Maimonides Cancer Center
6300 8TH AVENUE · Name © OpenStreetMap contributors · BIN 3143889
💬 Discuss this project
1978Year Built
2Stories
I9Building Class
C4-2Zoning
71,701 sfGross Floor Area
3Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: The LSMD Fund Propco · 25,550 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMaimonides Cancer CenterUnder Construction11p · 2 filings · 20 docs
Floor 1Maimonides Cancer CenterUnder Construction3p · 3 filings · 20 docs
CellarMaimonides Cancer Center, Maimonides Medical CenterUnder Construction38p · 3 filings · 20 docs
Site & exteriorThe Rmr Group LLC6p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Maimonides Medical Center1907/08/2026
HRPT Properties Trust1703/21/2026
Hept Properrties Trust1103/21/2026
RMR Group907/08/2026
HRPT503/21/2026
Rubin Equities404/09/2026
Citibank303/21/2026
The LSMD Fund Propco103/22/2026
SNH Medical Properties Trust103/21/2026
RMR Real Estate Services103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FC Consulting Engineering107/25/2025
Daniel Schunkewitz Architect405/28/2025
Icor Associates312/05/2024
Odc Associates308/11/2022
Enthink Engineers108/07/2021
A Tech Engineering NYC110/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gamill Engineering P C1403/21/2026
Odc Associates403/21/2026
A Tech Engineering NYC203/21/2026
LMS-Ace Services103/21/2026
Buildings Reprisentative203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Long & Delosa Construction GroupGeneral Contractor407/08/2026
MVS Heating & Air Conditspecialty_contractor303/21/2026
Richmond P & H CoFire Protection207/08/2026
Andamio ScaffoldingScaffold107/08/2026
Everest ScaffoldingScaffold107/08/2026
Aaron Plumbing and Mechanical SystemsPlumbing103/22/2026
4 Star ContractingGeneral Contractor107/08/2026
Richmond P & H CoPlumbing106/28/2026
Lake ContractingGeneral Contractor107/08/2026
On Star ManagementGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589505/28/2025
O&S Associates2753308/11/2022
Reliance Engineering322202/08/2022
A Tech Engineering NYC, P6738110/02/2019
Building Lifecycle
All (130)Filed (13)Permit Issued (12)Signed Off (6)Violation (60)Inspection (9)Special Inspection (30)
07/08/2026
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
06/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/30/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/30/2025
Violation issued (FDNY_NOV, closed)
10/24/2025
Permit issued — Plumbing
B01041026-S1-PL
10/24/2025
Permit issued — Plumbing
B01041026-S1-EW-SP
07/30/2025
Permit issued — General Construction
B01258996-I1-GC
07/25/2025
Filed — Alteration
APPLICATION FILED FOR THE REMOVAL OF STAIRS LEADING TO THE ADJACENT CONSTRUCTION SITE (6202 8TH AVENUE) IN ORDER TO COMPLY WITH SITE SAFETY DOB OBJECTION.
B01258996-I1
05/29/2025
Permit issued — General Construction
B01041026-I1-GC
05/29/2025
Special inspection requirement — Interior lighting power
MARISA HARTE
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
05/29/2025
Special inspection requirement — Final
MARISA HARTE
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
05/29/2025
Special inspection requirement — Lighting controls
MARISA HARTE
05/28/2025
Filed — Alteration
Installation of A/C units
B01041026-P1
05/13/2025
Violation issued (FDNY_NOV, closed)
05/13/2025
Violation issued (FDNY_NOV, closed)
04/02/2025
Permit issued — Mechanical Systems
B01041026-S2-MS
01/03/2025
Violation issued (FDNY_NOV, closed)
01/03/2025
Violation issued (FDNY_NOV, closed)
12/05/2024
Filed — Alteration
Installation of A/C units
B01041026-S1
12/03/2024
Filed — Alteration
Installation of A/C units
B01041026-S2
09/16/2024
Filed — Alteration
Installation of A/C units
B01041026-S3
09/13/2024
Filed — Alteration
Installation of A/C units
B01041026-I1
09/13/2024
Special inspection requirement — Lighting controls
MARISA HARTE
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
09/13/2024
Special inspection requirement — Final
MARISA HARTE
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
09/13/2024
Special inspection requirement — Interior lighting power
MARISA HARTE
08/06/2024
Violation issued (FDNY_NOV, closed)
08/06/2024
Violation issued (FDNY_ORDER, closed)
06/19/2024
Special inspection requirement — Structural Steel - Details
MARISA HARTE
06/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
06/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
MARISA HARTE
06/19/2024
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
06/18/2024
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
06/18/2024
Special inspection requirement — Post-installed Anchors
MARISA HARTE
06/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARISA HARTE
06/18/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MARISA HARTE
06/18/2024
Special inspection requirement — Structural Steel - Welding
MARISA HARTE
04/24/2024
Special inspection requirement — Sprinkler Systems
MARISA HARTE
04/24/2024
Special inspection requirement — Final
04/24/2024
Special inspection requirement — Mechanical Systems
MARISA HARTE
04/24/2024
Special inspection requirement — Final
MARISA HARTE
04/24/2024
Special inspection requirement — Maintenance information
MARISA HARTE
04/24/2024
Special inspection requirement — Permanent certificate
MARISA HARTE
10/23/2023
Violation issued (FDNY_NOV, closed)
10/23/2023
Violation issued (FDNY_NOV, closed)
09/28/2023
Violation issued (FDNY_NOV, closed)
02/02/2023
Signed off — Alteration
B00557838-I1
01/10/2023
Signed off — Alteration
B00770555-I1
01/04/2023
Signed off — Alteration
RECONFIGURATION OF TOILET ROOMS AT CANCER CENTER LOWER LEVEL.
