ECB06/29/2026CONSTRUCTION ACTIVITY WAS STOPPED ON 4/29/26 UNDER COMPLAINT 4A33253 AT TIME OF MY INSPECTION OBSERVED WORK HAS CONTINUED, BUILDING IS 2/3RD DEMOLISHED CONTRARY TO COMMISSIONERS STOP WORK ORDER. STOP ALL WORK,$10K due
HPD05/07/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB05/01/2026BC3303.2.4 SANITARY FACILITIES: DURING INSPECTION OF AN ACTIVE DEMO SITE WITH WORKERS ONSITE PERFORMING HOUSEKEEPING I OBSERVED THAT THERE WAS NO SANITARY FACILITIES ONSITE FOR THE WORKERS TO RELIEVE THEMSELVES$10K due
ECB04/29/2026BC3301.2 OVER HEAD PROTECTION: DURING INSPECTION OF AN ACTIVE DEMO SITE, I OBSERVED FROM THE ADJACENT PROPERTY PARKING LOT THAT THERE WAS NO OVER HEAD PROTECTION IN PLACE FOR THE CARS WHILE PORTIONS OF THE BUIL$5K due
ECB04/29/2026DURING INSPECTION OF AN ACTIVE DEMO SITE OF A 3 STORY BRICK BUILDING, THERE WAS A LARGE AMOUNT OF BRICK PILED UP ON THE GROUND FLOOR AROUND THE SHORING & WALKWAY. MATERIAL ON THE STAIRS CREATED A TRIP & FALL HA$3K due
ECB03/23/2026ACTIVE JOB PERMIT# Q01197238-I1-FD EXPIRES ON 3/27/26 ALSO PERMIT # Q01197238-S2-FN EXPIRES 3/27/2026 ARE NOT POSTED AT THE PREMISES AT TIME OF INSPECTION OBSERVED EXPIRED PERMITS POSTED ON THE PLYWOOD FENCE VA$2K due
ECB01/20/2026PERFORMED DEMO MONITORING INSPECTION ON PROPOSED DEMOLITION OF 3-STORY HOUSE. OBSERVED PUBLIC SIDEWALK WITH SNOW AND FROZEN ICY CONDITIONS CAUSING A POSSIBLE SLIPPING HAZARD. REFERENCE 2022 BUILDING CODE (3303.$10K due
HPD11/21/2025§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
ECB10/08/2025RESPONDENT FAILED TO CORRECT THE CONDITIONS CITED IN VIOLATION #39518650L. COMPLIANCE HAS NOT BEEN MET.$1K due
ECB08/13/2025GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DOB NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39518650L ISSUED 07/01/2023.$1K due
ECB06/17/2025DURING INSPECTION OF A STALLED SITE, I OBSERVED THE CONSTRUCTION FENCE PERMIT WAS EXPIRED SINCE JULY 22 2023 WITH NO RENEWAL IN PROCESS. PERMITS MUST BE KEPT ACTIVE WHEN TEMPORARY EQUIPMENT IS ONSITE. OBTAIN A$1K due
ECB06/17/2025DURING INSPECTION OF A STALLED SITE WITH A CONSTRUCTION FENCE IN PLACE, I OBSERVED THAT THE FENCE GATE WAS LEANING OUT OF PLUMB, AND PART OF THE FENCE WAS OPEN AGAPE AT EX#4 MAKING THE SITE ACCESSIBLE TO THE PU$1K due
ECB06/17/2025BC 3303.13.2 SAFETY MONITORING PLAN: WHERE WORK HAS BEEN INTERRUPTED OR ABANDONED AND DISCONTINUED FOR A PERIOD OF AT LEAST 3 MONTHS, A SAFETY MONITORING PLAN SATISFACTORY TO THE COMMISSIONER SHALL BE PREPARED$3K due
HPD06/12/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB04/10/2025INACTIVE JOB SITE. SITE CLOSED JOB PERMIT # 420666416-01-AL EXPIRED. RESPONDENT FAILED TO CORRECT AND FILE C OF C FOR VIO 39518650L ISSUED ON 07/01/2023 AC 28-204.4$6K due
ECB04/09/2025JOB FENCE JOB#Q00427123 PERMIT EXPIRED ON 7/22/23 .@SITE WITH ALL PERMITED EXPIRED OBSERVE JOB FENCE IN PLACE AT ALL EXPOSURES AND I VERIFIED JOB FENCE#Q00427123 PERMIT EXPIRED SINCE 7/22/23 AND JOB FENCE JOB#Q$6K due
ECB02/03/2025STALLED SITE WITH SWS AT EXP 1. SWS PERMIT HAS EXPIRED ON 1 12 2024. RENEW SWS PERMIT.$6K due
