← Back
Single or multiple dwelling with stores or offices
6211 8 AVENUE
BROOKLYN · BIN 3141393
💬 Discuss this project
1920Year Built
3Stories
S9Building Class
M1-1Zoning
7,424 sfGross Floor Area
6Units
Rent Stabilized41 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 6211 INC. · 2,000 sf lot · 3.71 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6211 INC403/22/2026
NIC DESIGN MGMT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC305/29/2025
BAYSIDE ENGINEERING PC104/03/2025
J&R DESIGN AND INSPECTION CORP.301/30/2024
CHUN FENG, ARCHITECT111/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO803/21/2026
HIGH QUALITY 338803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor307/08/2026
WINWAY DEVELOPMENT LLCGeneral Contractor207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376305/29/2025
J&R DESIGN AND INSPECTION6637201/30/2024
NKM ENGINEERING PLLC6244211/24/2023
Building Lifecycle
All (141)Filed (8)Permit Issued (6)Signed Off (4)Violation (60)Inspection (8)Objection (25)Special Inspection (30)
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, open)
A
09/03/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR FOR EXISTING EATING & DRINKING ESTABLISHMENT. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01205623-I1
08/07/2025
Permit issued — General Construction
B01205623-I1-MS
08/05/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR FOR EXISTING EATING & DRINKING ESTABLISHMENT. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01205623-S1
07/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
05/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
05/29/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR FOR EXISTING EATING & DRINKING ESTABLISHMENT. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01205623-P1
05/05/2025
Permit issued — Plumbing
B01205623-S1-PL
05/02/2025
Permit issued — General Construction
B01205623-I1-GC
04/29/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR FOR EXISTING EATING & DRINKING ESTABLISHMENT. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01205623-S1
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/15/2025
Objection raised — Mechanical
04/15/2025
Objection resolved — Addressed
04/15/2025
Objection raised — Mechanical
04/15/2025
Objection raised — Cost
04/15/2025
Objection raised — Fire_Protection
04/15/2025
Objection resolved — Addressed
04/15/2025
Objection raised — Mechanical
04/15/2025
Objection resolved — Addressed
04/15/2025
Objection raised — Fire_Protection
04/15/2025
Objection resolved — Addressed
04/03/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR FOR EXISTING EATING & DRINKING ESTABLISHMENT. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01205623-I1
04/03/2025
Special inspection requirement — Lighting controls
Jian Yang
04/03/2025
Special inspection requirement — Maintenance information
Jian Yang
04/03/2025
Special inspection requirement — Mechanical Systems
Jian Yang
04/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
04/03/2025
Special inspection requirement — Final
Jian Yang
04/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
04/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
04/03/2025
Special inspection requirement — Interior lighting power
Jian Yang
03/05/2025
Objection raised — Admin
02/25/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR FOR EXISITNG EATING & DRINKING ESTABLISHMENT. GENERAL CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01186469-I1
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
02/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/25/2025
Special inspection requirement — Mechanical Systems
02/25/2025
Special inspection requirement — Maintenance information
02/25/2025
Special inspection requirement — Lighting controls
02/25/2025
Special inspection requirement — Interior lighting power
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
02/25/2025
Special inspection requirement — Final
11/12/2024
Violation issued (ECB, closed)
Construction
10/30/2024
Signed off — Alteration
INTERIOR RENOVATION OF AN EXISTING MIXED-USE BUILDING WORK ON CELLAR, 1ST FLOOR, WITH REPAIR CEILING, WALL, FLOORING, & PAINTING WORK. AND REMOVING PARTITIONS TO CLEAR ECB VIOLATION 39099313R, 39099320P, 39099332M. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00966137-I1
10/01/2024
Violation issued (HPD, closed)
C
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC08/07/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/05/2025
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC05/02/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION12/13/2023
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION12/13/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/12/2023
BIS—ISSUEDHIGH QUALITY CONSTRUCTION 338INC02/27/2024
BISPLISSUEDPIPESTYLISTS, INC05/06/2019
BISBLISSUEDSASSO MECHANICAL INC08/22/2018
BISPLISSUEDSASSO MECHANICAL INC08/22/2018
BISOTISSUEDFUNG TAI CONSTRUCTION INC07/31/2018
BISPLISSUEDSO PLUMBING & HEATING INC06/04/2018
BISOTISSUEDHIGH QUALITY CONSTRUCTION05/03/2018
BISPLISSUEDTOP PLUMBING GROUP,INC05/03/2018
BIS—ISSUEDNIC DESIGN MGMT INC02/28/2018
BIS—ISSUEDNIC DESIGN MGMT INC11/08/2017
BISEQISSUEDNIC DESIGN MGMT INC11/08/2017
BIS—ISSUEDTSANG CONSTRUCTION, INC01/13/2017
BISEQISSUEDTSANG CONSTRUCTION, INC01/13/2017
BISPLISSUEDSO PLUMBING & HEATING INC09/05/2013
BISEQISSUEDKING'S USA GROUP INC04/05/2013
BIS—ISSUEDKING'S USA GROUP INC04/05/2013
BISOTISSUEDKING'S USA GROUP INC02/15/2013
BISBLISSUEDTOP DOG PLBG & HTG CORP02/11/2013
BISPLISSUEDTOP DOG PLBG & HTG CORP01/29/2013
BISOTISSUEDKING'S USA GROUP INC01/17/2013
1 project · most recent 02/25/2025
Water/Sanitary
FiledStatusContractorScope
02/25/2025——Water/Sanitary
4 projects · most recent 04/10/2026
General Wiring
FiledStatusContractorScope
04/10/2026Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
07/29/2024CompleteE D ELECTRICAL INC8 meters, 1 new_meters
02/21/2024CompleteE D ELECTRICAL INCGeneral Wiring
05/28/2018CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/30/2025Tenant Protection Plan ComplianceJian Yangspecial
05/30/2025Fire-Resistant Penetrations and JointsJian Yangspecial
04/03/2025Lighting controlsJian Yangenergy_progress
04/03/2025Maintenance informationJian Yangenergy_progress
04/03/2025Mechanical SystemsJian Yangspecial
04/03/2025Tenant Protection Plan ComplianceJian Yangspecial
04/03/2025FinalJian Yangprogress
04/03/2025Fire-Resistance Rated ConstructionJian Yangprogress
04/03/2025Energy Code Compliance InspectionsJian Yangprogress
04/03/2025Interior lighting powerJian Yangenergy_progress
02/25/2025Energy Code Compliance Inspections—progress
02/25/2025Tenant Protection Plan Compliance—special
02/25/2025Fire-Resistant Penetrations and Joints—special
02/25/2025Mechanical Systems—special
02/25/2025Maintenance information—energy_progress
02/25/2025Lighting controls—energy_progress
02/25/2025Interior lighting power—energy_progress
02/25/2025Fire-Resistance Rated Construction—progress
02/25/2025Final—progress
08/20/2024Energy Code Compliance InspectionsChun Fengprogress
08/20/2024Tenant Protection Plan ComplianceNARESH MAHANGUspecial
08/20/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/20/2024FinalChun Fengprogress
08/20/2024HVAC-R and service water heating equipmentChun Fengenergy_progress
08/20/2024Interior lighting powerChun Fengenergy_progress
Latest 25 of 47.
