← Back
Two stories - detached, small or mid-size
62-20 DRY HARBOR ROAD
QUEENS · BIN 4068527
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4AZoning
1,268 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 3,240 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHAMPION 1 CONSTRUCTION403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC105/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LAM ENGINEER P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RM ELECTRIC CO., INC.Electrical303/22/2026
CHAMPION 1 CONSTR CO INCGeneral Contractor303/21/2026
Building Lifecycle
All (16)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Objection (10)Special Inspection (1)
11/29/2023
Violation issued (HPD, closed)
I
05/19/2021
Signed off — Alteration
PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#421715371. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00167484-I1
08/19/2020
Violation issued (ECB, closed)
Construction
05/28/2019
Permit issued — Construction Fence
Q00167484-I1-FN
05/21/2019
Objection raised — Scope
05/21/2019
Objection resolved — Addressed
05/21/2019
Objection raised — Scope
05/21/2019
Objection resolved — Addressed
05/21/2019
Objection raised — Structural
05/21/2019
Objection resolved — Addressed
05/21/2019
Objection raised — Scope
05/21/2019
Objection resolved — Addressed
05/21/2019
Objection raised — Scope
05/21/2019
Objection resolved — Addressed
05/17/2019
Filed — Alteration
PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#421715371. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00167484-I1
05/14/2019
Special inspection requirement — Final
YUK LAM
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCHAMPION 1 CONSTR CO INC05/28/2019
BIS—ISSUEDCHAMPION 1 CONSTR CO INC07/12/2021
BIS—ISSUEDCHAMPION 1 CONSTR CO INC05/22/2020
BIS—ISSUEDCHAMPION 1 CONSTR CO INC06/03/2019
1 project · most recent 06/12/2021
General Wiring
FiledStatusContractorScope
06/12/2021CompleteRM ELECTRIC CO., INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/14/2019FinalYUK LAMprogress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026Q00167484-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
06/09/2021421715371Open ↗
08/18/2020421715371Open ↗
08/13/2020421715371Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
06/26/2019421715371Open ↗
06/13/2019421715371Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/19/2021421715371Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/24/2021421715371Open ↗
▸BISZONING DIAGRAM1
05/02/2019421715371Open ↗
▸BISVERIFY TAX LOT1
09/24/2021421715371Open ↗
▸Seals & Professional Certifications7
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/13/2019421715371Open ↗
05/02/2019421715371Open ↗
05/02/2019421715371Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00167484-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026Q00167484-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
08/18/2020421715371Open ↗
08/13/2020421715371Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/18/2020421715371Open ↗
01/18/2019421715371Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
01/18/2019421715371Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/13/2019421715371Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/13/2019421715371Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/02/2019421715371Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/13/2019421715371Open ↗
05/02/2019421715371Open ↗
01/18/2019421715371Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/22/2021421715371Open ↗
09/21/2021421715371Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/24/2021421715371Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/05/2021421715371Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/22/2021421715371Open ↗
06/21/2021421715371Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/05/2021421715371Open ↗
06/13/2019421715371Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/02/2019421715371Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/13/2019421715371Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE2
06/09/2021421715371Open ↗
02/26/2019421715371Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
09/24/2021421715371Open ↗
01/18/2019421715371Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/04/2021421715371Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION7
09/24/2021421715371Open ↗
06/21/2021421715371Open ↗
08/19/2020421715371Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET1
01/18/2019421715371Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
05/02/2019421715371Open ↗