BuildNYC
Elevator cooperative
625 MAIN STREET
MANHATTAN · BIN 1089348
💬 Discuss this project
1975Year Built
18Stories
D4Building Class
R7-2Zoning
—Gross Floor Area
8,088Units
3 Active Violations ▸
Elevator cooperative · Owner of record: Riverwalk 8 Affordable · 1.13 FAR built
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade restoration and roof membrane replacement1 filing
Floor 16Unit 16305p · 1 filing · 9 docs
Floor 15Unit 1530, Unit 153112p · 2 filings · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9306p · 1 filing · 8 docs
Floor 8
Floor 7Unit 7306p · 1 filing · 8 docs
Floor 6Unit 621, Unit 626, Unit 636 +1Under Construction26p · 6 filings · 20 docs
Floor 5Renovate walls, bathrooms, and partitionsUnder Construction11p · 3 filings · 20 docs
Floor 4Under Construction11p · 1 filing · 11 docs
Floor 3Unit 321, Unit 322Under Construction18p · 2 filings · 20 docs
Floor 2
Floor 1Westview Owners CORP.3p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Westview Owners8010/16/2026
Northtown Phase 111 Associateslp1003/21/2026
Island House Tenants609/13/2026
WV Preservation Partners603/21/2026
NY National Bank403/21/2026
Roosevelt Island Operation203/21/2026
Quantum Design103/21/2026
China 1 Kitchen103/21/2026
Rivercross Tenants'103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alan ConstructionGeneral Contractor507/08/2026
CC InteriorGeneral Contractor507/08/2026
XP Decor ContractingGeneral Contractor407/15/2026
Alliance Contracting GroupGeneral Contractor407/08/2026
A.M.NPlumbing307/15/2026
OlegchinyayevGeneral Contractor303/21/2026
John Cappelli Electrical InstallationElectrical203/21/2026
Zaq ConstructionGeneral Contractor203/21/2026
HP ServicesPlumbing207/08/2026
Procore MechanicalPlumbing109/19/2026
GTB General ContractorGeneral Contractor108/20/2026
SF Construction ExpertsGeneral Contractor104/09/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
Apollo Plumbing & HeatingPlumbing106/28/2026
Arco Plumbing and HeatingPlumbing106/28/2026
Highland PlumbingPlumbing107/08/2026
H.K. Mechanical ServicePlumbing107/08/2026
Triza ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metrospec Sia6420208/12/2025
Erik Sun, Architect3010604/14/2025
Reform Architecture9444101/08/2025
Zheng & Associates7330208/15/2024
Building Lifecycle
All (213)Filed (31)Permit Issued (27)Signed Off (9)Violation (60)Inspection (23)Objection (33)Special Inspection (30)
10/15/2026
Filed — Alteration
Facade restoration: brick replacement, repointing of masonry joints, sill replacement, concrete repairs, lintel replacement. Roof membrane replacement only. As per plans. No change in use, egress or occupancy. Not a Green Roof Job.
M01388758-I1
10/09/2026
Special inspection requirement — Energy Code Compliance Inspections
10/01/2026
Objection raised — Inspections
09/23/2026
Filed — Alteration
Apartment Combination Unit # 1830- Unit # 1831, general construction and new finishes. No change to use, egress or occupancy under this application.
M01385508-S3
09/18/2026
Permit issued — Plumbing
M01440456-S1-PL
09/16/2026
Objection resolved — Addressed
09/16/2026
Objection resolved — Addressed
09/16/2026
Objection resolved — Addressed
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/11/2026
Special inspection requirement — Energy Code Compliance Inspections
09/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/09/2026
Objection raised — Inspections
09/09/2026
Objection raised — Scope
09/09/2026
Objection raised — Other
09/02/2026
Filed — Alteration
Apartment Combination Unit # 1830- Unit # 1831, general construction and new finishes. No change to use, egress or occupancy under this application.
M01385508-S2
09/02/2026
Special inspection requirement — Final
08/25/2026
Filed — Alteration
RENOVATION OF APT 322 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01440456-P1
08/25/2026
Filed — Alteration
RENOVATION OF APT 322 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01440456-P2
08/20/2026
Special inspection requirement — Interior lighting power
STUART PHILLIPS
08/20/2026
Special inspection requirement — Final
STUART PHILLIPS
08/20/2026
Special inspection requirement — Lighting in dwelling units
STUART PHILLIPS
08/19/2026
Permit issued — General Construction
M01440456-I1-GC
08/13/2026
Signed off — Alteration
BATH #2 REPLACE TUB, LAV, WC. BATH #1 REPLACE LAV, WC; CAP TUB; ADD NEW SHOWER. KITCHEN REPLACE SINK.