DOB12/11/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB12/11/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD12/02/2024§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
ECB09/27/2024A SITE ON A STOP WORK ORDER WITH A CONSTRUCTION FENCE IN PLACE, DOB RECORDS REVEALED THAT THE FENCE PERMIT EXPIRED 02/25/2023 WITH NO RENEWAL IN THE SYSTEM. PERMITS MUST REMAIN ACTIVE FOR DURATION OF TIME THE E$6K due
ECB09/27/2024BC 3303.13.2 SAFETY MONITORING PLAN: WHERE WORK HAS BEEN INTERRUPTED OR ABANDONED AND DISCONTINUED FOR A PERIOD OF AT LEAST THREE MONTHS, A SAFETY MONITORING PLAN SATISFACTORY TO THE COMMISSIONER SHALL BE PREPA$10K due
DOB09/04/2024BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR# 420666416 DUE TO SUPERINTENDENT OF CONSTRUCTION WITHDRAWAL. SITE IS CLOSED, UNABLE TO GAIN ACCESS TO SEE % OF WORK.
ECB07/23/2024INACTIVE CLOSED JOB WITH EXPIRED WORK PERMIT. RESPONDENT FAILED TO CORRECT THE VIOLATING CONDITION AND FILE FOR A CERTIFICATE OF CORRECTION PURSUANT TO AC 28-204.4 FOR VIOLATIONS NO. 39518650L ISSUED 07/01/2023$10K due
HPD04/16/2024(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB12/01/2023FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN VIOLATION #042123CE406015R (CONSTROL #359178) ISSUED ON 04/21/23 WHICH DOCUMENTED A FAILURE TO COMPLY WITH PREVIOUS VIOLATION #010323CE406015R (CONTR$12K due
DOB11/27/2023FAILURE TO COMPLY WITH VIOLATION # 042123CE40601SR,(CONTROL # 359178), ISSUED ON 04/21/23, MANDATED TO COMMENCE THE STABILIZATION OF THE PAR- TIALLY DEMOLISHED BUILDING UNDER PERMIT BY 05/15/23, AND TO SIGN OFF THE PERMIT BY 06/15/23. REMEDY: IMMEDIATELY COMMENCE STABILIZATION OF PARTIALY DEMOLISHD BLDG UNDR PERMIT&SIGN OFF THE PERMIT BY 2/28/23
HPD11/24/2023§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
DOB10/04/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB04/21/2023V-DOB VIOLATION - ACTIVE
HPD03/29/2023(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB01/03/2023V-DOB VIOLATION - ACTIVE
DOB12/21/2022V-DOB VIOLATION - ACTIVE
HPD11/15/2022§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
HPD03/08/2022§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
HPD03/08/2022(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD04/16/2021(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD04/16/2021§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
HPD11/01/2019§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
HPD10/24/2018§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
ECB06/25/2026GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039553635R...Hearing held — result not yet published$1K proposed
ECB06/25/2026GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039553633N...Hearing held — result not yet published$1K proposed
ECB01/18/2024AT THE TIME OF MY INSPECTION OBSERVED, SITE GATES LOCKED, NO ACTIVITIES OR NO ONE WAS AT SITE. NO COC ON DOB RECORDS AND FAILURE TO VERIFY IF CONDITIONS CORRECTED. COMPLY WITH COMMISSIONER ORDER, CORRECT CONDITNothing owed — awaiting certificate of correction
ECB12/13/2023FAILURE TO MAINTAIN WEATHERPROOF INTEGRITY OF ADJOINING BUILDING. OBSERVED THE PARTY WALL AT EXP#2 IS DEMOLISHED AT ALL FLOORS AND THERE IS NO WATERPROOFING ON 1ST AND 2ND FLOOR, INADEQUATE WATERPROOFING ON 3RDNothing owed — awaiting certificate of correction
