← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
625 DRIGGS AVENUE
BROOKLYN · BIN 3427241
💬 Discuss this project
2019Year Built
6Stories
RMBuilding Class
M1-2/R6AZoning
21,202 sfGross Floor Area
6Units
LL97 CoveredRent Stabilized6 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: RS JZ DRIGGS, LLC · 5,000 sf lot · 4.24 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 11p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
305 MCGUINNESS INVESTORS, LLC1307/08/2026
CLUNE CONSTRUCTION303/22/2026
FOREMOST CONTRACTING903/22/2026
RS JZ DRIGG, LLC103/22/2026
CHUNE CONSTRUCTION CO LP103/22/2026
RS JZ DRIGGS, LLC203/22/2026
REDSKY CAPITAL103/22/2026
RS JZ DRIGGS LLC CO REDSKY CAPIT1603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE110/27/2022
NEW YORK DESIGN ARCHITECTS, LLP210/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR203/21/2026
NEW YORK DESIGN ARCHITECTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CKC CONTRACTING CORP DBAElectrical103/22/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
ALCHEMY DEVELOPMENTGeneral Contractor107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
FIVE TOWN NEON SIGN CO INScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957210/21/2022
Building Lifecycle
All (56)Filed (3)Permit Issued (4)Signed Off (3)Violation (32)Inspection (4)Special Inspection (10)
02/01/2026
Violation issued (HPD, open)
C
02/01/2026
Violation issued (HPD, open)
C
02/01/2026
Violation issued (HPD, open)
C
02/01/2026
Violation issued (HPD, open)
C
02/01/2026
Violation issued (HPD, open)
C
12/19/2024
Violation issued (ECB, open)
Construction
04/17/2024
Violation issued (HPD, closed)
A
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2023
Violation issued (HPD, closed)
I
11/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2023
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINE - JUST FOOD FOR DOGS. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B08011440-I1
07/10/2023
Permit issued — Sign
B08011440-I1-SG
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2023
Signed off — Alteration
Application is filed for the work done in new BOH bathroom
B07997354-I1
03/22/2023
Signed off — Alteration
Application is filed for the installation non load bearing partitions, new ceilings, floor and walls finishes on the first floor. Mechanical work associated with installing duct work and louver. No change to use, egress, or occupancy
B07994859-I1
02/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/24/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/02/2022
Permit issued — Sprinklers
B07997354-I1-EW-SP
12/02/2022
Permit issued — Sprinklers
B07997354-I1-PL
11/07/2022
Permit issued — General Construction
B07994859-I1-GC-CX
10/27/2022
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINE - JUST FOOD FOR DOGS. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B08011440-I1
10/27/2022
Special inspection requirement — Final
MOHAMMAD AHEAD
10/21/2022
Filed — Alteration
Application is filed for the work done in new BOH bathroom
B07997354-I1
10/20/2022
Filed — Alteration
Application is filed for the installation non load bearing partitions, new ceilings, floor and walls finishes on the first floor. Mechanical work associated with installing duct work and louver. No change to use, egress, or occupancy
B07994859-I1
09/22/2022
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
09/22/2022
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
09/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
09/22/2022
Special inspection requirement — Lighting controls
Giuseppe Anzalone
09/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
09/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
09/20/2022
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
08/29/2022
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
08/29/2022
Special inspection requirement — Final
Giuseppe Anzalone
03/10/2022
Violation issued (HPD, closed)
A
11/23/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Violation issued (ECB, closed)
Unknown
10/12/2021
Violation issued (ECB, closed)
Construction
10/11/2021
Violation issued (ECB, closed)
Construction
06/05/2020
Violation issued (ECB, closed)
