← Back
BuildNYC
Elevator apt, fireproof without stores
Brownsville (NYCHA)
619 ROCKAWAY AVENUE · Brownsville · BIN 3326530
💬 Discuss this project
1975Year Built
6Stories
D3Building Class
R6Zoning
553,197 sfGross Floor Area
720Units
LL97 Covered6 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 465,500 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNycha - Brownsville B15Under Construction35p · 5 filings · 20 docs
BulkheadSidewalk shed installation1p · 1 filing · 6 docs
Floor 6BROWNSVILLE BUILDING #15 FACADE REPAIR WORK5p · 1 filing · 20 docs
Floor 5BROWNSVILLE BUILDING #15 FACADE REPAIR WORK5p · 1 filing · 20 docs
Floor 4BROWNSVILLE BUILDING #15 FACADE REPAIR WORK5p · 1 filing · 20 docs
Floor 3BROWNSVILLE BUILDING #15 FACADE REPAIR WORK5p · 1 filing · 20 docs
Floor 2BROWNSVILLE BUILDING #15 FACADE REPAIR WORK5p · 1 filing · 20 docs
Floor 1BROWNSVILLE BUILDING #15 FACADE REPAIR WORK5p · 1 filing · 20 docs
CellarNycha - Brownsville B15Under Construction2p · 1 filing · 4 docs
Site & exteriorNYC Housing Authority37p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4108/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Synergic Design Architects105/13/2026
Joel Phagoo P.E.403/21/2024
ZIE410/17/2023
AK Consulting Services211/09/2022
Bitopi Consultants211/08/2022
Ikra Consulting110/27/2022
Lombardo Professional Engineering108/31/2021
Greenman-Pedersen204/06/2021
Superstructures Engineering +104/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lombardo Building Consultants203/21/2026
Ima Expeditng103/21/2026
Superstructures Engineering +103/21/2026
Greenman-Pedersen403/21/2026
AK Consulting Services1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold1507/08/2026
J & N Construction GroupScaffold707/08/2026
Roma Scaffoldingspecialty_contractor303/21/2026
J & N Construction GroupGeneral Contractor303/21/2026
Triumph ConstructionScaffold203/21/2026
Accord Power ElectricElectrical203/22/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Lit Mode Electrical ContgElectrical103/21/2026
Kordum ConstructionPlumbing103/21/2026
Accord Powerspecialty_contractor107/08/2026
Crow ConstructionGeneral Contractor106/15/1998
Crow Construction CO__JONESGeneral Contractor111/06/1998
Crow Construction CO_JONESGeneral Contractor111/06/1998
D & SPLG & Htgcorp/ZaffutoconstcoincPlumbing106/27/1996
Triumph ConstructionGeneral Contractor109/02/2021
Zoria HousingGeneral Contractor411/15/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Synergic Design8561105/13/2026
Bureau Veritas Na6902210/17/2023
Ikra Consulting7032110/27/2022
Alan Margolin & Associates423104/06/2021
Universal Testing400204/06/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
06/04/2026
Permit issued — Solar
B01277158-I1-SL
05/13/2026
Filed — Alteration
Installation of 41.965 kw solar energy system on roof. No change of occupancy, use or egress.
B01277158-I1
01/30/2026
Elevator Category 1 inspection report filed
03/17/2025
Signed off — Alteration
B01023616-I1
90 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAccord Power06/04/2026
DOB NOWConstruction FenceSigned-offJ & N Construction Group03/22/2024
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group05/05/2023
DOB NOWConstruction FenceSigned-offJ & N Construction Group02/04/2023
DOB NOWSidewalk ShedSigned-offJ & N Construction Group02/03/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding11/16/2022
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding10/27/2022
DOB NOWGeneral ConstructionSigned-offRoma Scaffolding08/16/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding07/16/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding07/07/2022
DOB NOWConstruction FenceSigned-offTriumph Construction09/01/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding07/07/2021
DOB NOWPlumbingSigned-offOlympic Plumbing & Heating Service05/10/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding05/20/2020
DOB NOWConstruction FenceSigned-offRoma Scaffolding05/29/2019
BISOTISSUEDTriumph Construction09/02/2021
BISOTISSUEDZoria Housing11/15/2013
BISEQISSUEDZoria Housing11/15/2013
BISEQISSUEDZoria Housing08/20/2013
BISEQISSUEDZoria Housing08/20/2013
BISPLISSUEDKordun Construction01/04/2008
BISOTISSUEDCrow Construction CO_JONES11/06/1998
BISMHISSUEDCrow Construction CO__JONES11/06/1998
BISOTISSUEDCrow Construction06/15/1998
BISOTISSUEDCrow Construction12/13/1996
BISMHISSUEDCrow Construction12/13/1996
BISPLISSUEDD & SPLG & Htgcorp/Zaffutoconstcoinc06/27/1996
BISOTISSUEDD&S PLG & Htgcorp/Zaffuto Constcoi05/17/1996
3 projects · most recent 09/02/2025
FiledStatusContractorScope
09/02/2025Permit IssuedAccord Power Electric—
01/27/2023CompleteLit Mode Electrical Contg—
08/26/2022Permit IssuedHylan Datacom & Electrical—
1 project · most recent 05/13/2026
FiledStatusContractorScope
05/13/2026Permit IssuedAccord Power—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/06/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/02/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/19/2023FinalIBRAHIM MOURADprogress
10/19/2023MasonryIBRAHIM MOURADspecial
10/19/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/16/2023FinalIBRAHIM MOURADprogress
10/16/2023MasonryIBRAHIM MOURADspecial
10/16/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
02/24/2023FinalPHILIP RESCINITIprogress
11/04/2022FinalPHILIP RESCINITIprogress
10/14/2022Post-installed AnchorsMD MOSTAFAspecial
03/29/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNELSON LOPEZspecial
148 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account