B00558370-I1
08/24/2022
Permit issued — Structural
B00770555-I1-ST
08/11/2022
Filed — Alteration
B00770555-I1
08/08/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/05/2022
Violation issued (FDNY_ORDER, closed)
06/23/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRichmond P & H Co10/24/2025
DOB NOWSprinklersPermit IssuedRichmond P & H Co10/24/2025
DOB NOWGeneral ConstructionPermit IssuedOn Star Management07/30/2025
DOB NOWGeneral ConstructionPermit IssuedLong Delosa Construction Group05/29/2025
DOB NOWMechanical SystemsPermit IssuedLong Delosa Construction Group04/02/2025
DOB NOWStructuralPermit IssuedLake Contracting08/24/2022
DOB NOWSprinklersSigned-offRichmond P & H Co02/10/2022
DOB NOWGeneral ConstructionSigned-offLong Delosa Construction Group01/31/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/21/2021
DOB NOWGeneral ConstructionSigned-off4 Star Contracting08/11/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding08/09/2021
DOB NOWMechanical SystemsSigned-offMVS Heating & Air Condit11/22/2019
BISOTISSUEDStructural Preserv System09/28/2020
BISOTISSUEDLong & Delosa Construction Group08/09/2018
BISOTISSUEDLong & Delosa Construction Group06/03/2018
BISMHISSUEDDonnelly Mechanical04/26/2017
BISOTISSUEDLong & Delosa Construction Group04/17/2013
BISPLISSUEDRockford P & H04/17/2013
BISMHISSUEDLong & Delosa Construction Group04/17/2013
BISCCISSUEDLpa Construction06/22/2010
BISSPISSUEDCapitol Fire SPKL Co03/13/2008
BISPLISSUEDEconomy P & H Co12/13/2007
BISOTISSUEDCauldwell Wingate Co12/28/2005
BISPLISSUEDCardoza05/02/2005
BISOTISSUEDCauldwell Wingate Co04/28/2005
BISMHISSUEDCauldwell Wingate Co04/28/2005
BIS—ISSUEDInterboro Sign & Maintenance04/25/2005
BISOTISSUEDBerger Sign02/10/2005
BIS—ISSUEDBergersign Fabrication02/04/2005
BIS—ISSUEDBerger Sign01/27/2005
BIS—ISSUEDBerger Signs01/21/2005
BISSPISSUEDLiberty Pipe01/03/2005
BISOTISSUEDCauldwell Wingate Co12/30/2004
BISMHISSUEDCauldwell Wingate Co12/30/2004
BIS—ISSUEDCauldwell Wingate Co12/30/2004
BISOTISSUEDCauldwell Wingate Co12/30/2004
BISSPISSUEDFederated Mechanical05/21/2004
BISPLISSUEDWDF05/06/2004
BISOTISSUEDCauldwell Wingate Co04/22/2004
BISMHISSUEDCauldwell Wingate Co04/22/2004
+ 19 more permits on file
1 project · most recent 05/28/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2025Permit IssuedLong & Delosa Construction GroupAir Conditioning Systems
Cooling
Trane Trane PKA-A24KA7 24,000 BTU · Vrf Indoor ×1
1 project · most recent 05/28/2025
Sprinkler System
FiledStatusContractorScope
05/28/2025Permit IssuedRichmond P & H CoSprinkler System
1 project · most recent 05/28/2025
Water/Sanitary
FiledStatusContractorScope
05/28/2025Permit IssuedRichmond P & H CoWater/Sanitary
1 project · most recent 08/12/2021
FiledStatusContractorScope
08/12/2021CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/08/2026Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
06/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/30/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
08/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/26/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/29/2025Interior lighting powerMARISA HARTEenergy_progress
05/29/2025Fire-Resistant Penetrations and JointsMARISA HARTEspecial
05/29/2025FinalMARISA HARTEprogress
05/29/2025Energy Code Compliance InspectionsMARISA HARTEprogress
05/29/2025Lighting controlsMARISA HARTEenergy_progress
09/13/2024Lighting controlsMARISA HARTEenergy_progress
09/13/2024Fire-Resistant Penetrations and JointsMARISA HARTEspecial
09/13/2024FinalMARISA HARTEprogress
09/13/2024Energy Code Compliance InspectionsMARISA HARTEprogress
09/13/2024Interior lighting powerMARISA HARTEenergy_progress
06/19/2024Structural Steel - DetailsMARISA HARTEspecial
06/19/2024HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
06/19/2024Duct leakage testing, insulation and designMARISA HARTEenergy_progress
06/19/2024Energy Code Compliance InspectionsMARISA HARTEprogress
06/18/2024Concrete - Cast-In-PlaceMARISA HARTEspecial
06/18/2024Post-installed AnchorsMARISA HARTEspecial
06/18/2024Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
06/18/2024Structural Steel - High Strength BoltingMARISA HARTEspecial
06/18/2024Structural Steel - WeldingMARISA HARTEspecial
