← Back
BuildNYC
Car sales/rental with showroom
629 WEST 54TH STREET
MANHATTAN · BIN 1027154
💬 Discuss this project
1930Year Built
6Stories
G8Building Class
M2-4Zoning
152,375 sfGross Floor Area
6Units
LL97 Covered0 Active Violations
Car sales/rental with showroom · Owner of record: 760 12th · 35,145 sf lot · 4.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofVerizon, AT&TUnder Construction20p · 6 filings · 20 docs
Floor 6Rooftop generator addition3p · 1 filing · 5 docs
Floor 5Rooftop generator addition3p · 1 filing · 5 docs
Floor 4Rooftop generator addition3p · 1 filing · 5 docs
Floor 3Rooftop generator addition3p · 1 filing · 5 docs
Floor 2Rooftop generator addition3p · 1 filing · 5 docs
Floor 1Maserati8p · 12 filings · 20 docs
CellarRooftop generator addition4p · 1 filing · 5 docs
Site & exteriorManhattan Jeep11p · 12 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Friedland Properties6907/08/2026
Dennis Co Holdings3707/08/2026
760 12th3503/22/2026
Larstrand903/21/2026
Dylan Joseph Motors203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Structural Consulting Services103/05/2026
Shaaban Engineering909/04/2024
Perry M Petrillo Architects105/30/2024
Azimuth Engineering502/07/2023
Tectonic Engineering206/03/2020
HC Engineering1109/23/2019
Royal T&E109/03/2019
Scalar Architecture107/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services103/21/2026
Kazam Consultants1803/21/2026
Gerald J. Caliendo R.A103/21/2026
AE Design Solution203/21/2026
JP Expedite2203/21/2026
CCM Services Group703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Signs CadSign hanger1107/08/2026
North Shore Neon Sign CoSign hanger907/08/2026
Overland ContractingGeneral Contractor807/08/2026
Spring ScaffoldingScaffold707/08/2026
Ampere Electrical ServicesElectrical303/22/2026
Everest ScaffoldingScaffold203/21/2026
Genmar Electric Cont'gElectrical203/22/2026
Atlas-Acon Electric ServiceElectrical203/21/2026
Johnny's P&H ContractingPlumbing107/08/2026
C.M. Richey Electrical ContractingElectrical103/21/2026
City Electrical Sign ErectorsElectrical103/22/2026
Fast Track Electricspecialty_contractor107/04/2026
Levest Electricspecialty_contractor107/08/2026
RFP ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Structural Consulting Services1919103/05/2026
Trolydia Testing & Inspec4422105/30/2024
Jeremy K McKeon, P.E7263402/07/2023
Tectonic Engineering Cons106206/03/2020
Building Lifecycle
All (217)Filed (32)Permit Issued (33)Signed Off (24)Violation (60)Objection (40)Special Inspection (28)
07/02/2026
Permit issued — Antenna
M01291940-I1-AN
04/09/2026
Objection resolved — Addressed
03/16/2026
Objection raised — Admin
03/05/2026
Filed — Alteration
Modification to existing VERIZON site. Replacement of 9 antennas and 10 RRH units. Installation of 2 new antennas and 3 step-overs.
M01291940-I1
06/25/2025
Permit issued — Suspended Scaffold
M01236231-I1-SC
06/24/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Other
06/18/2025
Filed — Alteration
IRA for the Beta and Gamma sector location inspection
M01236231-I1
02/24/2025
Signed off — Alteration
EXTERIOR ALTERATION CONSISTS OF REMOVING EXISTING METAL PANELS AND REPLACE IN-KIND WITH NEW ALUMINUM COMPOSITE METAL PANELS AND NEW PAINT. Electrical filing under M01062821-i1
M01042562-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "SERVICE EXIT".
M01091965-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " JEEP".
M01092023-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " MANHATTAN".
M01091970-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "JEEP".
M01092021-I1
11/21/2024
Signed off — Alteration
M01092015-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " JEEP".
M01091973-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; READING " MANHATTAN".
M01092029-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN WALL SIGN; COPY READING "SERVICE".
M01092033-I1
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " JEEP".
