Two family brick
624 3 STREET
BROOKLYN · BIN 3025480
💬 Discuss this project
1909Year Built
4Stories
B1Building Class
R7BZoning
4,152 sfGross Floor Area
2Units
Two family brick · 1,900 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 16p · 2 filings · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARCHER103/22/2026
J. COSTA CONSTRUCTION, CORP.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW PLBG & HTG CORPPlumbing707/08/2026
WULFING CONSTRUCTION LLCGeneral Contractor607/08/2026
PRO STAR PLBG,HTG&MECH INPlumbing307/08/2026
KURT EBINGERElectrical303/21/2026
J. COSTA CONSTRUCTION CORGeneral Contractor307/08/2026
KURT EBINGER ELEC CONST 002629General Contractor303/22/2026
NEW PLBG HTGGeneral Contractor203/22/2026
BILLY SERVULUSElectrical103/21/2026
SERVULUS BILLYElectrical103/21/2026
SURE ELEC'L CONTR'G CORP.Electrical103/22/2026
KURT EBINGER ELEC CONSTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HARPER ARCHITECTURE, PC6851504/25/2024
D'ANTONIO CONSULTING ENGI931607/29/2022
BARRY STRUCTURAL ENGINEER749107/28/2022
CELIN MUNOZ CONSULTING EN1064211/09/2020
Building Lifecycle
All (99)Filed (15)Permit Issued (12)Signed Off (7)Inspection (3)Objection (32)Special Inspection (30)
05/23/2024
Signed off — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-S1
05/23/2024
Signed off — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-I1
05/13/2024
Signed off — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-S2
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christine Harper
04/25/2024
Filed — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-P2
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christine Harper
04/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/22/2024
Signed off — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-S3
01/31/2024
Permit issued — Plumbing
B00672104-S1-PL
08/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2023
Permit issued — Mechanical Systems
B00672104-S2-MS
03/14/2023
Permit issued — General Construction
B00672104-I1-GC
03/14/2023
Permit issued — Structural
B00672104-S3-ST
02/08/2023
Permit issued — Plumbing
B00672104-S1-PL
01/27/2023
Permit issued — General Construction
B00672104-I1-GC
01/26/2023
Permit issued — Structural
B00672104-S3-ST
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christine Harper
01/20/2023
Special inspection requirement — Fenestration areas
Christine Harper
01/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Christine Harper
01/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Christine Harper
01/20/2023
Special inspection requirement — Fenestration air leakage
Christine Harper
01/20/2023
Special inspection requirement — Air barrier - visual inspection
Christine Harper
01/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Christine Harper
01/20/2023
Special inspection requirement — Final
Christine Harper
01/20/2023
Special inspection requirement — Lighting in dwelling units
Christine Harper
01/16/2023
Filed — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-P1
01/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christine Harper
01/16/2023
Special inspection requirement — Final
Christine Harper
01/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Christine Harper
01/16/2023
Special inspection requirement — Fenestration air leakage
Christine Harper
01/16/2023
Special inspection requirement — Air barrier - visual inspection
Christine Harper
01/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Christine Harper
01/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Christine Harper
01/16/2023
Special inspection requirement — Fenestration areas
Christine Harper
01/16/2023
Special inspection requirement — Lighting in dwelling units
Christine Harper
10/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christine Harper
09/20/2022
Signed off — Alteration
Install Misc AC units and associated ductwork & components throughout. No Change to egress,occupancy or use.
