| Owner | Filings | Most Recent |
|---|---|---|
| CONSOLIDATED SCAFFOLDING INC. | 12 | 07/08/2026 |
| KAJ NY CONSTRUCTION | 6 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | 7 | 03/22/2026 |
| 63 MADISON OWNER LLC | 33 | 03/22/2026 |
| SCHIMENTI CONSTRUCTION | 23 | 03/22/2026 |
| SHIMENTI CONSTRUCTION CO | 1 | 03/22/2026 |
| 63 MADISON AVENUE ASSOC | 12 | 03/22/2026 |
| TO OWNER OF 63 MADISON AV | 1 | 03/22/2026 |
| OWNER OF PREMISES 28 E 28 | 1 | 03/22/2026 |
| 63 MADISON | 26 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| WILSON & ASSOCIATES ENGINEERING DPC | 20 | 07/27/2026 |
| FORGE GROUP NYC LLC | 2 | 06/08/2026 |
| ROBERT DERECTOR ASSOCIATES | 38 | 06/03/2026 |
| FACTORY ENGINEERING WORKS PLLC | 1 | 04/09/2026 |
| LGA PARTNERS, LP | 9 | 03/26/2026 |
| HALO ARCHITECTURE PLLC | 2 | 03/24/2026 |
| TAN ENGINEERING PC | 3 | 01/23/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 5 | 11/18/2025 |
| TPG ARCHITECTURE, LLP | 3 | 09/25/2025 |
| PAUL G. JONES, P.E. | 3 | 06/30/2025 |
| IW ARCHITECTURE, PLLC | 1 | 04/14/2025 |
| GILSANZ MURRAY STEFICEK LLP | 8 | 03/05/2025 |
| STUDIOS ARCHITECTURE | 2 | 03/05/2025 |
| ELIZABETH MARR | 5 | 12/03/2024 |
| RANDALL P. COLLINS ARCHITECT, PC | 3 | 06/19/2024 |
| ALAN FELD | 2 | 11/14/2023 |
| HNY CONSULTING ENGINEERS LLC | 9 | 12/07/2021 |
| AK ENGINEERING, PC | 2 | 11/04/2021 |
| ENTHINK ENGINEERS LLC | 4 | 10/15/2021 |
| HC ARCHITECT, PC | 3 | 06/16/2021 |
| GREEN DESIGN | 8 | 05/28/2021 |
| ANDREW MAASS | 1 | 03/17/2021 |
| ALBERTO ROMAN | 1 | 08/06/2020 |
| REVAP CONSULTING ENGINEERS LLC | 1 | 04/28/2020 |
| PATUXENT ENGINEERING LLC | 1 | 03/10/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 109 | 03/21/2026 |
| RIZZO GROUP | 12 | 03/21/2026 |
| ADVANCED BUILDERS SERVICES | 2 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 8 | 03/21/2026 |
| HS DESIGN STUDIO | 4 | 03/21/2026 |
| MODERN BUILDING CONSULTANT | 4 | 03/21/2026 |
| NEW YORK SIGN CONSULTANTS | 2 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 18 | 03/21/2026 |
| AE DESIGN SOLUTION | 8 | 03/21/2026 |
| PERMIT SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SCHIMENTI CONSTRUCTION CO | General Contractor | 35 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 15 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 11 | 07/08/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 9 | 07/08/2026 |
| MILLENIUM MECHANICAL SERV | General Contractor | 8 | 07/08/2026 |
| CONSOLIDATED SCAFFOLDING | General Contractor | 8 | 07/08/2026 |
| PATRIOT ELECTRIC CORP | Electrical | 6 | 03/22/2026 |
| STANDARD FIRE PROTECT LLC | Fire Protection | 6 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 5 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 5 | 07/08/2026 |
| FOLOR INC | General Contractor | 5 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 4 | 07/08/2026 |
| STANDARD PLBG SVS LLC | Plumbing | 4 | 07/08/2026 |
| CORE FOUR CONSTRUCTION IN | General Contractor | 3 | 03/21/2026 |
| CONSTRUCTION MANAGEMENT & | General Contractor | 3 | 07/08/2026 |
| BUILT NYG INC | General Contractor | 3 | 07/08/2026 |
| WULFING CONSTRUCTION LLC | General Contractor | 3 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| SIGNS CAD | Scaffold | 3 | 07/08/2026 |
| MANENGEERING BUREAU INC | Fire Protection | 2 | 07/08/2026 |
| ZIZZO, FRANK | Electrical | 2 | 03/21/2026 |
| SEAN COAKLEY P & H INC | Fire Protection | 2 | 07/08/2026 |
| FRANK ZIZZO | Electrical | 2 | 03/21/2026 |
| KAJ NY CONSTRUCTION INC | General Contractor | 2 | 07/08/2026 |
| AIK RENOVATION INC | General Contractor | 2 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 25 | 07/27/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 21 | 06/08/2026 |
| FACTORY ENGINEERING WORKS | 8855 | 3 | 04/09/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 21 | 03/17/2026 |
| TAN ENGINEERING, P.C. | 1291 | 2 | 01/23/2026 |
| HALO ARCHITECTURE PLLC | 8021 | 1 | 01/09/2026 |
| DNA CONTROLLED INSPECTION | 554 | 3 | 03/20/2025 |
| AK ENGINEERING PC | 678 | 7 | 03/22/2024 |
| SKYLINE ENGINEERING, PLLC | 267 | 11 | 12/07/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Signed-off | PAR FIRE PROTECTION LLC | 08/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | JEM FIRE PREVENTION INC | 05/18/2026 |
