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00134394-P1
11/07/2022
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00756432-P1
11/04/2022
Special inspection requirement — Final
PHILIP RESCINITI
10/27/2022
Permit issued — Supported Scaffold
B08021641-I1-SF
10/26/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 290 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08021641-I1
10/14/2022
Special inspection requirement — Post-installed Anchors
MD MOSTAFA
10/05/2022
Cycle 9 facade report signed — UNSAFE
10/04/2022
Cycle 9 facade inspection completed
07/13/2022
Permit issued — General Construction
B00756432-I1-GC
07/07/2022
Permit issued — Construction Fence
B00156647-I1-FN
06/21/2022
Permit issued — Sidewalk Shed
B00134394-I1-SH
06/14/2022
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00756432-I1
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2021
Permit issued — Construction Fence
B00156647-I1-FN
06/21/2021
Permit issued — Sidewalk Shed
B00134394-I1-SH
04/05/2021
Filed — Alteration
B00491356-I1
06/16/2020
Permit issued — Sidewalk Shed
B00134394-I1-SH
05/11/2020
Permit issued — Construction Fence
B00156647-I1-FN
07/09/2019
Violation issued (ECB, closed)
Construction
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2019
Permit issued — Construction Fence
B00156647-I1-FN
04/22/2019
Filed — Alteration
B00156647-I1
03/26/2019
Cycle 8 facade report submitted
03/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedACCORD POWER INC06/03/2026
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP05/05/2023
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP02/03/2023
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP02/03/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC11/10/2022
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC10/27/2022
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC07/13/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC07/07/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/21/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/16/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/11/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC04/24/2019
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC02/25/2019
BISEQISSUEDRENNON CONSTRUCTION CORP03/28/2016
BISEQISSUEDCHAMPION ELECTRICAL MECHA03/24/2016
BISEQISSUEDVIKRANT CONTRACTING & BUILDER09/02/2015
BISOTISSUEDZORIA HOUSING, LLC09/13/2013
BISEQISSUEDZORIA HOUSING, LLC07/31/2013
BISEQISSUEDZORIA HOUSING, LLC07/31/2013
BISPLISSUEDKORDUN CONSTRUCTION CORP01/29/2008
BISMHISSUEDCROW CONSTRUCTION CO__JONES11/06/1998
BISOTISSUEDCROW CONSTRUCTION CO_JONES11/06/1998
BISOTISSUEDCROW CONSTRUCTION CO06/15/1998
BISEQISSUEDPSG CONSTRUCTION CO.INC01/07/1998
BISPLISSUEDD & S PLG & HTG CORP06/06/1997
BISEQISSUEDPSG CONSTRUCTION CO.INC05/08/1997
BISMHISSUEDCROW CONSTRUCTION CO12/13/1996
BISOTISSUEDCROW CONSTRUCTION CO12/13/1996
6 projects · most recent 09/02/2025
General Wiring
FiledStatusContractorScope
09/02/2025Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
01/27/2023CompleteLIT MODE ELECL CONTG INC—
04/19/2021Permit IssuedHYLAN DATACOM & ELECL LLC—
09/11/2020Permit IssuedAMIN ELECTRICAL CORP—
02/06/2019Permit IssuedUSA ELECT'L SERVICES CORP—
08/30/2018CompleteDAVEN ELECTRIC CORPGeneral Wiring
1 project · most recent 05/13/2026
FiledStatusContractorScope
05/13/2026Permit IssuedACCORD POWER INC58 panels, 31.61 kw, 5,168.75 roof_area_sqft
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/20/2023FinalIBRAHIM MOURADprogress
10/20/2023MasonryIBRAHIM MOURADspecial
10/20/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/16/2023FinalIBRAHIM MOURADprogress
10/16/2023MasonryIBRAHIM MOURADspecial
10/16/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
02/23/2023FinalPHILIP RESCINITIprogress
11/04/2022FinalPHILIP RESCINITIprogress
10/14/2022Post-installed AnchorsMD MOSTAFAspecial
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
09/01/2026B00491356-I1Request digital key ↗
08/29/2026B00756432-P1Request digital key ↗
08/29/2026B00756432-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026B00134394-P1Request digital key ↗
08/28/2026B00134394-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00156647-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION7
08/02/2016340390080Open ↗
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION7
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗
09/01/2015340298608Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026B00156647-I1Open ↗
09/01/2026B00491356-I1Open ↗
08/29/2026B00756432-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
06/03/2014340074813Open ↗
01/24/2014340074868Open ↗
12/12/2012320503736Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/02/2016340390080Open ↗
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
08/02/2016340390080Open ↗
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/02/2016340390080Open ↗
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B00756432-I1Open ↗
08/26/2026B00756432-P1Open ↗
08/24/2026B00756432-P3Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/11/2012320503736Open ↗
07/11/2012320503736Open ↗
10/10/2007310030588Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B00756432-I1Open ↗
08/24/2026B00756432-P3Open ↗
08/24/2026B08021641-I1Open ↗
▸BISPC FULL REPORT1
10/10/2007310030588Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/10/2007310030588Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/02/2016340390080Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00491356-I1Open ↗
08/13/2026B00756432-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/02/2016340390080Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/14/2014320503736Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/10/2007310030588Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01277055-I1Open ↗
▸Energy Compliance12
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
03/25/2016340358455Open ↗
09/01/2015340298608Open ↗
07/31/2013340074813Open ↗
▸BISTR8: Energy Code Progress Inspections3
04/14/2014320503736Open ↗
12/24/2013320503736Open ↗
07/11/2012320503736Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/12/2012320503736Open ↗
12/12/2012320503736Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/02/2016340390080Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/02/2016340390080Open ↗
▸BISNYCECC ANALYSIS1
08/02/2016340390080Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00491356-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/02/2016340390080Open ↗
08/02/2016340390080Open ↗
03/25/2016340358455Open ↗
Showing 3 of 7 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
08/02/2016340390080Open ↗
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/02/2026B00156647-I1Open ↗
09/01/2026B00491356-I1Open ↗
08/29/2026B00756432-I1Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/03/2014340074813Open ↗
04/14/2014320503736Open ↗
01/24/2014340074868Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/03/2014340074813Open ↗
12/18/2009310030588Open ↗
04/14/2014320503736Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/11/2012320503736Open ↗
10/10/2007310030588Open ↗
▸DOB NOWDEP Variance (V5) letter2
09/01/2026B00491356-I1Open ↗
08/13/2026B00756432-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/02/2016340390080Open ↗
04/14/2014320503736Open ↗
07/11/2012320503736Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET7
08/02/2016340390080Open ↗
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗
Showing 3 of 7 on file for this type
▸Other Documents2
▸BISFEE EXEMPTION DOCUMENTATION2
03/25/2016340358455Open ↗
03/22/2016340358384Open ↗