| Owner | Filings | Most Recent |
|---|---|---|
| RXR REALTY | 177 | 09/13/2026 |
| RXR | 31 | 08/29/2026 |
| RXR 620 MASTERLEASE LLC | 111 | 03/22/2026 |
| RXR 620 OWNER 11 LLC | 4 | 03/22/2026 |
| RXR 620 OWNER II LLC | 6 | 03/22/2026 |
| ROCK GROUP NY | 3 | 03/22/2026 |
| ANTHONY FREER RXR 620 MAS | 1 | 03/22/2026 |
| SKYLINE SCAFFOLDING GROUP | 1 | 03/22/2026 |
| 37-41 EAST 18TH STREET RE | 1 | 03/22/2026 |
| CF 620 OWNERS LLC | 7 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| HNY CONSULTING ENGINEERS LLC | 7 | 06/16/2026 |
| FREDERICK TAYLOR ASSOC - ARCH, PC | 5 | 05/13/2026 |
| ACERTUS CONSULTING GROUP, LLC | 4 | 03/19/2026 |
| SBLM ARCHITECTS, PC | 2 | 03/03/2026 |
| CCPE | 2 | 03/03/2026 |
| XU CONSULTING ENGINEERING P.C. | 2 | 03/02/2026 |
| ME ENGINEERS | 15 | 02/23/2026 |
| IW ARCHITECTURE, PLLC | 4 | 02/12/2026 |
| RICHARD PUSWALD | 1 | 02/12/2026 |
| ASHRAF CORP | 3 | 01/21/2026 |
| BIANCA V. SKVIRSKY, PE | 2 | 12/22/2025 |
| THORNTON TOMASETTI | 3 | 12/11/2025 |
| NELSON ARCHITECTURE &INTERIORS, INC | 5 | 12/01/2025 |
| WALLACE ENGINEERING | 2 | 09/25/2025 |
| 5TH FLOOR DESIGN | 4 | 08/28/2025 |
| MURDOCH ENGINEERING | 2 | 08/27/2025 |
| ROBERT G. LYON & ASSOC | 1 | 05/23/2025 |
| RODNEY D. GIBBLE CONSULTING ENGINEE | 1 | 12/13/2024 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 1 | 10/07/2024 |
| MSM ENGINEERING SERVICES, PLLC | 3 | 05/22/2024 |
| VOCON | 8 | 11/27/2023 |
| LILKER ASSOCIATES CONSULTING ENGINE | 16 | 08/24/2023 |
| YSRAEL A. SEINUK, P.C. | 2 | 01/24/2023 |
| KABACK ENTERPRISES | 1 | 10/22/2021 |
| TPG ARCHITECTURE, LLP | 1 | 10/05/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| LOUIS STRIAR | 8 | 03/21/2026 |
| RIZZO GROUP | 64 | 03/21/2026 |
| GEORGE E BERGER ASS | 16 | 03/21/2026 |
| NEW YORK SIGN CONSULTANTS | 8 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| ARCHETYPE CONSULTANTS | 18 | 03/21/2026 |
| PEROTTO CONSULTING MANAGEMENT | 8 | 03/21/2026 |
| DYNAMIC BUILDING CONSULTANTS | 2 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RXR CONSTRUCTION SERV LLC | General Contractor | 29 | 07/25/2026 |
| SCHIMENTI CONSTRUCTION CO | General Contractor | 16 | 04/09/2026 |
| STRUCTURE TONE, LLC | General Contractor | 13 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 7 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 6 | 07/08/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 6 | 04/09/2026 |
| LANE REFRIGERATION CO.,IN | General Contractor | 6 | 07/08/2026 |
| LEMX CORP | General Contractor | 6 | 09/03/2026 |
| DEMARTINO CONSTR. CO. INC | General Contractor | 5 | 07/08/2026 |
| NATIONAL SIGN LIGHTING | Scaffold | 4 | 07/08/2026 |
| MAUCERI SIGN SYSTEMS | Scaffold | 4 | 06/27/2026 |
| OCS BUILDERS GROUP LLC | General Contractor | 3 | 06/02/2026 |
| MARC CANNELLA | Electrical | 3 | 03/21/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 3 | 07/08/2026 |
| MACCARONE PLUMBING INC | Fire Protection | 3 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 3 | 07/08/2026 |
| MJH ENERGY CONSULTING INC | Plumbing | 3 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 2 | 07/08/2026 |
| AARON PLBG AND MECH SYST | Plumbing | 2 | 07/08/2026 |
| AMERICON CONSTRUCTION INC. | General Contractor | 2 | 03/21/2026 |
| MACCARONE PLUMBING INC | Plumbing | 2 | 07/08/2026 |
| MJH ENERGY CONSULTING INC | Fire Protection | 2 | 07/08/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 1 | 07/08/2026 |
| VILLAGE P & H NY INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CATALPA SPECIAL INSPECTIO | 2004 | 10 | 03/19/2026 |
| MEP INSPECTIONS, INC | 1102 | 2 | 03/03/2026 |
| METRIC CONSULTING AND INS | 1803 | 2 | 03/02/2026 |
| SONI ENGINEERING CONSULTI | 9819 | 1 | 02/06/2026 |
| CONSULTING AND TESTING SE | 6152 | 22 | 12/11/2025 |
| WHITESTONE ASSOCIATES ENG | 8144 | 6 | 10/30/2025 |
| FREDERICK TAYLOR ASSOCIAT | 1076 | 1 | 03/02/2024 |
| DOMANI INSPECTION SERVICE | 843 | 16 | 08/24/2023 |
| AK ENGINEERING PC | 678 | 1 | 04/15/2022 |
| JON LIBASCI | 3068 | 1 | 10/22/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Supported Scaffold | Permit Issued | LEMX CORP | 09/02/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | LEMX CORP | 09/01/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | LEMX CORP | 09/01/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 07/24/2026 |
| DOB NOW | Structural | Permit Issued | RXR CONSTRUCTION SERV LLC | 07/24/2026 |
| DOB NOW | General Construction | Signed-off | DEMARTINO CONSTR. CO. INC | 05/18/2026 |