Construction
05/26/2020
Violation issued (ECB, closed)
Construction
01/02/2020
Violation issued (ECB, closed)
Construction
09/30/2019
Violation issued (ECB, closed)
Construction
08/15/2019
Violation issued (ECB, closed)
Construction
07/27/2019
Violation issued (ECB, closed)
Construction
07/27/2019
Violation issued (ECB, closed)
Construction
07/27/2019
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
07/27/2019
Violation issued (ECB, closed)
Construction
05/07/2019
Violation issued (ECB, closed)
Construction
05/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2018
Violation issued (ECB, closed)
Unknown
09/25/2014
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offENRICO PASSARO07/10/2023
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR12/02/2022
DOB NOWSprinklersSigned-offA&H EXPRESS PLBG&HTG CORP12/02/2022
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT11/07/2022
BIS—ISSUEDFOREMOST CONTRACTING & BU03/21/2022
BIS—ISSUEDFOREMOST CONTRACTING & BU03/01/2021
BISEQISSUEDFOREMOST CONTRACTING & BU03/01/2021
BIS—ISSUEDREDLINE CONSTRUCTION & MA02/24/2021
BISEQISSUEDREDLINE CONSTRUCTION & MA02/24/2021
BISPLISSUEDRELIABLE PLBG & HTG CORP09/17/2020
BISEQISSUEDSKYLINE SCAFFOLDING GROUP05/18/2020
BISEQISSUEDFOREMOST CONTRACTING & BU04/20/2020
BIS—ISSUEDFOREMOST CONTRACTING & BU04/20/2020
BISSPISSUEDFIVE BOROUGH NYC LLC10/25/2019
BISPLISSUEDRELIABLE PLBG & HTG CORP10/09/2019
BISEQISSUEDSKYLINE SCAFFOLDING GROUP05/21/2019
BISEQISSUEDFOREMOST CONTRACTING & BU05/15/2019
BIS—RE-ISSUEDFOREMOST CONTRACTING & BU05/01/2019
BIS—RE-ISSUEDFOREMOST CONTRACTING & BU05/01/2019
BISPLISSUEDRELIABLE PLBG & HTG CORP09/19/2018
BIS—ISSUEDFOREMOST CONTRACTING & BU06/01/2018
BIS—ISSUEDFOREMOST CONTRACTING & BU06/01/2018
BISEQISSUEDFOREMOST CONTRACTING & BU06/01/2018
5 projects · most recent 08/16/2023
General Wiring
FiledStatusContractorScope
08/16/2023CompleteDELTA POWER ELECTRICALGeneral Wiring
08/14/2023CompleteALL-RITE ELECT CORP OF NY—
02/02/2022CompleteCKC CONTRACTING CORP DBA—
02/02/2022CompleteCKC CONTRACTING CORP DBA—
02/02/2022CompleteCKC CONTRACTING CORP DBA—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/27/2022FinalMOHAMMAD AHEADprogress
09/22/2022Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
09/22/2022Interior lighting powerGiuseppe Anzaloneenergy_progress
09/22/2022HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
09/22/2022Lighting controlsGiuseppe Anzaloneenergy_progress
09/20/2022Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
09/20/2022Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
09/20/2022Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
08/29/2022Mechanical SystemsGiuseppe Anzalonespecial
08/29/2022FinalGiuseppe Anzaloneprogress
▾Documents — 245 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B07994859-I1Request digital key ↗
08/28/2026B07997354-I1Request digital key ↗
08/28/2026B08011440-I1Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION30
06/30/2023340678779Open ↗
11/04/2021321663151Open ↗
09/10/2021340515464Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION16
05/27/2021321193427Open ↗
03/09/2021321193427Open ↗
03/09/2021321193427Open ↗
Showing 3 of 16 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation5
08/28/2020340515464Open ↗
02/15/2018340515464Open ↗
Showing 2 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
07/30/2021322098626Open ↗
01/30/2018340549400Open ↗
11/15/2017321193427Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM2
01/25/2018321193427Open ↗
11/15/2017321193427Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/23/2024321193427Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
11/15/2017321193427Open ↗
▸BISVERIFY TAX LOT1
09/08/2021321193427Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/13/2024321193427Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/20/2023321193427Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/06/2020321193427Open ↗
01/06/2020321193427Open ↗
01/06/2020321193427Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B08011440-I1Open ↗
08/13/2026B07994859-I1Open ↗
08/13/2026B07997354-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026B08011440-I1Open ↗