M01187961-I1
08/12/2026
Special inspection requirement — Post-installed Anchors
08/11/2026
Filed — Alteration
RENOVATION OF APT 322 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01440456-I1
08/11/2026
Filed — Alteration
RENOVATION OF APT 322 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01440456-S1
07/14/2026
Permit issued — General Construction
M01360455-I1-GC
07/14/2026
Permit issued — Plumbing
M01360455-S1-PL
06/03/2026
Objection raised — Other
06/03/2026
Objection resolved — Addressed
05/20/2026
Objection resolved — Addressed
05/20/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/07/2026
Objection raised — Other
05/06/2026
Objection raised — Other
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Cost
05/01/2026
Permit issued — General Construction
M01385508-I1-GC
04/29/2026
Filed — Alteration
Plumbing renovations to existing 3-bedroom residence. General construction filed under separate DOB Now application M01360455-I1.
M01360455-S1
04/29/2026
Filed — Alteration
Plumbing renovations to existing 3-bedroom residence. General construction filed under separate DOB Now application M01360455-I1.
M01360455-I1
04/16/2026
Special inspection requirement — Final
ANTHONY ORLANDO
04/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/16/2026
Special inspection requirement — Masonry
04/10/2026
Filed — Alteration
Apartment Combination Unit # 1830- Unit # 1831, general construction and new finishes. No change to use, egress or occupancy under this application.
M01385508-S1
04/10/2026
Filed — Alteration
Apartment Combination Unit # 1830- Unit # 1831, general construction and new finishes. No change to use, egress or occupancy under this application.
M01385508-I1
04/10/2026
Special inspection requirement — Final
Zachary Lewis
03/16/2026
Signed off — Alteration
BATH #2 REPLACE TUB, LAV, WC. BATH #1 REPLACE LAV, WC; CAP TUB; ADD NEW SHOWER. KITCHEN REPLACE SINK.
M01187961-S1
02/22/2026
Special inspection requirement — Lighting controls
ANDREW SESKUNAS
02/22/2026
Special inspection requirement — Lighting in dwelling units
ANDREW SESKUNAS
02/16/2026
Special inspection requirement — Final
ANDREW SESKUNAS
12/18/2025
Signed off — Alteration
RENOVATION OF KITCHEN AND (2) 3-PIECE BATHROOMS. BATH 2: REPLACE LAV, WC,TUB; BATH 1:REPLACE LAV, WC; CAP TUB, INSTALL SHOWER. REPLACE KITCHEN SINK, DW. REPLACE GAS RANGE. ADD WASHING MACHINE. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01088111-S1
12/18/2025
Signed off — Alteration
RENOVATION OF KITCHEN AND (2) 3-PIECE BATHROOMS. BATH 2: REPLACE LAV, WC,TUB; BATH 1:REPLACE LAV, WC; CAP TUB, INSTALL SHOWER. REPLACE KITCHEN SINK, DW. REPLACE GAS RANGE. ADD WASHING MACHINE. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01088111-I1
12/09/2025
Filed — Alteration
BATH #2 REPLACE TUB, LAV, WC. BATH #1 REPLACE LAV, WC; CAP TUB; ADD NEW SHOWER. KITCHEN REPLACE SINK.