| DOB NOW | Structural | Permit Issued | RXR CONSTRUCTION SERV LLC | 04/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | RXR CONSTRUCTION SERV LLC | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 04/01/2026 |
| DOB NOW | Sprinklers | Signed-off | MJH ENERGY CONSULTING INC | 03/06/2026 |
| DOB NOW | Plumbing | Signed-off | MJH ENERGY CONSULTING INC | 02/26/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | DNA CONTRACTING LLC | 02/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | EAGLE SCAFFOLDING SVCS IN | 02/13/2026 |
| DOB NOW | Sign | Permit Issued | MAUCERI SIGN CO., INC | 02/12/2026 |
| DOB NOW | Sign | Permit Issued | MAUCERI SIGN CO., INC | 02/12/2026 |
| DOB NOW | Sign | Permit Issued | MAUCERI SIGN CO., INC | 02/12/2026 |
| DOB NOW | Sign | Permit Issued | MAUCERI SIGN CO., INC | 02/12/2026 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 01/27/2026 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 01/26/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | PHOENIX SUTTON STR INC | 01/22/2026 |
| DOB NOW | Standpipe | Signed-off | ABCO-PEERLESS SPRKLR CORP | 10/21/2025 |
| DOB NOW | Structural | Permit Issued | SCHIMENTI CONSTRUCTION CO | 10/01/2025 |
| DOB NOW | Plumbing | Signed-off | MJH ENERGY CONSULTING INC | 10/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | OCS BUILDERS GROUP LLC | 09/30/2025 |
| DOB NOW | Structural | Signed-off | OCS BUILDERS GROUP LLC | 09/30/2025 |
| DOB NOW | General Construction | Signed-off | OCS BUILDERS GROUP LLC | 09/29/2025 |
| DOB NOW | General Construction | Permit Issued | PAUL CHARLTON | 09/24/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | LEMX CORP | 09/19/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | LEMX CORP | 09/19/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | LEMX CORP | 09/18/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | PHOENIX SUTTON STR INC | 09/18/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | PHOENIX SUTTON STR INC | 09/18/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 09/09/2025 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 09/04/2025 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 09/04/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RXR CONSTRUCTION SERV LLC | 08/27/2025 |
| DOB NOW | Structural | Permit Issued | RXR CONSTRUCTION SERV LLC | 08/14/2025 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 08/14/2025 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 08/14/2025 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 08/11/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/19/2026 | Signed-off | OCS BUILDERS GROUP LLC | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Samsung AM018FEVDCG 2 tons · Fan Coil Indoor ×1 AM018FEVDCG/AA 2 tons · Vrf Indoor ×3 AM048FCMDCG/AA 48,000 BTU · Vrf Indoor ×2 FTK24AXVJU 2 tons · Fan Coil Indoor ×1 AM018FELDCG/AA 2 tons · Vrf Indoor ×1 Skilaire SAH-240-V3 20 tons · Heat Pump Outdoor ×2 Heating Ventilation Greenheck CSP-A390-VG 220 CFM · Exhaust Fan ×4 |
| 12/01/2025 | Permit Issued | RXR CONSTRUCTION SERV LLC | Air Conditioning Systems | |
| 05/03/2022 | Signed-off | STRUCTURE TONE, LLC | Associated Ducts and Piping | Ducts & Piping N/A N/A Ductwork ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/19/2026 | Signed-off | MJH ENERGY CONSULTING INC | Sprinkler System |
| 10/13/2025 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 1 outlets |
| 04/14/2022 | Permit Issued | PREFERRED SPKLR AND MECH | 430 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/16/2026 | Permit Issued | DUO PLUMBING & HTG CORP. | Water/Sanitary |
| 03/19/2026 | Signed-off | MJH ENERGY CONSULTING INC | Water/Sanitary |
| 02/23/2026 | Signed-off | MJH ENERGY CONSULTING INC | Water/Sanitary |
| 10/13/2025 | — | — | — |
| 08/08/2025 | — | — | Water/Sanitary |
| 02/20/2025 | Permit Issued | MACCARONE PLUMBING INC | Water/Sanitary |
| 06/28/2021 | Signed-off | AARON PLBG AND MECH SYST | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Complete | TF ELECTRICAL CORP | General Wiring |
| 05/21/2026 | Complete | NEWGRANGE ELECTRIC, INC | General Wiring |
| 04/09/2026 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 02/12/2026 | Permit Issued | CANNELLA ELECTRIC INC | — |
| 02/12/2026 | Permit Issued | CANNELLA ELECTRIC INC | — |
| 02/12/2026 | Permit Issued | CANNELLA ELECTRIC INC | — |
| 10/09/2025 | Permit Issued | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 09/30/2025 | Permit Issued | RNH ELECTRIC COMPANY INC | — |