| DOB NOW | General Construction | Signed-off | BENCHMARK BUILDERS LLC | 05/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BUILT NYG INC | 05/08/2026 |
| DOB NOW | Plumbing | Permit Issued | W.R. PLBG AND HTG CORP | 04/30/2026 |
| DOB NOW | Structural | Permit Issued | BUILT NYG INC | 04/15/2026 |
| DOB NOW | General Construction | Permit Issued | BUILT NYG INC | 01/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FOLOR INC | 11/21/2025 |
| DOB NOW | General Construction | Permit Issued | FOLOR INC | 11/21/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MILLENIUM MECHANICAL SERV | 11/21/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MILLENIUM MECHANICAL SERV | 11/19/2025 |
| DOB NOW | Standpipe | Signed-off | STANDARD FIRE SUPP CORP | 11/12/2025 |
| DOB NOW | Sprinklers | Signed-off | A&H PLUMBING,LLC | 11/12/2025 |
| DOB NOW | Mechanical Systems | Signed-off | AIK RENOVATION INC | 10/15/2025 |
| DOB NOW | General Construction | Signed-off | AIK RENOVATION INC | 10/15/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SCHIMENTI CONSTRUCTION CO | 09/12/2025 |
| DOB NOW | General Construction | Permit Issued | SCHIMENTI CONSTRUCTION CO | 08/28/2025 |
| DOB NOW | Sprinklers | Signed-off | STANDARD FIRE SUPP CORP | 05/06/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | ELM SUSPENSION SYSTEMS | 04/29/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | CONSOLIDATED SCAFFOLDING | 04/16/2025 |
| DOB NOW | Sign | Signed-off | POLSINELLI, HENRY | 04/15/2025 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 04/14/2025 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 04/14/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 04/11/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MILLENIUM MECHANICAL SERV | 04/09/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MILLENIUM MECHANICAL SERV | 04/08/2025 |
| DOB NOW | Structural | Signed-off | BENCHMARK BUILDERS LLC | 03/24/2025 |
| DOB NOW | General Construction | Signed-off | BENCHMARK BUILDERS LLC | 03/24/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | ELM SUSPENSION SYSTEMS | 02/14/2025 |
| DOB NOW | Structural | Signed-off | FOLOR INC | 12/16/2024 |
| DOB NOW | Structural | Permit Issued | SCHIMENTI CONSTRUCTION CO | 12/04/2024 |
| DOB NOW | General Construction | Permit Issued | SCHIMENTI CONSTRUCTION CO | 12/04/2024 |
| DOB NOW | General Construction | Permit Issued | SCHIMENTI CONSTRUCTION CO | 12/04/2024 |
| DOB NOW | General Construction | Signed-off | FOLOR INC | 11/18/2024 |
| DOB NOW | Mechanical Systems | Signed-off | MILLENIUM MECHANICAL SERV | 10/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | MILLENIUM MECHANICAL SERV | 10/24/2024 |
| DOB NOW | Plumbing | Signed-off | A&H PLUMBING,LLC | 10/01/2024 |
| DOB NOW | Plumbing | Signed-off | A&H PLUMBING,LLC | 10/01/2024 |
| DOB NOW | Sprinklers | Signed-off | STANDARD FIRE SUPP CORP | 10/01/2024 |
| DOB NOW | Sprinklers | Signed-off | STANDARD FIRE SUPP CORP | 09/30/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/09/2026 | Permit Issued | BUILT NYG INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric TQHP0963AL42AN 96,000 BTU · Vrf Outdoor ×3 TQHYP0963AL42AN 72,000 BTU · Vrf Outdoor ×2 Ventilation Spring Air ×2 |
| 03/17/2026 | — | — | Air Conditioning Systems | Cooling Liebert DME027E 21,500 BTU · Crac Unit ×3 |
| 10/14/2025 | Signed-off | AIK RENOVATION INC | Air Conditioning Systems, Ventilation Systems | Cooling Florida Heat Pump CL024 22,900 BTU · Wshp ×1 Vertiv MMD20W 20,600 BTU · Crac Unit ×1 Ventilation Iec HPY 16 12,362 BTU · Fan Coil Indoor ×7 |
| 03/24/2025 | Signed-off | BENCHMARK BUILDERS LLC | Heating and Air Conditioning Systems | Heat / Cool |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | Signed-off | STANDARD FIRE PROTECT LLC | 729 heads |
| 07/27/2026 | Signed-off | PAR FIRE PROTECTION LLC | — |
| 06/03/2026 | Signed-off | STANDARD FIRE PROTECT LLC | 143 heads, 1 outlets |
| 04/09/2026 | Permit Issued | JEM FIRE PREVENTION INC | Sprinkler System |
| 03/17/2026 | — | — | 62 heads |
| 11/24/2025 | — | — | 24 heads |
| 11/05/2025 | Signed-off | STANDARD FIRE PROTECT LLC | 768 heads |
