← Back
Miscellaneous hospital / health care facility
Maimonides Cancer Center
6300 8 AVENUE · Name © OpenStreetMap contributors · BIN 3143889
💬 Discuss this project
1978Year Built
2Stories
I9Building Class
C4-2Zoning
71,701 sfGross Floor Area
3Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: THE LSMD FUND PROPCO LLC · 25,550 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 2 filings · 20 docs
Floor 11p · 1 filing · 3 docs
CellarUnder Construction32p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RMR GROUP907/08/2026
MAIMONIDES MEDICAL CENTER1407/08/2026
RUBIN EQUITIES404/09/2026
MMC MANAGEMENT CORP503/22/2026
THE LSMD FUND PROPCO LLC103/22/2026
CITIBANK N.A.103/22/2026
REIT MANAGEMENT RESEARCH703/21/2026
HRPT PROPERTIES TRUST1703/21/2026
HEPT PROPERRTIES TRUST1103/21/2026
HRPT503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING P C1403/21/2026
O S ASSOCIATES403/21/2026
A TECH ENGINEERING NYC203/21/2026
LMS-ACE SERVICES103/21/2026
BUILDINGS REPRISENTATIVE LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LONG & DELOSA CONST GROUP LTDGeneral Contractor407/08/2026
MVS HEATING & AIR CONDITGeneral Contractor303/21/2026
RICHMOND P & H CO, INCFire Protection207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
LAKE CONTRACTING LLCGeneral Contractor107/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
4 STAR CONTRACTING INCGeneral Contractor107/08/2026
ON STAR MANAGEMENT LLCGeneral Contractor104/09/2026
AARON PLBG AND MECH SYSTPlumbing103/22/2026
RICHMOND P & H CO., INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O589505/28/2025
O&S ASSOCIATES2753308/11/2022
RELIANCE ENGINEERING, P.C322202/08/2022
A TECH ENGINEERING NYC, P6738110/02/2019
Building Lifecycle
All (132)Filed (13)Permit Issued (11)Signed Off (6)Violation (60)Inspection (12)Special Inspection (30)
07/08/2026
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
06/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/30/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
12/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/30/2025
Violation issued (FDNY_NOV, closed)
10/24/2025
Permit issued — Plumbing
B01041026-S1-PL
10/24/2025
Permit issued — Plumbing
B01041026-S1-EW-SP
07/30/2025
Permit issued — General Construction
B01258996-I1-GC
07/25/2025
Filed — Alteration
APPLICATION FILED FOR THE REMOVAL OF STAIRS LEADING TO THE ADJACENT CONSTRUCTION SITE (6202 8TH AVENUE) IN ORDER TO COMPLY WITH SITE SAFETY DOB OBJECTION.
B01258996-I1
05/29/2025
Permit issued — General Construction
B01041026-I1-GC
05/29/2025
Special inspection requirement — Interior lighting power
MARISA HARTE
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
05/29/2025
Special inspection requirement — Final
MARISA HARTE
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
05/29/2025
Special inspection requirement — Lighting controls
MARISA HARTE
05/28/2025
Filed — Alteration
Installation of A/C units
B01041026-P1
05/13/2025
Violation issued (FDNY_NOV, closed)
05/13/2025
Violation issued (FDNY_NOV, closed)
04/02/2025
Permit issued — Mechanical Systems
B01041026-S2-MS
01/03/2025
Violation issued (FDNY_NOV, closed)
01/03/2025
Violation issued (FDNY_NOV, closed)
12/05/2024
Filed — Alteration
Installation of A/C units
B01041026-S1
12/03/2024
Filed — Alteration
Installation of A/C units
B01041026-S2
09/16/2024
Filed — Alteration
Installation of A/C units
B01041026-S3
09/13/2024
Filed — Alteration
Installation of A/C units
B01041026-I1
09/13/2024
Special inspection requirement — Lighting controls
MARISA HARTE
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
09/13/2024
Special inspection requirement — Final
MARISA HARTE
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
09/13/2024
Special inspection requirement — Interior lighting power
MARISA HARTE
08/06/2024
Violation issued (FDNY_NOV, closed)
08/06/2024
Violation issued (FDNY_ORDER, closed)
06/19/2024
Special inspection requirement — Structural Steel - Details
MARISA HARTE
06/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
06/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
MARISA HARTE
06/19/2024
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
06/18/2024
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
06/18/2024
Special inspection requirement — Post-installed Anchors
MARISA HARTE
06/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARISA HARTE
06/18/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MARISA HARTE
06/18/2024
Special inspection requirement — Structural Steel - Welding
MARISA HARTE
04/24/2024
Special inspection requirement — Sprinkler Systems
MARISA HARTE
04/24/2024
Special inspection requirement — Final
04/24/2024
Special inspection requirement — Mechanical Systems
MARISA HARTE
04/24/2024
Special inspection requirement — Final
MARISA HARTE
04/24/2024
Special inspection requirement — Maintenance information
MARISA HARTE
04/24/2024
Special inspection requirement — Permanent certificate
MARISA HARTE
10/23/2023
Violation issued (FDNY_NOV, closed)
10/23/2023
Violation issued (FDNY_NOV, closed)
09/28/2023
Violation issued (FDNY_NOV, closed)
02/02/2023
Signed off — Alteration
B00557838-I1
01/10/2023
Signed off — Alteration
B00770555-I1
01/04/2023
Signed off — Alteration
RECONFIGURATION OF TOILET ROOMS AT CANCER CENTER LOWER LEVEL.