| 09/10/2025 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 06/05/2025 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 01/23/2025 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 10/15/2024 | Complete | P.E. STONE INC | General Wiring |
| 10/05/2024 | Complete | TRIAC ELECTRIC INC | General Wiring |
| 03/01/2024 | Permit Issued | ELPO ELECTRICAL CONTG INC | — |
| 09/25/2023 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/19/2026 | Signed-off | MJH ENERGY CONSULTING INC | Steel, Concrete, Wood |
| 12/11/2025 | Permit Issued | RXR CONSTRUCTION SERV LLC | Steel, Concrete |
| 08/19/2025 | Permit Issued | DNA CONTRACTING LLC | Steel |
| 12/13/2024 | Signed-off | RXR CONSTRUCTION SERV LLC | Steel, Concrete |
| 06/24/2021 | Signed-off | SCHIMENTI CONSTRUCTION CO | Steel, Concrete, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/21/2026 | Permit Issued | LEMX CORP | Scaffold, Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/21/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/04/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/31/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 07/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/10/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/02/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 02/23/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/20/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/17/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/17/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 11/11/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/11/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 11/07/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/27/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/11/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/21/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/21/2023 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 09/18/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/15/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/15/2023 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/22/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/02/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/19/2026 | Final | ERIC BERLENT | progress |
| 03/19/2026 | Heating Systems | ERIC BERLENT | special |
| 03/19/2026 | Exhaust and Vent Systems in Plenums and Ducts | ERIC BERLENT | special |
| 03/19/2026 | Mechanical Systems | ERIC BERLENT | special |
| 03/06/2026 | Final | Jeffrey Taylor | progress |
| 03/03/2026 | Concrete - Cast-In-Place | SAMI HAJJAR P.E | special |
| 03/03/2026 | Structural Steel - High Strength Bolting | SAMI HAJJAR P.E | special |
| 03/03/2026 | Structural Steel - Welding | SAMI HAJJAR P.E | special |
| 03/03/2026 | Structural Stability – Alterations of existing buildings | SAMI HAJJAR P.E | special |
| 03/03/2026 | Final | SAMI HAJJAR P.E | progress |
| 03/03/2026 | Structural Cold-Formed Steel | SAMI HAJJAR P.E | special |
| 03/03/2026 | Post-installed Anchors | SAMI HAJJAR P.E | special |
| 03/03/2026 | Structural Steel - Details | SAMI HAJJAR P.E | special |
| 02/17/2026 | Sprinkler Systems | Nicolas Crosetto | special |
| 02/06/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 01/27/2026 | Post-installed Anchors | nayan soni | special |
| 01/27/2026 | Alternative Materials - OTCR Buildings Bulletin Number | nayan soni | special |
| 01/22/2026 | Final | ERIC BERLENT | progress |
| 01/22/2026 | Fire-Resistance Rated Construction | ERIC BERLENT | progress |
| 01/22/2026 | Sprayed fire-resistant materials | ERIC BERLENT | special |
| 01/22/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 01/22/2026 | Concrete - Cast-In-Place | SAMI HAJJAR P.E | special |
| 01/22/2026 | Post-installed Anchors | SAMI HAJJAR P.E | special |
| 01/22/2026 | Structural Cold-Formed Steel | SAMI HAJJAR P.E | special |
| 01/22/2026 | Structural Stability – Alterations of existing buildings | SAMI HAJJAR P.E | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Ulta | Retail | Floor 1 | Project M01318513 Project M01257971 Project M01255318 Project M01255319 Project M01157042 Project M01157027 Project M01157035 |
| Burlington | Retail | Cellar, Ground, Mezzanine | Project M01236040 |
| Palantir | Office | Floor 6 | Project M00596215 |
| We Work | Office | Floor 7 | Project M00538263 |
| Bed Bath & Beyond | Retail | Cellar, Floor 1, Mezzanine | Project M00417235 |
| Levain Bakery | Restaurant / Food Service | — | Project M00404962 |