| 08/25/2025 | — | — | 1 outlets |
| 10/17/2024 | — | — | 602 heads |
| 01/13/2022 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 07/27/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 06/03/2026 | Signed-off | STANDARD PLBG SVS LLC | Water/Sanitary |
| 04/09/2026 | Permit Issued | W.R. PLBG AND HTG CORP | Gas, Water/Sanitary |
| 03/17/2026 | — | — | Water/Sanitary |
| 11/24/2025 | — | — | — |
| 11/05/2025 | — | — | — |
| 08/25/2025 | — | — | Water/Sanitary |
| 08/25/2025 | — | — | — |
| 01/13/2022 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 05/15/2026 | Permit Issued | ALL AROUND ELECTRIC CORP. | General Wiring |
| 12/17/2025 | Permit Issued | NEE ELECTRICAL, LLC | — |
| 09/10/2025 | Permit Issued | PM ELEC'L MAINTENANCE INC | — |
| 08/05/2025 | Permit Issued | PATRIOT ELECTRIC CORP | — |
| 06/26/2025 | Permit Issued | OMTA TECH INC | General Wiring |
| 04/30/2025 | Permit Issued | OMTA TECH INC | — |
| 04/16/2025 | Permit Issued | L.E.A. ELECTRIC CORP. | General Wiring |
| 10/31/2024 | Complete | NEW TECH ELECTRIC INC | General Wiring |
| 10/01/2024 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 10/01/2024 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 07/10/2024 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 12/04/2023 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 10/25/2023 | Complete | PATRIOT ELECTRIC CORP | — |
| 01/08/2023 | Permit Issued | NEW TECH ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/09/2026 | Permit Issued | JEM FIRE PREVENTION INC | 1 scope_items |
| 10/22/2024 | Permit Issued | SCHIMENTI CONSTRUCTION CO | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/30/2025 | Permit Issued | CONSOLIDATED SCAFFOLDING | Sidewalk Shed |
| 08/06/2020 | Permit Issued | MANHATTAN D ENTERPRISES | Fence |
| 04/28/2020 | — | — | Fence |
| 04/25/2018 | Permit Issued | KAJ NY CONSTRUCTION INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2025 | — | — | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/12/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/06/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/06/2026 | Certified Sprinkler (PL)-Sprinkler-Hydro | Certified | View ↗ |
| 04/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/29/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/27/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/20/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/02/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/17/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/14/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/17/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/15/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/15/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/11/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/27/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/27/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/27/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 07/27/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 07/27/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/27/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/27/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| 06/17/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/17/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/17/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/17/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/17/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 06/17/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 06/17/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/17/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/17/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/17/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| American Eagle Outfitters | Office | Floors 7–11 | Project M01143204 Project M01078615 |
| Braze | Office | Floors 12, 13 | Project M00976918 Project M00929389 |
| Ground Central | Restaurant / Food Service | Cellar, Floor 1 | Project M00934064 Project M00952437 |
| Prosek | Office | Floor 15 | Project M00861171 |
| Whole Foods Market | Retail | Sub-cellar, Cellar, Floors 1–3 | Project M00346982 Project M00322632 |