ECB11/20/2023FAILURE TO COMPLY WITH COMMISSIONER ORDER, A CLASS 1 VIOLATION FOR FAILURE TO SAFE GUARD WAS ISSUED ON 07/01/2023 DUE TO DAMAGED ADJ PROPERTIES. NO COC SUBMITTED, AND AT THE TIME OF INSPECTION, SITE WAS CLOSENothing owed — awaiting certificate of correction
ECB07/01/2023GC FAILED TO SAFEGUARD ADJOINING PROPERTY. DURING WORK OPERATION A PARTY WALL WAS DAMAGED BY DRILLING A BOLT THAT PENETRATED UP TO THE OTHER SIDE AND GC FAILING TO TAKE SAFETY MEASURES TO PREVENT DAMAGES TO ADJNothing owed — awaiting certificate of correction
ECB04/27/2023AT TIME OF INSPECTION OF ALTERATION SITE OBSERVED PARTIAL DEMOLITION OUT OF SEQUENCE, SHORING NOT TO DETAILS AT ROOF AND NOT IN PLACE FOR 1ST AND 2ND FLOORS, WITH FRONT AND REAR WALLS AND ROOF JOISTS REMOVED AFNothing owed — awaiting certificate of correction
ECB12/06/2022Q00261895-P1@6 STORY ALT1 SITE I OBSERVE DEMOLITION OUT OF SEQUENCE+SHORING NOT TO DETAILS AT ROOF&NOT IN PLACE FOR 1ST AND 2ND FLOOR WITH FRONT+REAR WALLS,CELLAR FLOOR&ROOF JOISTS REMOVED AFFECTING THE STRUCTUNothing owed — awaiting certificate of correction
ECB12/29/2021FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. A TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLATION IN PROGRESS UNDER PERMIT #Q00600353-I1-SH, OBSERVED WORKER THROWING MENothing owed — awaiting certificate of correction
ECB07/13/2021BC3301.6.1 FAILURE TO SAFETY EQUIPMENT MEASURE NO DESIGN DRAWING FOR SHARING.NOTE:AT TIME OF MY INSPECTION OBSERVED ACTIVE JOB SITE.6 STORYBLDG 3RD FL LEVEL UNDER CONSTRUCTION.I OBSERVED WOODEN STORING PROVIDENothing owed — awaiting certificate of correction
ECB07/13/2021FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY EFFECTED BY CONSTRUCTION. NOTE:AT TIME OF MY INSPECTION OBSERVED ACTIVE JOB SITE.6 STORY BLDG ALTERATION-1 3RD FL LEVEL UNDER CONSTRUCTION.I OBSERVED EXP.#2 2 STORY ONothing owed — awaiting certificate of correction
ECB07/13/2021BC3301.2 FAILURE TO INSTITUTE SAFETY EQUIPMENT MEASURE NO OVERHEAD PROTECTION.NOTE:AT TIME OF MY INSPECTION OBSERVED ACTIVE JOB SITE.THE BLDG 6 STORY ALTERATION 3RD FL LEVEL UNDER CONSTRUCTION & PARTIAL DEMOLITNothing owed — awaiting certificate of correction
ECB07/13/20213309.14 FAILURE TO PROVIDE WINDOWS PROTECTION FOR ADJACENT BLDG AT EXP-2.NOTE:AT TIME OF MY INSPECTION OBSERVED 6 STORY BLDG AT ALTERATION, PARTIAL DEMOLITION,EXTERIOR WALL AT 2ND & 3RD FL LEVEL UNDER CONSTRUCTNothing owed — awaiting certificate of correction
ECB07/13/2021FAILURE TO PROVIDED/ACCEPTED CONSTRUCTION DOCUMENTS AT JOB SITE AT TIME OF MY INSPECTION-NOTE:AT TIME OF MY INSPECTION OBSERVED 6 STORY BLDGALTERATION OF 3 STORY BLDG PARTIAL DEMOLITION & EXCAVATION LEVEL UNDERNothing owed — awaiting certificate of correction
ECB07/13/2021BC3309.9 FAILURE TO PROVIDE WEATHERPROOF ADJOINING PROPERTY.NOTE:AT TIME OF MY INSPECTION OBSERVED THE ACTIVE JOB SITE.I OBSERVED 6 STORY BLDG EXT-BLDG DEMOLISH AT EXP-2 ADJACENT PROPERTY 2 STORY OCCUPIED BLDG.Nothing owed — awaiting certificate of correction