B00558370-I1
08/24/2022
Permit issued — Structural
B00770555-I1-ST
08/11/2022
Filed — Alteration
B00770555-I1
08/08/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRICHMOND P & H CO., INC10/24/2025
DOB NOWPlumbingPermit IssuedRICHMOND P & H CO, INC10/24/2025
DOB NOWGeneral ConstructionPermit IssuedON STAR MANAGEMENT LLC07/30/2025
DOB NOWGeneral ConstructionPermit IssuedLONG DELOSA CONST GROUP05/29/2025
DOB NOWMechanical SystemsPermit IssuedLONG DELOSA CONST GROUP04/02/2025
DOB NOWStructuralPermit IssuedLAKE CONTRACTING LLC08/24/2022
DOB NOWPlumbingSigned-offRICHMOND P & H CO, INC02/10/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/21/2021
DOB NOWGeneral ConstructionSigned-off4 STAR CONTRACTING INC08/11/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC08/09/2021
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT11/22/2019
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM09/28/2020
BISOTISSUEDLONG & DELOSA CONST GROUP LTD08/09/2018
BISOTISSUEDLONG & DELOSA CONST GROUP LTD06/03/2018
BISMHISSUEDDONNELLY MECHANICAL CORP04/26/2017
BISOTISSUEDLONG & DELOSA CONST GROUP LTD04/17/2013
BISPLISSUEDROCKFORD P & H CORP04/17/2013
BISMHISSUEDLONG & DELOSA CONST GROUP LTD04/17/2013
BISCCISSUEDLPA CONSTRUCTION INC06/22/2010
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/13/2008
BISPLISSUEDECONOMY P & H CO.,INC12/13/2007
BISOTISSUEDCAULDWELL WINGATE CO LLC12/28/2005
BISPLISSUEDCARDOZA CORP05/02/2005
BISOTISSUEDCAULDWELL WINGATE CO LLC04/28/2005
BISMHISSUEDCAULDWELL WINGATE CO LLC04/28/2005
BIS—ISSUEDINTERBORO SIGN & MAINTENANCE04/25/2005
BISOTISSUEDBERGER SIGN INC02/10/2005
BIS—ISSUEDBERGERSIGN FABRICATION INC02/04/2005
BIS—ISSUEDBERGER SIGN INC01/27/2005
BIS—ISSUEDBERGER SIGNS INC01/21/2005
BISSPISSUEDLIBERTY PIPE INC01/03/2005
BISOTISSUEDCAULDWELL WINGATE CO LLC12/30/2004
BISMHISSUEDCAULDWELL WINGATE CO LLC12/30/2004
BIS—ISSUEDCAULDWELL WINGATE CO LLC12/30/2004
BISOTISSUEDCAULDWELL WINGATE CO LLC12/30/2004
BISSPISSUEDFEDERATED MECHANICAL CORP05/21/2004
BISPLISSUEDWDF INC05/06/2004
BISOTISSUEDCAULDWELL WINGATE CO LLC04/22/2004
BISMHISSUEDCAULDWELL WINGATE CO LLC04/22/2004
BISOTISSUEDCAULDWELL WINGATE CO LLC04/22/2004
+ 18 more permits on file
1 project · most recent 05/28/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2025Permit IssuedLONG & DELOSA CONST GROUPAir Conditioning Systems
Cooling
Trane Trane PKA-A24KA7 24,000 BTU · Vrf Indoor ×1
1 project · most recent 05/28/2025
Sprinkler System
FiledStatusContractorScope
05/28/2025Permit IssuedRICHMOND P & H CO, INCSprinkler System
1 project · most recent 05/28/2025
Water/Sanitary
FiledStatusContractorScope
05/28/2025Permit IssuedRICHMOND P & H CO., INCWater/Sanitary
1 project · most recent 08/12/2021
FiledStatusContractorScope
08/12/2021CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/08/2026Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
06/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/30/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
12/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/26/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/29/2025Interior lighting powerMARISA HARTEenergy_progress
05/29/2025Fire-Resistant Penetrations and JointsMARISA HARTEspecial
05/29/2025FinalMARISA HARTEprogress
05/29/2025Energy Code Compliance InspectionsMARISA HARTEprogress
05/29/2025Lighting controlsMARISA HARTEenergy_progress
09/13/2024Lighting controlsMARISA HARTEenergy_progress
09/13/2024Fire-Resistant Penetrations and JointsMARISA HARTEspecial
09/13/2024FinalMARISA HARTEprogress
09/13/2024Energy Code Compliance InspectionsMARISA HARTEprogress
09/13/2024Interior lighting powerMARISA HARTEenergy_progress
06/19/2024Structural Steel - DetailsMARISA HARTEspecial
06/19/2024HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
06/19/2024Duct leakage testing, insulation and designMARISA HARTEenergy_progress
06/19/2024Energy Code Compliance InspectionsMARISA HARTEprogress
06/18/2024Concrete - Cast-In-PlaceMARISA HARTEspecial
06/18/2024Post-installed AnchorsMARISA HARTEspecial