B00209031-I1
09/19/2022
Signed off — Alteration
1. NO CHANGE IN EGRESS OR OCCUPANCY./2 RENOVATION OF AN EXISTING (2) FAMILY, (3) STORY TOWNHOUSE WITH CELLAR & BASEMENT.
B00208976-I1
08/25/2022
Permit issued — Plumbing
B00208976-I1-PL
08/19/2022
Objection raised — Other
08/19/2022
Objection resolved — Addressed
08/19/2022
Objection raised — Other
08/19/2022
Objection resolved — Addressed
08/19/2022
Objection raised — Other
08/19/2022
Objection resolved — Addressed
08/19/2022
Objection raised — Other
08/19/2022
Objection resolved — Addressed
08/19/2022
Objection raised — Other
08/19/2022
Objection resolved — Addressed
08/19/2022
Objection raised — Other
08/19/2022
Objection resolved — Addressed
08/17/2022
Objection raised — Scope
08/17/2022
Objection resolved — Addressed
08/17/2022
Objection raised — Structural
08/17/2022
Objection resolved — Addressed
08/17/2022
Objection raised — Admin
08/17/2022
Objection resolved — Addressed
07/29/2022
Filed — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-S1
07/29/2022
Filed — Alteration
SELECTIVE INTERIOR RENOVATION OF UNIT A; PARTITIONS,GWB,TILEWORK & COSMETIC FINISHES ON 001 & 002. EXTERIOR: REPLACE WINDOWS & DOORS @ FRONT, SIDE & REAR FACADES ON FLOORS 001 TO 004, REPOINT & SEAL BRICK ON FACADES. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
B00672104-S2
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW PLBG & HTG CORP01/31/2024
DOB NOWMechanical SystemsSigned-offWULFING CONSTRUCTION LLC03/14/2023
DOB NOWGeneral ConstructionSigned-offWULFING CONSTRUCTION LLC03/14/2023
DOB NOWStructuralSigned-offWULFING CONSTRUCTION LLC03/14/2023
DOB NOWPlumbingSigned-offNEW PLBG & HTG CORP02/08/2023
DOB NOWGeneral ConstructionSigned-offWULFING CONSTRUCTION LLC01/27/2023
DOB NOWStructuralSigned-offWULFING CONSTRUCTION LLC01/26/2023
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN08/25/2022
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN07/16/2021
DOB NOWStructuralSigned-offJ COSTA CONSTRUCTION COR07/14/2020
DOB NOWMechanical SystemsSigned-offJ COSTA CONSTRUCTION COR07/01/2020
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN02/24/2020
BISOTISSUEDJ. COSTA CONSTRUCTION COR12/02/2020
BISOTISSUEDJ. COSTA CONSTRUCTION COR02/10/2020
BISOTISSUEDJ. COSTA CONSTRUCTION COR02/10/2020
BISEQISSUEDEVEREST SCAFFOLDING INC08/30/2013
BISOTISSUEDPROLOGIC CONSTR OF NY INC01/03/2011
BISPLISSUEDHENRY MYERS P & H, INC01/03/2011
2 projects · most recent 02/21/2023
General Wiring
FiledStatusContractorScope
02/21/2023CompleteKURT EBINGER ELEC CONSTGeneral Wiring
07/09/2021Permit IssuedSURE ELEC'L CONTR'G CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
05/07/2024Fire-Resistant Penetrations and JointsChristine Harperspecial
04/23/2024Fire-Resistant Penetrations and JointsChristine Harperspecial
01/20/2023Air barrier - visual inspectionChristine Harperenergy_progress
01/20/2023Fenestration areasChristine Harperenergy_progress
01/20/2023Fenestration and door U-factor and product ratingsChristine Harperenergy_progress
01/20/2023Fenestration air leakageChristine Harperenergy_progress
01/20/2023Energy Code Compliance InspectionsChristine Harperprogress
01/20/2023FinalChristine Harperprogress
01/20/2023Fire-Resistance Rated ConstructionChristine Harperprogress
01/20/2023Fire-Resistant Penetrations and JointsChristine Harperspecial
01/20/2023Lighting in dwelling unitsChristine Harperenergy_progress
01/16/2023Fire-Resistant Penetrations and JointsChristine Harperspecial
01/16/2023Energy Code Compliance InspectionsChristine Harperprogress
01/16/2023FinalChristine Harperprogress
01/16/2023Fire-Resistance Rated ConstructionChristine Harperprogress
01/16/2023Fenestration areasChristine Harperenergy_progress
01/16/2023Air barrier - visual inspectionChristine Harperenergy_progress
01/16/2023Fenestration and door U-factor and product ratingsChristine Harperenergy_progress
01/16/2023Lighting in dwelling unitsChristine Harperenergy_progress
01/16/2023Fenestration air leakageChristine Harperenergy_progress
10/12/2022Fire-Resistant Penetrations and JointsChristine Harperspecial
07/20/2022FinalMICHAEL BARRYprogress
07/20/2022Structural Steel - DetailsMICHAEL BARRYspecial
07/20/2022Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
07/11/2022Mechanical SystemsGAETANO D'ANTONIOspecial
Latest 25 of 71.