▾Documents — 224 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026B00966137-I1Request digital key ↗
08/26/2026B00966067-I1Request digital key ↗
08/22/2026B01186469-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits41
▸BISWORK PERMIT APPLICATION15
02/27/2024322115260Open ↗
05/14/2019320564741Open ↗
07/30/2018340622339Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
12/06/2024322115260Open ↗
10/18/2024322115260Open ↗
02/21/2024322115260Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
09/25/2019320564741Open ↗
09/25/2019320564741Open ↗
09/11/2019320564741Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/01/2024322115260Open ↗
01/11/2019320564741Open ↗
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
02/27/2024322115260Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
04/23/2019320564769Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
01/16/2025322115260Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/15/2025322115260Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B00966137-P1Open ↗
09/02/2026B00966137-P1Open ↗
09/02/2026B00966137-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
09/26/2019320564741Open ↗
05/01/2019321706640Open ↗
04/24/2019321706640Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00966137-I1Open ↗
08/26/2026B00966137-P1Open ↗
08/26/2026B00966067-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B00966137-P1Open ↗
09/02/2026B00966137-P1Open ↗
09/02/2026B00966137-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/17/2019321706640Open ↗
05/04/2018321706640Open ↗
03/26/2013320564741Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/17/2019321706640Open ↗
07/30/2018340622339Open ↗
05/04/2018321706640Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/26/2013320564741Open ↗
01/30/2013320564769Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/30/2018340622339Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/30/2018340622339Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE4
10/24/2013320564741Open ↗
10/02/2013320564741Open ↗
08/29/2013320564741Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/07/2019320564741Open ↗
05/04/2018321706640Open ↗
12/28/2016320564741Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
03/26/2013320564741Open ↗
01/30/2013320564769Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/26/2019320564741Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/13/2019320564741Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/30/2013320564769Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
04/17/2019321706640Open ↗
12/28/2016320564741Open ↗
07/30/2018340622339Open ↗
▸BISSTREET TREE CHECKLIST2
02/23/2024322115260Open ↗
02/21/2024322115260Open ↗
▸BISSTREET TREE SIGNOFF1
01/14/2025322115260Open ↗
▸BISST-1 Street Tree Checklist1
03/26/2013320564741Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026B00966137-I1Open ↗
08/26/2026B00966067-I1Open ↗
08/21/2026B01205623-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/30/2018340622339Open ↗
05/04/2018321706640Open ↗
01/30/2013320564769Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
09/26/2019320564741Open ↗
09/26/2019320564741Open ↗
05/01/2019321706640Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/26/2019320564741Open ↗
04/24/2019321706640Open ↗
11/20/2018340622339Open ↗
▸BISNYCECC ANALYSIS1
07/30/2018340622339Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/26/2013320564741Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/30/2018340622339Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/30/2018340622339Open ↗
▸Inspections & Test Reports3
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
04/24/2019321706640Open ↗
11/20/2018340622339Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/30/2018340622339Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
10/03/2019320564741Open ↗
09/26/2019320564741Open ↗
09/19/2019320564741Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
02/21/2024322115260Open ↗
09/14/2019320564741Open ↗
12/28/2016320564741Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/12/2018320564741Open ↗
06/12/2018320564741Open ↗
09/17/2013320564741Open ↗
▸BISSUPERSEDING LETTER3
05/14/2019320564741Open ↗
05/14/2019320564741Open ↗
11/09/2017320564741Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/26/2013320564741Open ↗
01/30/2013320564769Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
02/23/2024322115260Open ↗
02/21/2024322115260Open ↗
09/26/2019320564741Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION16
12/24/2024322115260Open ↗
10/21/2024322115260Open ↗
09/26/2019320564741Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM8
10/03/2019320564741Open ↗
09/26/2019320564741Open ↗
09/19/2019320564741Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET4
02/21/2024322115260Open ↗
05/04/2018321706640Open ↗
01/22/2013320564741Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/30/2018340622339Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM3
02/23/2024322115260Open ↗
02/21/2024322115260Open ↗
03/26/2013320564741Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/28/2016320564741Open ↗
12/28/2016320564741Open ↗