← Back
Elevator apt, semi-fireproof with stores
The 63-68 Austin Street Condominium
91-32 63 DRIVE · BIN 4072830
💬 Discuss this project
2022Year Built
9Stories
D7Building Class
—Zoning
79,081 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: AUSTIN PLAZA LLC · 13,725 sf lot · 5.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 3 filings · 20 docs
Floor 659p · 1 filing · 20 docs
Floor 559p · 1 filing · 20 docs
Floor 459p · 1 filing · 20 docs
Floor 363p · 1 filing · 20 docs
Floor 262p · 1 filing · 20 docs
Floor 1Under Construction103p · 4 filings · 20 docs
Cellar60p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRS CONSTRUCTION1608/29/2026
TRI BOROUGH SCAFFOLDING607/08/2026
AAA GENERAL CONSTRUCTION CORP12507/08/2026
DOB SERVICES704/09/2026
PLATINUM303/22/2026
AUSTIN PLAZA1003/22/2026
CONSTRUCTION AAA GENERAL503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2021$10.5M—— → —— not available
11/15/2018$6.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING1003/21/2026
Rigid Structural Design, LLC703/21/2026
ANGELO NG + ANTHONY NG ARCHITECTS4303/21/2026
DAL H CHUN ENGINEER PC203/21/2026
METRO VIBE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAA GENERAL CONSTRUCTIONGeneral Contractor3807/08/2026
RRP PLUMBING CORPFire Protection607/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor507/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor507/08/2026
FRSS GROUP CORPGeneral Contractor407/08/2026
AB CAPSTONE BUILDERS CORPGeneral Contractor303/21/2026
NY BUILDING ASSOCIATES INGeneral Contractor304/09/2026
A1 SPECIALIZED, INCScaffold207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
AMERICAN STANDARD PLUMBINPlumbing203/22/2026
RRP PLUMBING CORPPlumbing207/08/2026
S & L PLUMBING INCPlumbing203/22/2026
ZAQ CONSTRUCTION INCGeneral Contractor104/09/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
THOMAS F. CASH & SONS INCPlumbing107/08/2026
ERIC & NG ELEC'L, INC.Electrical103/22/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
JOSEPH HUANGElectrical103/21/2026
HI-RITE ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330606/30/2026
WORLD DESIGN ARCHITECTURE9323805/07/2026
AA BUILDING & INSPECTION1519102/18/2026
Z & T ENGINEERING, P.C.5912112/18/2025
QWA STUDIO9293309/02/2025
SHIGUANG ARCHITECTURE P.C9279309/02/2025
Building Lifecycle
All (300)Filed (48)Permit Issued (47)Signed Off (21)Violation (48)Inspection (28)Objection (78)Special Inspection (30)
07/01/2026
Signed off — Alteration
INTERIOR RENOVATION AND INSTALL MECHANICAL SYSTEM AS SHOWN ON PLAN ONLY @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273630-I1
07/01/2026
Special inspection requirement — Final
ADEL SAGEER
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
07/01/2026
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
07/01/2026
Special inspection requirement — Metering
Jinfar Liu
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
07/01/2026
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
07/01/2026
Special inspection requirement — Mechanical Systems
Jinfar Liu
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
06/30/2026
Filed — Alteration
INTERIOR RENOVATION AND INSTALL MECHANICAL SYSTEM AS SHOWN ON PLAN ONLY @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273630-P2
06/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2026
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
06/15/2026
Special inspection requirement — Metering
Jinfar Liu
06/15/2026
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
06/15/2026
Special inspection requirement — Final
ADEL SAGEER
06/15/2026
Special inspection requirement — Mechanical Systems
Jinfar Liu
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/09/2026
Permit issued — General Construction
Q01348400-I1-GC-CX
06/05/2026
Signed off — Alteration
EXISTING SPRINKLER HEADS TO BE DROPPED DOWN 3' @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273657-I1
06/05/2026
Signed off — Alteration
EXISTING SPRINKLER HEADS TO BE DROPPED DOWN 3' @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273657-S1
05/14/2026
Special inspection requirement — Final
William Alicea
05/14/2026
Special inspection requirement — Mechanical Systems
William Alicea
05/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/11/2026
Violation issued (HPD, closed)
A
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/07/2026
Filed — Alteration
FILING FOR MECHANICAL WORK AS PER PLANS
Q01300869-P3
05/07/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
Q01278238-P3
05/07/2026
Special inspection requirement — Mechanical Systems
William Alicea
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/07/2026
Special inspection requirement — Final
William Alicea
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
04/14/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/06/2026
Signed off — Alteration
INSTALL SPLIT HEAT PUMP SYSTEM (1 OUTDOOR, 8 INDOOR) WITH DUCTWORK, PIPING, DIFFUSERS & CONTROLS; PROVIDE OUTSIDE AIR INTAKE FAN WITH DUCTWORK/CONTROL; CONNECT TOILET/LOCKER EXHAUST TO BASE BUILDING DUCTWORK.