M01187961-P1
12/02/2025
Signed off — Alteration
REPLACE LAVATORY, WC, KITCHEN SINK, GAS RANGE. CAP BATHTUB AND INSTALL SHOWER. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01088103-S1
12/02/2025
Signed off — Alteration
REPLACE LAVATORY, WC, KITCHEN SINK, GAS RANGE. CAP BATHTUB AND INSTALL SHOWER. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01088103-I1
11/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2025
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
10/08/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
Latest 60 of 213 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedProcore Mechanical09/18/2026
DOB NOWGeneral ConstructionPermit IssuedGTB General Contractor08/19/2026
DOB NOWGeneral ConstructionPermit IssuedXP Decor Contracting07/14/2026
DOB NOWPlumbingPermit IssuedA.M.N07/14/2026
DOB NOWGeneral ConstructionPermit IssuedAlliance Contracting Group05/01/2026
DOB NOWPlumbingPermit IssuedHP Services09/24/2025
DOB NOWGeneral ConstructionPermit IssuedAlan Construction09/22/2025
DOB NOWGeneral ConstructionPermit IssuedCC Interior07/29/2025
DOB NOWPlumbingPermit IssuedApollo Plumbing & Heating07/17/2025
DOB NOWGeneral ConstructionPermit IssuedAlan Construction07/16/2025
DOB NOWGeneral ConstructionPermit IssuedCC Interior07/03/2025
DOB NOWPlumbingSigned-offA.M.N06/11/2025
DOB NOWGeneral ConstructionSigned-offXP Decor Contracting06/10/2025
DOB NOWGeneral ConstructionPermit IssuedAlliance Contracting Group05/27/2025
DOB NOWPlumbingPermit IssuedArco Plumbing and Heating04/10/2025
DOB NOWGeneral ConstructionPermit IssuedCC Interior02/21/2025
DOB NOWPlumbingSigned-offHighland Plumbing02/18/2025
DOB NOWGeneral ConstructionPermit IssuedOlegchinyayev02/11/2025
DOB NOWGeneral ConstructionSigned-offXP Decor Contracting12/20/2024
DOB NOWPlumbingSigned-offH.K. Mechanical Service12/19/2024
DOB NOWGeneral ConstructionSigned-offAlan Construction12/18/2024
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating11/26/2024
DOB NOWGeneral ConstructionSigned-offSF Construction Experts11/06/2024
DOB NOWPlumbingSigned-offA.M.N10/04/2024
DOB NOWGeneral ConstructionSigned-offXP Decor Contracting10/03/2024
DOB NOWGeneral ConstructionPermit IssuedZaq Construction08/27/2024
DOB NOWPlumbingPermit IssuedHP Services08/27/2024
BISPLISSUEDL & N Plumbing11/15/2022
BISPLISSUEDL & N Plumbing04/04/2022
BISPLISSUEDL & N Plumbing04/04/2022
BISOTISSUEDAlliance Contracting Group12/07/2021
BISOTISSUEDAlliance Contracting Group12/07/2021
BISOTISSUEDAlliance Contracting Group12/07/2021
BISPLISSUEDL & N Plumbing01/24/2020
BISPLISSUEDL & N Plumbing01/24/2020
BISOTISSUEDTotal NYC01/15/2020
BISOTISSUEDTotal NYC01/15/2020
BISOTISSUEDTotal NYC01/15/2020
BISOTISSUEDTotal NYC02/14/2019
BISOTISSUEDTotal NYC01/11/2019
+ 18 more permits on file
8 projects · most recent 09/23/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/23/2026——Gas, Water/Sanitary
08/25/2026Permit IssuedRGL Pro ContractingWater/Sanitary
04/29/2026Permit IssuedK.O.S. Plumbing & Heating, IWater/Sanitary
12/09/2025Signed-offK.O.S. Plumbing & Heating, IWater/Sanitary
03/24/2025Permit IssuedApollo Plumbing & HeatingGas, Water/Sanitary
01/27/2025Permit IssuedArco Plumbing and HeatingGas, Water/Sanitary
01/08/2025Signed-offHighland PlumbingGas, Water/Sanitary
08/15/2024Permit IssuedHP ServicesGas, Water/Sanitary
11 projects · most recent 09/24/2026
General Wiring Boiler Controls
FiledStatusContractorScope
09/24/2026Permit IssuedOcnyc Electrical ContngGeneral Wiring
07/16/2026CompleteTriza Electrical—
09/16/2025CompleteKings Electric CoGeneral Wiring
06/11/2025CompleteBelmont ElectricalGeneral Wiring
04/04/2025CompleteJoseph Weinstein ElectricGeneral Wiring
12/30/2024CompleteTriza ElectricalGeneral Wiring
12/24/2024CompleteTriza Electrical—
11/12/2024CompleteCMY ElectricalGeneral Wiring
10/03/2024CompleteBelmont ElectricalGeneral Wiring
09/12/2024CompleteKJK ElectricGeneral Wiring
10/15/2020CompleteAL-Lectric Elect'l ContractingBoiler Controls
1 project · most recent 10/15/2026
Masonry
FiledStatusContractorScope
10/15/2026——Masonry
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
11/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2025Fail-Final PL - More than 10 Requested FloorsFailView ↗
10/08/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/09/2026Energy Code Compliance Inspections—progress
09/11/2026Fire-Resistant Penetrations and Joints—special
09/11/2026Energy Code Compliance Inspections—progress
09/11/2026Fire-Resistance Rated Construction—progress
09/02/2026Final—progress
08/20/2026Interior lighting powerSTUART PHILLIPSenergy_progress
08/20/2026FinalSTUART PHILLIPSprogress
08/20/2026Lighting in dwelling unitsSTUART PHILLIPSenergy_progress
08/12/2026Post-installed Anchors—special
04/16/2026FinalANTHONY ORLANDOprogress
04/16/2026Structural Stability – Alterations of existing buildings—special
04/16/2026Tenant Protection Plan Compliance—special
04/16/2026Masonry—special
04/10/2026FinalZachary Lewisprogress
02/22/2026Lighting controlsANDREW SESKUNASenergy_progress
02/22/2026Lighting in dwelling unitsANDREW SESKUNASenergy_progress
02/16/2026FinalANDREW SESKUNASprogress
08/25/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
08/25/2025Tenant Protection Plan ComplianceJOSEPH YOUNGspecial
08/25/2025FinalJOSEPH YOUNGprogress
08/25/2025Fire-Resistance Rated ConstructionJOSEPH YOUNGprogress
08/11/2025FinalJOSEPH YOUNGprogress
08/11/2025Tenant Protection Plan ComplianceJOSEPH YOUNGspecial
08/11/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
08/11/2025Fire-Resistance Rated ConstructionJOSEPH YOUNGprogress
Latest 25 of 49.