06/18/2024Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
06/18/2024Structural Steel - High Strength BoltingMARISA HARTEspecial
06/18/2024Structural Steel - WeldingMARISA HARTEspecial
04/24/2024Sprinkler SystemsMARISA HARTEspecial
04/24/2024Final—progress
04/24/2024Mechanical SystemsMARISA HARTEspecial
04/24/2024FinalMARISA HARTEprogress
04/24/2024Maintenance informationMARISA HARTEenergy_progress
04/24/2024Permanent certificateMARISA HARTEenergy_progress
Latest 25 of 31.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
09/01/2026B00523596-I1Request digital key ↗
09/01/2026B00523596-P1Request digital key ↗
09/01/2026B00567124-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00199573-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION12
09/28/2020340763971Open ↗
08/13/2018340562661Open ↗
06/03/2018340562661Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
01/13/2023321904837Open ↗
09/10/2020340763971Open ↗
03/08/2019321904837Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
05/30/2018340562661Open ↗
10/05/2017321430242Open ↗
05/02/2017321430242Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00523596-I1Open ↗
09/01/2026B00523596-P1Open ↗
09/01/2026B00567124-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/30/2026B01041026-S3Open ↗
09/01/2026B00523596-I1Open ↗
09/01/2026B00523596-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00523596-I1Open ↗
08/25/2026B01041026-S2Open ↗
08/25/2026B01041026-S2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
05/02/2017321430242Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISPC FULL REPORT2
10/30/2007310042771Open ↗
10/30/2007310042771Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/02/2017321430242Open ↗
04/17/2013320731062Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/17/2013320731062Open ↗
04/17/2013320731062Open ↗
▸Trade Schedules & Equipment8
▸BISEQUIPMENT USE APPLICATION/PERMIT3
10/06/2017321430242Open ↗
10/06/2017321430242Open ↗
10/30/2007310042771Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
05/16/2013320731062Open ↗
05/13/2008310042771Open ↗
▸BISSCHEDULE B - PLUMBING2
04/17/2013320731062Open ↗
09/16/2009320071667Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/06/2024321904837Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00558370-I1Open ↗
08/31/2026B00557838-I1Open ↗
08/28/2026B00770555-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
05/02/2017321430242Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/06/2010320139756Open ↗
09/16/2009320071667Open ↗
10/30/2007310042771Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00523596-I1Open ↗
08/21/2026B01041026-S2Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/30/2018340562661Open ↗
10/05/2017321430242Open ↗
05/02/2017321430242Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/30/2020340763971Open ↗
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/05/2017321430242Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/30/2020340763971Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/28/2020340763971Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00558370-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/30/2020340763971Open ↗
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/28/2020340763971Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
04/17/2013320731062Open ↗
04/06/2010320139756Open ↗
09/16/2009320071667Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/30/2020340763971Open ↗
10/05/2017321430242Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/05/2017321430242Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/01/2026B00523596-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
09/10/2020340763971Open ↗
03/08/2019321904837Open ↗
11/14/2017340562661Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/30/2020340763971Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
03/08/2019321904837Open ↗
05/02/2017321430242Open ↗
04/18/2013320731062Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISBOROUGH INTAKE FORM1
10/05/2017321430242Open ↗