M01091980-I1
09/06/2024
Permit issued — Sign
M01091965-I1-SG
09/06/2024
Permit issued — Sign
M01092015-I1-SG
09/06/2024
Permit issued — Sign
M01091970-I1-SG
09/06/2024
Permit issued — Sign
M01091980-I1-SG
09/06/2024
Permit issued — Sign
M01091973-I1-SG
09/05/2024
Permit issued — Sign
M01092021-I1-SG
09/05/2024
Permit issued — Sign
M01092029-I1-SG
09/05/2024
Permit issued — Sign
M01092033-I1-SG
09/05/2024
Permit issued — Sign
M01092023-I1-SG
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "SERVICE EXIT".
M01091965-I1
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " JEEP".
M01092023-I1
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " MANHATTAN".
M01091970-I1
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "JEEP".
M01092021-I1
09/04/2024
Filed — Alteration
M01092015-I1
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " JEEP".
M01091973-I1
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; READING " MANHATTAN".
M01092029-I1
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN WALL SIGN; COPY READING "SERVICE".
M01092033-I1
09/04/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING " JEEP".
M01091980-I1
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/28/2024
Special inspection requirement — Final
AHMED SHAABAN
08/26/2024
Permit issued — General Construction
M01042562-I1-GC
07/02/2024
Objection raised — Admin
07/02/2024
Objection resolved — Addressed
06/19/2024
Special inspection requirement — Preliminary
EDWARD TOROSSIAN
06/07/2024
Objection raised — Admin
06/07/2024
Objection resolved — Addressed
06/07/2024
Objection raised — Inspections
06/07/2024
Objection resolved — Addressed
06/07/2024
Objection raised — Scope
06/07/2024
Objection resolved — Addressed
06/07/2024
Objection raised — Scope
06/07/2024
Objection resolved — Addressed
05/30/2024
Filed — Alteration
EXTERIOR ALTERATION CONSISTS OF REMOVING EXISTING METAL PANELS AND REPLACE IN-KIND WITH NEW ALUMINUM COMPOSITE METAL PANELS AND NEW PAINT. Electrical filing under M01062821-i1
M01042562-I1
05/29/2024
Special inspection requirement — Final
EDWARD TOROSSIAN
05/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWARD TOROSSIAN
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 217 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedFast Track Electric07/02/2026
DOB NOWSuspended ScaffoldPermit IssuedPPM Telecom06/25/2025
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/06/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/06/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/06/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/06/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/06/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/05/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/05/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/05/2024
DOB NOWSignSigned-offNorth Shore Neon Sign Co09/05/2024
DOB NOWGeneral ConstructionSigned-offRFP Construction08/26/2024
DOB NOWPlumbingPermit IssuedJohnny Nanhu02/02/2023
DOB NOWMechanical SystemsPermit IssuedOverland Contracting01/16/2023
DOB NOWStructuralPermit IssuedOverland Contracting12/23/2022
DOB NOWAntennaPermit IssuedOverland Contracting11/18/2022
DOB NOWGeneral ConstructionPermit IssuedOverland Contracting05/06/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/02/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/23/2019
DOB NOWSignSigned-offSigns Cad10/03/2019
DOB NOWSignSigned-offSigns Cad09/25/2019
DOB NOWSignSigned-offSigns Cad09/25/2019
DOB NOWSignSigned-offSigns Cad09/25/2019
DOB NOWSignSigned-offSigns Cad09/25/2019
DOB NOWSignSigned-offSigns Cad09/25/2019
DOB NOWSignSigned-offSigns Cad09/24/2019
DOB NOWSignSigned-offSigns Cad09/24/2019
DOB NOWSignSigned-offSigns Cad09/24/2019
DOB NOWSignSigned-offSigns Cad09/24/2019
DOB NOWSignSigned-offSigns Cad09/24/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/03/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding07/19/2019
DOB NOWAntennaSigned-offLevest Electric07/25/2018
BISSPISSUEDAllstate Sprinkler01/22/2021
BISOTISSUEDJC Contracting Management08/07/2020
BISOTISSUEDL.e.c.inc04/24/2020
BISOTISSUEDAutobuilders General Cont06/07/2019
BISOTISSUEDAutobuilders General Cont06/07/2019
BISMHISSUEDAutobuilders General Cont06/07/2019