08/24/2026B07994859-I1Open ↗
08/24/2026B07994859-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/20/2019340678779Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/20/2019340678779Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/20/2019340678779Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B07994859-I1Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING6
04/06/2021321193427Open ↗
09/26/2019340549400Open ↗
09/15/2019340549400Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
06/12/2023321193427Open ↗
10/14/2021321193427Open ↗
09/07/2021321193427Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/23/2021321663151Open ↗
▸BISEQUIPMENT USE PERMITS1
10/14/2021321193427Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
11/15/2017321193427Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/08/2021321193427Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/08/2021321193427Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
10/27/2017321193427Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/25/2018321193427Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos8
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
05/20/2019340678779Open ↗
02/15/2018340515464Open ↗
01/30/2018340549400Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
04/20/2023340678779Open ↗
04/21/2022321663151Open ↗
04/21/2022340549400Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
10/22/2021321193427Open ↗
10/20/2021321193427Open ↗
10/20/2021321193427Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/31/2018321193427Open ↗
05/29/2018321193427Open ↗
05/29/2018321193427Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY23
10/20/2021321193427Open ↗
10/20/2021321193427Open ↗
10/20/2021321193427Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER7
04/07/2021321193427Open ↗
04/07/2021321193427Open ↗
04/07/2021321193427Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
05/22/2019321193427Open ↗
01/11/2019321193427Open ↗
12/17/2018321193427Open ↗
Showing 3 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
10/24/2018321193427Open ↗
10/10/2018321193427Open ↗
▸Approvals, Objections & Sign-offs19
▸BISSCHEDULE A - OCCUPANCY / USE3
01/07/2021321193427Open ↗
11/06/2017321193427Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/29/2023340678779Open ↗
05/05/2022321663151Open ↗
05/05/2022340549400Open ↗
▸BISSUPERSEDING LETTER3
03/09/2021321193427Open ↗
02/26/2021321193427Open ↗
02/26/2021321193427Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/28/2021321193427Open ↗
05/03/2019321193427Open ↗
11/15/2017321193427Open ↗
▸BISDETERMINATION FORFULLY AUTOMATEDPARKING1
01/25/2018321193427Open ↗
▸BISTOPO IS REQUIRED TO BE SUBMITTED AS PREVIOUSLY REQUESTED OR BCO APPROVAL WILL BE REQUIRED, FINAL TOPO REQUEST.1
08/23/2024321193427Open ↗
▸BISCURB CUT (CC) SIGNOFF1
06/30/2023321193427Open ↗
▸BISOTCR FINAL ACCEPTANCE LETTER1
08/09/2024321193427Open ↗
▸BISOTCR APPROVAL FOR THE PROPOSED AUTOMATEDPARKING1
07/31/2023321193427Open ↗
▸BISMARQUEE (OT) SIGNOFF1
08/07/2024321193427Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
08/07/2024321193427Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE3
11/02/2022321193427Open ↗
11/02/2022321193427Open ↗
05/29/2018321193427Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
05/04/2022321663151Open ↗
05/04/2022340549400Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
05/03/2019321193427Open ↗
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
05/03/2019321193427Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION21
08/26/2024321193427Open ↗
10/01/2021340515464Open ↗
08/05/2021321193427Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET6
07/30/2021322098626Open ↗
Showing 1 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/20/2019340678779Open ↗
Showing 1 of 2 on file for this type
▸BISBOROUGH INTAKE FORM1
05/26/2021321193427Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION3
10/01/2021340515464Open ↗
Showing 1 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMUST RESOLVE1
08/23/2024321193427Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/28/2021321193427Open ↗
▸BISOTCR MONITOR CERTFICATION1
07/31/2024321193427Open ↗