Q01274132-I1
03/30/2026
Signed off — Alteration
INSTALL SPLIT HEAT PUMP SYSTEM (1 OUTDOOR, 8 INDOOR) WITH DUCTWORK, PIPING, DIFFUSERS & CONTROLS; PROVIDE OUTSIDE AIR INTAKE FAN WITH DUCTWORK/CONTROL; CONNECT TOILET/LOCKER EXHAUST TO BASE BUILDING DUCTWORK.
Q01274132-S4
03/27/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
Q01278238-P1
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
03/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Signed off — Alteration
INSTALL SPLIT HEAT PUMP SYSTEM (1 OUTDOOR, 8 INDOOR) WITH DUCTWORK, PIPING, DIFFUSERS & CONTROLS; PROVIDE OUTSIDE AIR INTAKE FAN WITH DUCTWORK/CONTROL; CONNECT TOILET/LOCKER EXHAUST TO BASE BUILDING DUCTWORK.
Q01274132-S3
02/18/2026
Filed — Alteration
Q01348400-I1
02/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/21/2026
Permit issued — Sprinklers
Q01273657-S1-EW-SP
01/15/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/09/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/31/2025
Permit issued — Sign
Q01320861-I1-SG
12/24/2025
Filed — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON WALL FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01320861-I1
12/18/2025
Filed — Alteration
EXISTING SPRINKLER HEADS TO BE DROPPED DOWN 3' @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273657-P1
12/18/2025
Filed — Alteration
INTERIOR RENOVATION AND INSTALL MECHANICAL SYSTEM AS SHOWN ON PLAN ONLY @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273630-P1
12/18/2025
Filed — New Building
Proposed 9 story Affordable housing project. Developmental HUB consultation was held & accepted on November 4th, 2021, please assign to Affordable Housing Unit at Developmental HUB.
Q00627197-B5
12/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/14/2025
Filed — Alteration
FILING FOR MECHANICAL WORK AS PER PLANS
Q01300869-P2
12/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
12/12/2025
Special inspection requirement — Mechanical Systems
Jinfar Liu
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
12/12/2025
Special inspection requirement — Mechanical Systems
William Alicea
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFRSS GROUP CORP06/09/2026
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC01/21/2026
DOB NOWSignPermit IssuedMAD SIGNS INC12/31/2025
DOB NOWSignSigned-offMAD SIGNS INC11/17/2025
DOB NOWMechanical SystemsPermit IssuedFRSS GROUP10/31/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/29/2025
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN10/29/2025
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN10/09/2025
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN10/09/2025
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC09/12/2025
DOB NOWGeneral ConstructionPermit IssuedFRSS GROUP09/10/2025
DOB NOWGeneral ConstructionSigned-offZAQ CONSTRUCTION INC08/29/2025
DOB NOWPlumbingSigned-offTHOMAS F. CASH & SONS INC08/29/2025
DOB NOWConstruction FenceSigned-offAAA GENERAL CONSTRUCTION06/21/2024
DOB NOWSupport of ExcavationSigned-offAAA GENERAL CONSTRUCTION06/20/2024
DOB NOWGeneral ConstructionPermit IssuedAAA GENERAL CONSTRUCTION05/01/2024
DOB NOWMechanical SystemsSigned-offAAA GENERAL CONSTRUCTION02/20/2024
DOB NOWCurb CutSigned-offAAA GENERAL CONSTRUCTION02/14/2024
DOB NOWGeneral ConstructionPermit IssuedAAA GENERAL CONSTRUCTION02/07/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.02/06/2024
DOB NOWPlumbingSigned-offRRP PLUMBING CORP02/06/2024
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.02/06/2024
DOB NOWStructuralSigned-offAAA GENERAL CONSTRUCTION02/05/2024
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.09/01/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC07/12/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/12/2023
DOB NOWConstruction FenceSigned-offAAA GENERAL CONSTRUCTION06/22/2023
DOB NOWSupport of ExcavationSigned-offAAA GENERAL CONSTRUCTION06/21/2023
DOB NOWEarth WorkSigned-offAAA GENERAL CONSTRUCTION06/21/2023
DOB NOWGeneral ConstructionPermit IssuedAAA GENERAL CONSTRUCTION01/06/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP01/05/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.01/05/2023
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.01/05/2023
DOB NOWStructuralSigned-offAAA GENERAL CONSTRUCTION10/18/2022
DOB NOWGeneral ConstructionPermit IssuedAAA GENERAL CONSTRUCTION10/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING10/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offAAA GENERAL CONSTRUCTION09/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offAAA GENERAL CONSTRUCTION09/19/2022