BISSPISSUEDAllstate Sprinkler05/23/2019
+ 43 more permits on file
1 project · most recent 04/20/2022
Generators
FiledStatusContractorScopeMake / Model / Capacity
04/20/2022Permit IssuedOverland ContractingGenerators
Generators
Polar Power 8220-100-G-20-03 Generator ×1
25 projects · most recent 10/25/2024
General Wiring
FiledStatusContractorScope
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
10/25/2024CompleteCity Electrical Sign Erectors—
06/06/2024CompleteGenmar Electric Cont'gGeneral Wiring
10/17/2023CompleteGenmar Electric Cont'gGeneral Wiring
07/17/2020Permit IssuedLive Wire Electric 1General Wiring
06/29/2020CompleteAmpere Electrical Services—
06/29/2020CompleteAmpere Electrical Services—
11/08/2019CompleteLive Wire Electric 1General Wiring
1 project · most recent 02/07/2023
Steel
FiledStatusContractorScope
02/07/2023Permit IssuedOverland ContractingSteel
1 project · most recent 06/18/2025
FiledStatusContractorScope
06/18/2025Permit IssuedPPM Telecom—
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/28/2024FinalAHMED SHAABANprogress
08/28/2024FinalAHMED SHAABANprogress
08/28/2024FinalAHMED SHAABANprogress
08/28/2024FinalAHMED SHAABANprogress
08/28/2024FinalAHMED SHAABANprogress
08/28/2024FinalAHMED SHAABANprogress
08/28/2024FinalAHMED SHAABANprogress
08/28/2024FinalAHMED SHAABANprogress
06/19/2024PreliminaryEDWARD TOROSSIANprogress
05/29/2024FinalEDWARD TOROSSIANprogress
05/14/2024Structural Stability – Alterations of existing buildingsEDWARD TOROSSIANspecial
03/03/2023Structural Steel - High Strength BoltingJeremy McKeonspecial
03/03/2023Structural Steel - DetailsJeremy McKeonspecial
03/03/2023FinalJeremy McKeonprogress
12/22/2022Structural Steel - High Strength BoltingJeremy McKeonspecial
12/22/2022Structural Steel - DetailsJeremy McKeonspecial
12/22/2022FinalJeremy McKeonprogress
04/20/2022Post-installed AnchorsJeremy McKeonspecial
04/20/2022Fire-Resistant Penetrations and JointsJeremy McKeonspecial
01/31/2022FinalJeremy McKeonprogress
01/31/2022Mechanical SystemsJeremy McKeonspecial
09/06/2019FinalHackjong Choiprogress
09/06/2019FinalHackjong Choiprogress
09/06/2019FinalHackjong Choiprogress
09/06/2019FinalHackjong Choiprogress
Latest 25 of 28.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VerizonTelecom siteRoof
Project M01291940 Alteration · Permit Entire · 03/05/2026
AT&TTelecom siteRoof
Project M01236231 Alteration · Permit Entire · 06/18/2025
Manhattan JeepAutomotive / fuelFloor 1
Project M01092015 Alteration · LOC Issued · 09/04/2024
Project M01042562 Alteration · LOC Issued · 05/30/2024
MaseratiRetailFloor 1
Project M00223150 Alteration · LOC Issued · 09/23/2019
Project M00223162 Alteration · LOC Issued · 09/19/2019
Project M00223178 Alteration · LOC Issued · 09/19/2019
Project M00223210 Alteration · LOC Issued · 09/19/2019
Project M00223220 Alteration · LOC Issued · 09/19/2019
Project M00223232 Alteration · LOC Issued · 09/19/2019
Project M00223242 Alteration · LOC Issued · 09/19/2019
Project M00223251 Alteration · LOC Issued · 09/19/2019
Project M00223257 Alteration · LOC Issued · 09/19/2019
Project M00223270 Alteration · LOC Issued · 09/19/2019
Project M00223283 Alteration · LOC Issued · 09/19/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 830 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch18
09/02/2026M00671966-I1Request digital key ↗
09/02/2026M00671943-I1Request digital key ↗
08/31/2026M00671988-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sign11
09/05/2026M00223210-I1Request digital key ↗
09/05/2026M00223162-I1Request digital key ↗
09/05/2026M00223242-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00191108-I1Request digital key ↗
09/05/2026M00220313-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
08/15/2026M00003838-I1Request digital key ↗
08/14/2026M00003838-P1Request digital key ↗
▸Applications & Permits141
▸BISWORK PERMIT APPLICATION70
05/04/2020123840362Open ↗
04/29/2020123840362Open ↗
04/17/2020123840362Open ↗
Showing 3 of 70 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION69
02/01/2021123731499Open ↗
01/28/2021123731499Open ↗
02/28/2020123840362Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M00671988-I1Open ↗
08/13/2026M00671988-P1Open ↗
▸Seals & Professional Certifications207