▾Documents — 326 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
10/16/2026M01388758-I1Request digital key ↗
09/06/2026M01385508-S2Request digital key ↗
08/26/2026M01082177-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits50
▸BISWORK PERMIT APPLICATION27
11/15/2022123676147Open ↗
04/05/2022123511486Open ↗
04/05/2022123442266Open ↗
Showing 3 of 27 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION23
09/29/2022123511486Open ↗
08/23/2022123511486Open ↗
08/23/2022123442266Open ↗
Showing 3 of 23 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/25/2021123908450Open ↗
▸Seals & Professional Certifications104
▸DOB NOWDPL-1: Design Professional Seal & Signature31
10/16/2026M01388758-I1Open ↗
10/05/2026M01385508-S3Open ↗
09/10/2026M01440456-P2Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
10/18/2026M01187961-I1Open ↗
10/18/2026M01187961-I1Open ↗
09/23/2026M01440456-P1Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
10/29/2018122385775Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
04/11/2018123442266Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/18/2026M01187961-I1Open ↗
09/06/2026M01082128-I1Open ↗
09/01/2026M01187935-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
02/13/2019123676147Open ↗
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/18/2009120128147Open ↗
08/18/2009120128138Open ↗
08/18/2009120127460Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/22/2015140442199Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/22/2015140442199Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
03/27/2020123511486Open ↗
03/24/2020123442266Open ↗
03/24/2020123511486Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
03/08/2012120778685Open ↗
02/15/2012120778685Open ↗
04/23/2010120103896Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/23/2022123511486Open ↗
08/04/2011120778685Open ↗
08/17/2009120103896Open ↗
▸BISEQUIPMENT USE PERMITS2
12/08/2010120103896Open ↗
12/08/2010120103896Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/08/2010120103896Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
04/11/2018123442266Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/09/2016122385775Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/09/2016122385775Open ↗
▸Environmental & Asbestos41
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
10/16/2026M01388758-I1Open ↗
10/05/2026M01385508-S3Open ↗
09/10/2026M01440456-P2Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
04/11/2018123442266Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
08/04/2011120778685Open ↗
08/04/2011120778685Open ↗
08/17/2009120103896Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
08/18/2009120128147Open ↗
08/18/2009120128138Open ↗
08/18/2009120127460Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
10/29/2018122385775Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections1
11/16/2011120778685Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/29/2018122385775Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/29/2022123511486Open ↗
08/23/2022123511486Open ↗
12/22/2015140442199Open ↗
▸Approvals, Objections & Sign-offs25
▸BISLETTERS - SUPPORTING DOCUMENTATION9
08/18/2021123908450Open ↗
08/18/2021123908450Open ↗
08/18/2021123908450Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
10/29/2018122385775Open ↗
07/09/2018140442199Open ↗
12/08/2010120103896Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/02/2011120778685Open ↗
08/18/2009120128147Open ↗
08/18/2009120128138Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER4
02/05/2018140442199Open ↗
02/05/2018140442199Open ↗
02/05/2018140442199Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
01/24/2020123442266Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
10/29/2018122385775Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET11
08/04/2021123908450Open ↗
02/08/2019123676147Open ↗
12/17/2018123511486Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION10
09/29/2022123511486Open ↗
08/23/2022123442266Open ↗
01/31/2020123442266Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
04/05/2022123511486Open ↗
04/05/2022123442266Open ↗
08/04/2021123908450Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/22/2015140442199Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
09/11/2015122496897Open ↗
08/05/2011120778685Open ↗
08/05/2011120778685Open ↗
▸BISPLOT DIAGRAM1
08/18/2021123908450Open ↗