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch6
08/29/2026B00672104-P2Request digital key ↗
08/29/2026B00672104-P1Request digital key ↗
08/29/2026B00672104-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00208976-I1Request digital key ↗
08/15/2026B00208976-P5Request digital key ↗
08/15/2026B00208976-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00209031-P3Request digital key ↗
09/02/2026B00209031-I1Request digital key ↗
08/15/2026B00209031-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00206871-I1Request digital key ↗
08/15/2026B00206871-P1Request digital key ↗
▸Applications & Permits26
▸DOB NOWLPC Approval/Permit15
08/13/2026B00672104-S3Open ↗
08/13/2026B00206871-P1Open ↗
08/13/2026B00208976-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
10/28/2020321076161Open ↗
09/30/2019321993900Open ↗
08/20/2019321076161Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
02/13/2020321076161Open ↗
02/13/2020321993900Open ↗
08/30/2013340081985Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING APPEAL1
11/14/2019321076161Open ↗
▸Seals & Professional Certifications93
▸DOB NOWProgress Inspector Seal & Signature49
09/25/2026B00206871-I1Open ↗
09/02/2026B00672104-P1Open ↗
09/02/2026B00672104-P1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/25/2026B00206871-I1Open ↗
09/02/2026B00672104-P1Open ↗
09/01/2026B00672104-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/02/2026B00209031-P3Open ↗
09/02/2026B00209031-P4Open ↗
09/02/2026B00209031-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/13/2020321076161Open ↗
09/30/2019321993900Open ↗
01/21/2014340081985Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/30/2013340081985Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/30/2013340081985Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2013340081985Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
01/27/2011320234153Open ↗
11/08/2010320234153Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/12/2021321076161Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
08/12/2021321076161Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan5
08/13/2026B00208976-P5Open ↗
08/13/2026B00208976-P4Open ↗
08/13/2026B00208976-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
08/20/2019321076161Open ↗
11/08/2010320234153Open ↗
▸BISTenant Protection Plan and Notes2
09/30/2019321993900Open ↗
08/20/2019321076161Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/02/2026B00209031-P3Open ↗
09/02/2026B00209031-P4Open ↗
09/02/2026B00209031-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/30/2019321993900Open ↗
08/20/2019321076161Open ↗
08/30/2013340081985Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
11/08/2010320234153Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/13/2020321076161Open ↗
09/30/2019321993900Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00672104-S2Open ↗
08/13/2026B00672104-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/12/2021321076161Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/12/2021321076161Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/13/2021321993900Open ↗
08/12/2021321076161Open ↗
08/12/2021321076161Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/13/2021321993900Open ↗
08/13/2021321076161Open ↗
01/21/2014340081985Open ↗
▸BISLANDMARKS SIGNOFF2
08/13/2021321993900Open ↗
08/12/2021321076161Open ↗
▸BISLANDMARKS APPROVAL2
08/30/2013340081985Open ↗
12/10/2010320234153Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/21/2014340081985Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/08/2010320234153Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/13/2021321993900Open ↗
08/12/2021321076161Open ↗
09/30/2019321993900Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
12/29/2020321076161Open ↗
10/30/2019321076161Open ↗
▸BISEFILING COVER SHEET2
09/30/2019321993900Open ↗
08/20/2019321076161Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2013340081985Open ↗
▸Other Documents2
▸BISLAA - Supporting Documentation1
11/15/2019321076161Open ↗
▸BISPLOT DIAGRAM1
08/20/2019321076161Open ↗