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.09/15/2022
+ 11 more permits on file
2 projects · most recent 06/30/2026
Ventilation Systems Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2026Signed-offZAQ CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin DAIKIN-DFG1203DH00001S Furnace ×1
Ventilation
Greenheck GREENHECK-CUBE-140-4122GQD-DR2 1,666 CFM · Exhaust Fan ×1
12/18/2025Signed-offAAA GENERAL CONSTRUCTIONAir Conditioning Systems, Ventilation Systems
Cooling
Islandaire EZLT09B2C1S45AB 9,300 BTU · Ptac ×108
EZLT12B2C1S45AB 11,800 BTU · Ptac ×1
Mitsubishi Electric MXZ-3C30NAHZ4-U1 30,000 BTU · Vrf Outdoor ×2
MXZ-3C24NAHZ2-U1 22,000 BTU · Vrf Outdoor ×1
MXZ-SM36NAMHZ 36,000 BTU · Vrf Outdoor ×1
Carrier 48FCFM12A2A5A0A0A0 10 tons · Rooftop Unit ×2
48TCED12A2A5A0A0G0 10 tons · Rooftop Unit ×1
Gree GMV-12WP/A-T(U) 1 tons · Vrf Outdoor ×1
Ventilation
Greenheck SP-LP0511 50 CFM · Exhaust Fan ×101
CUE-080-VG 200 CFM · Exhaust Fan ×4
CUE-099-VG 800 CFM · Exhaust Fan ×3
CUE-100-VG 1,000 CFM · Exhaust Fan ×3
CUE-100HP-VG 400 CFM · Exhaust Fan ×3
CUE-120-VG 1,400 CFM · Exhaust Fan ×3
CUE-095-VG 450 CFM · Exhaust Fan ×2
USF-24-B7 7,125 CFM · Exhaust Fan ×2
CUE-070-VG 150 CFM · Exhaust Fan ×1
CUE-090-VG 300 CFM · Exhaust Fan ×1
CUE-140-VG 1,800 CFM · Exhaust Fan ×1
SQ-90-VG 450 CFM · Exhaust Fan ×1
1 project · most recent 12/18/2025
Sprinkler System
FiledStatusContractorScope
12/18/2025Signed-offRRP PLUMBING CORPSprinkler System
2 projects · most recent 05/07/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
05/07/2026Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
12/18/2025Signed-offRRP PLUMBING CORPGas, Storm, Water/Sanitary
13 projects · most recent 08/19/2026
General Wiring Lighting
FiledStatusContractorScope
08/19/2026Permit IssuedSEGA ELECTRIC LLCGeneral Wiring
12/23/2025CompleteVOLTRON ELECTRIC LLC—
10/23/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
10/08/2025Permit IssuedNAS ELECTRIC CORPGeneral Wiring
09/26/2025CompleteVOLTRON ELECTRIC LLC—
09/26/2025CompleteVOLTRON ELECTRIC LLC—
10/18/2024CompleteERIC & NG ELEC'L, INC.1 meters, 1 new_meters
09/24/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring, Lighting
07/17/2024CompleteR.C.M. ELECTRIC CORP.—
09/13/2023CompletePOWER SURGE ELECTRIC, INC—
09/02/2022CompleteNASH ELECTRIC SERVICES IN—
08/25/2022CompleteNASH ELECTRIC SERVICES IN—
02/22/2022CancelledERIC & NG ELEC'L, INC.General Wiring
1 project · most recent 12/18/2025
FiledStatusContractorScope
12/18/2025Signed-offAAA GENERAL CONSTRUCTION2 scope_items
1 project · most recent 12/18/2025
Earthwork
FiledStatusContractorScope
12/18/2025Signed-offAAA GENERAL CONSTRUCTIONEarthwork
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
06/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/15/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/09/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Pass-Final SD - Fire PumpPassView ↗
12/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/27/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/24/2024Pass-Final SD - Fire PumpPassView ↗
10/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/01/2026Energy Code Compliance InspectionsJinfar Liuprogress
07/01/2026FinalADEL SAGEERprogress
07/01/2026Tenant Protection Plan ComplianceJinfar Liuspecial
07/01/2026Lighting in dwelling unitsJinfar Liuenergy_progress
07/01/2026MeteringJinfar Liuenergy_progress
07/01/2026Electrical motors and elevatorsJinfar Liuenergy_progress
07/01/2026Mechanical SystemsJinfar Liuspecial
07/01/2026Fire-Resistant Penetrations and JointsJinfar Liuspecial
06/15/2026Lighting in dwelling unitsJinfar Liuenergy_progress
06/15/2026MeteringJinfar Liuenergy_progress
06/15/2026Electrical motors and elevatorsJinfar Liuenergy_progress
06/15/2026Mechanical SystemsJinfar Liuspecial
06/15/2026Tenant Protection Plan ComplianceJinfar Liuspecial
06/15/2026FinalADEL SAGEERprogress
06/15/2026Energy Code Compliance InspectionsJinfar Liuprogress
06/15/2026Fire-Resistant Penetrations and JointsJinfar Liuspecial
05/14/2026FinalWilliam Aliceaprogress
05/14/2026Tenant Protection Plan Compliance—special
05/14/2026Mechanical SystemsWilliam Aliceaspecial
05/08/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/07/2026Tenant Protection Plan Compliance—special
05/07/2026FinalWilliam Aliceaprogress
05/07/2026Mechanical SystemsWilliam Aliceaspecial
05/06/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
03/10/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
Latest 25 of 150.