04/24/2024Sprinkler SystemsMARISA HARTEspecial
04/24/2024Final—progress
04/24/2024Mechanical SystemsMARISA HARTEspecial
04/24/2024FinalMARISA HARTEprogress
04/24/2024Maintenance informationMARISA HARTEenergy_progress
04/24/2024Permanent certificateMARISA HARTEenergy_progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Maimonides Cancer CenterMedical / HealthcareCellar, Roof
Project B01041026 Alteration · Permit Entire · 09/13/2024
Maimonides Medical CenterMedical / HealthcareCellar
Project B00557838 Alteration · LOC Issued · 02/08/2022
Project B00558370 Alteration · LOC Issued · 01/26/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
09/01/2026B00523596-I1Request digital key ↗
09/01/2026B00523596-P1Request digital key ↗
09/01/2026B00567124-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00199573-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION12
09/28/2020340763971Open ↗
08/13/2018340562661Open ↗
06/03/2018340562661Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
01/13/2023321904837Open ↗
09/10/2020340763971Open ↗
03/08/2019321904837Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
05/30/2018340562661Open ↗
10/05/2017321430242Open ↗
05/02/2017321430242Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00523596-I1Open ↗
09/01/2026B00523596-P1Open ↗
09/01/2026B00567124-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/30/2026B01041026-S3Open ↗
09/01/2026B00523596-I1Open ↗
09/01/2026B00523596-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00523596-I1Open ↗
08/25/2026B01041026-S2Open ↗
08/25/2026B01041026-S2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
05/02/2017321430242Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISPC FULL REPORT2
10/30/2007310042771Open ↗
10/30/2007310042771Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/02/2017321430242Open ↗
04/17/2013320731062Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/17/2013320731062Open ↗
04/17/2013320731062Open ↗
▸Trade Schedules & Equipment8
▸BISEQUIPMENT USE APPLICATION/PERMIT3
10/06/2017321430242Open ↗
10/06/2017321430242Open ↗
10/30/2007310042771Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
05/16/2013320731062Open ↗
05/13/2008310042771Open ↗
▸BISSCHEDULE B - PLUMBING2
04/17/2013320731062Open ↗
09/16/2009320071667Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/06/2024321904837Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00558370-I1Open ↗
08/31/2026B00557838-I1Open ↗
08/28/2026B00770555-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
05/02/2017321430242Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/06/2010320139756Open ↗
09/16/2009320071667Open ↗
10/30/2007310042771Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00523596-I1Open ↗
08/21/2026B01041026-S2Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/30/2018340562661Open ↗
10/05/2017321430242Open ↗
05/02/2017321430242Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/30/2020340763971Open ↗
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/05/2017321430242Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/30/2020340763971Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/28/2020340763971Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00558370-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/30/2020340763971Open ↗
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/28/2020340763971Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
04/17/2013320731062Open ↗
04/06/2010320139756Open ↗
09/16/2009320071667Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/30/2020340763971Open ↗
10/05/2017321430242Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/05/2017321430242Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/01/2026B00523596-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
09/10/2020340763971Open ↗
03/08/2019321904837Open ↗
11/14/2017340562661Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/30/2020340763971Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
03/08/2019321904837Open ↗
05/02/2017321430242Open ↗
04/18/2013320731062Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/10/2020340763971Open ↗
11/14/2017340562661Open ↗
▸BISBOROUGH INTAKE FORM1
10/05/2017321430242Open ↗