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION92
03/20/2020123840362Open ↗
02/28/2020123840362Open ↗
08/16/2019123811633Open ↗
Showing 3 of 92 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/05/2026M00223210-I1Open ↗
09/05/2026M00223162-I1Open ↗
09/05/2026M00223257-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
08/16/2019123811633Open ↗
04/10/2019123731499Open ↗
04/10/2019123731480Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
10/09/2026M01092029-I1Open ↗
09/26/2026M01092033-I1Open ↗
09/01/2026M00671988-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
08/16/2019123811633Open ↗
04/10/2019123731499Open ↗
04/10/2019123731499Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00671988-I1Open ↗
09/01/2026M00671905-I1Open ↗
08/29/2026M00671988-P1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment51
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS9
05/19/2021123731499Open ↗
05/19/2021123731499Open ↗
05/19/2021123731499Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/04/2019123859896Open ↗
09/30/2019123859896Open ↗
09/30/2019123731499Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
05/19/2021123731499Open ↗
05/19/2021123731499Open ↗
05/19/2021123731499Open ↗
Showing 3 of 6 on file for this type
▸BISSIGN HANGER CERTIFICATE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
04/02/2021123034475Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection49
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist31
09/05/2026M00223210-I1Open ↗
09/05/2026M00223162-I1Open ↗
09/05/2026M00223150-I1Open ↗
Showing 3 of 31 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON10
03/20/2020123840362Open ↗
08/16/2019123811633Open ↗
04/10/2019123731480Open ↗
Showing 3 of 10 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M00671988-P1Open ↗
08/13/2026M00671988-I1Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
11/09/2017123169784Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/10/2019123731499Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00220313-I1Open ↗
▸Environmental & Asbestos52
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
02/28/2020123840362Open ↗
08/16/2019123811633Open ↗
04/10/2019123034475Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026M00671966-I1Open ↗
09/02/2026M00671943-I1Open ↗
08/31/2026M00671988-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/18/2018123515286Open ↗
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
03/20/2020123840362Open ↗
02/28/2020123840362Open ↗
08/16/2019123811633Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
06/22/2021123840362Open ↗
03/03/2021123811633Open ↗
02/04/2021123731499Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/22/2021123840362Open ↗
03/03/2021123811633Open ↗
02/04/2021123731499Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE 2ND REVIEW1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY15
06/22/2021123840362Open ↗
03/03/2021123811633Open ↗
03/03/2021123811633Open ↗
Showing 3 of 15 on file for this type
▸Approvals, Objections & Sign-offs69
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST39
06/22/2021123840362Open ↗
05/12/2021123731499Open ↗
04/20/2021123034475Open ↗
Showing 3 of 39 on file for this type
▸BISADMINISTRATIVE OBJECTIONS26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership77
▸BISCOST AFFIDAVIT77
06/22/2021123840362Open ↗
04/20/2021123034475Open ↗
03/03/2021123811633Open ↗
Showing 3 of 77 on file for this type
▸Filing & Intake Forms70
▸BISEFILING COVER SHEET41
02/28/2020123840362Open ↗
08/16/2019123811633Open ↗
04/10/2019123034475Open ↗
Showing 3 of 41 on file for this type
▸BISADDITIONAL INFORMATION14
02/01/2021123731499Open ↗
08/07/2020123811633Open ↗
10/04/2019123859896Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM12
05/04/2020123840362Open ↗
04/29/2020123840362Open ↗
04/17/2020123840362Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
08/16/2019123811633Open ↗
08/16/2019123811633Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
08/15/2026M00003838-I1Open ↗
08/13/2026M00003838-P1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
08/15/2026M00003838-I1Open ↗
08/13/2026M00003838-P1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01236231-I1Open ↗