← Back
BuildNYC
Two family converted from one family
62 WIMAN AVENUE
STATEN ISLAND · BIN 5067533
💬 Discuss this project
1920Year Built
1.75Stories
B3Building Class
R3AZoning
1,768 sfGross Floor Area
2Units
Two family converted from one family · 6,420 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Unit 2W9p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Goodland Design & Build1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Goodland Build & Design510/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K A Interior Design1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri State Plumbing & HeatingPlumbing207/08/2026
Super Power ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Yang Engineering8376510/15/2025
Building Lifecycle
11/13/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
S01168244-S1-PL
04/11/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S01168244-I1-GC
11/13/2025
Permit renewed — Plumbing
Renewed without changes
S01168244-S1-PL
11/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/15/2025
Filed — Alteration CO
Replace existing exterior siding with stucco finish, repair the existing concrete walk way, remove a broken concrete patio in the side yard and restore it to connect to the existing lawn.
S01168244-P3
48 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDW Plumbing11/13/2025
DOB NOWPlumbingPermit IssuedDW Plumbing06/24/2025
DOB NOWGeneral ConstructionPermit IssuedSuper Power Construction04/11/2025
1 project · most recent 10/15/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/15/2025Permit IssuedSuper Power ConstructionHeating and Air Conditioning Systems
1 project · most recent 10/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/15/2025Permit IssuedTri State Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025Permit IssuedVoltron ElectricGeneral Wiring
07/29/2025CompleteVoltron Electric—
1 project · most recent 10/15/2025
Wood
FiledStatusContractorScope
10/15/2025Permit IssuedTri State Plumbing & HeatingWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/14/2025HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
10/14/2025Fire-Resistant Penetrations and JointsJian Yangspecial
06/23/2025FinalFangliang Chenprogress
06/23/2025Fenestration air leakageFangliang Chenenergy_progress
06/23/2025HVAC-R and service water heating system controlsFangliang Chenenergy_progress
06/23/2025Insulation placement and R valuesFangliang Chenenergy_progress
06/23/2025Air barrier - visual inspectionFangliang Chenenergy_progress
06/23/2025HVAC-R and service water heating equipmentFangliang Chenenergy_progress
06/23/2025Fenestration and door U-factor and product ratingsFangliang Chenenergy_progress
06/23/2025Fenestration areasFangliang Chenenergy_progress
06/23/2025HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
06/23/2025Mechanical SystemsJian Yangspecial
06/23/2025Designated Seismic System—special
06/11/2025Mechanical SystemsJian Yangspecial
06/11/2025Designated Seismic System—special
06/11/2025FinalFangliang Chenprogress
06/11/2025HVAC-R and service water heating equipmentFangliang Chenenergy_progress
06/11/2025HVAC-R and service water heating system controlsFangliang Chenenergy_progress
06/11/2025HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
06/11/2025Fenestration air leakageFangliang Chenenergy_progress
06/11/2025Fenestration areasFangliang Chenenergy_progress
06/11/2025Air barrier - visual inspectionFangliang Chenenergy_progress
06/11/2025Insulation placement and R valuesFangliang Chenenergy_progress
06/11/2025Fenestration and door U-factor and product ratingsFangliang Chenenergy_progress
06/10/2025HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
Latest 25 of 26.
47 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account