▾Documents — 478 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch53
08/26/2026Q00786935-I1Request digital key ↗
08/25/2026Q00799270-I1Request digital key ↗
08/25/2026Q00627197-I1Request digital key ↗
Showing 3 of 53 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00143604-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION8
05/13/2025421842368Open ↗
10/04/2024440731594Open ↗
08/23/2024440799085Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD - Permit Notice4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening2
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
10/27/2023440731594Open ↗
06/18/2022440731594Open ↗
▸BISWORK PERMIT APPLICATION2
09/05/2023440799085Open ↗
06/25/2019421890804Open ↗
▸BISDOT 410 PERMITS FOR ADA RAMPS AT CORNERS1
07/28/2025440731594Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications230
▸DOB NOWProgress Inspector Seal & Signature105
09/27/2026Q01274132-I1Open ↗
09/27/2026Q01274132-I1Open ↗
09/23/2026Q01274132-S3Open ↗
Showing 3 of 105 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature66
09/27/2026Q01274132-I1Open ↗
09/27/2026Q01274132-I1Open ↗
09/23/2026Q01274132-S3Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature55
08/25/2026Q00627197-S8Open ↗
08/25/2026Q00627197-I1Open ↗
08/25/2026Q00627197-S3Open ↗
Showing 3 of 55 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISELECTRIC CUT-OFF1
06/25/2019421890804Open ↗
▸BISSEWER CUT-OFF1
06/25/2019421890804Open ↗
▸BISGAS CUT-OFF1
06/25/2019421890804Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection20
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/25/2019421890804Open ↗
06/25/2019421890804Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT2
08/04/2025440731594Open ↗
07/28/2025440731594Open ↗
▸BISSTREET TREE SIGNOFF1
01/30/2025440731594Open ↗
▸BISSTREET TREE CHECKLIST1
06/18/2022440731594Open ↗
▸BISSTREET TREES SITE PLAN1
03/27/2025440731594Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
09/05/2023440799085Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/25/2019421890804Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/25/2019421890804Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos33
▸DOB NOWOER: Notice to Proceed19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/25/2019421890804Open ↗
▸BISRODENT CONTROL1
06/25/2019421890804Open ↗
▸Energy Compliance9
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/24/2024440799085Open ↗
08/23/2023440799085Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/24/2024440799085Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
09/25/2024440799085Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/23/2023440799085Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/23/2023440799085Open ↗
▸Inspections & Test Reports17
▸DOB NOWSOIL REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/24/2024440799085Open ↗
08/23/2023440799085Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
07/28/2025440731594Open ↗
▸BISBPP: FIELD INSPECTION1
07/28/2025440731594Open ↗
▸Approvals, Objections & Sign-offs8
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
08/04/2025440731594Open ↗
07/28/2025440731594Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/27/2023440731594Open ↗
06/25/2019421890804Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM2
06/25/2019421890804Open ↗
06/25/2019421890804Open ↗
▸BISLANDMARKS APPROVAL1
06/25/2019421890804Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/25/2024440799085Open ↗
▸Cost, Insurance & Ownership6
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction3
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
01/30/2025440731594Open ↗
▸BISCOST AFFIDAVIT2
09/24/2024440799085Open ↗
08/23/2023440799085Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/25/2019421890804Open ↗
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸BISADDITIONAL INFORMATION2
09/06/2024440799085Open ↗
08/23/2023440799085Open ↗
▸BISEFILING COVER SHEET2
12/10/2025421842368Open ↗
03/20/2019421890804Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/18/2022440731594Open ↗
▸Other Documents47
▸DOB NOWProperty Ownership Certification11
08/25/2026Q00627197-I1Open ↗
08/25/2026Q00627197-P1Open ↗
08/25/2026Q00627197-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSite Survey: Initial7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION6
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
03/27/2025440731594Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
07/28/2025440731594Open ↗
07/28/2025440731594Open ↗
04/07/2025421842368Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
01/30/2025440731594Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/07/2025421842368Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD - Completion Notice1
08/25/2026Q00627197-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type