0Year Built
—Stories
W1Building Class
M1-1Zoning
1 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC SCHOOL CONSTRUCTION AUTHORITY · 21,600 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction233p · 2 filings · 20 docs
Floor 4Under Construction228p · 3 filings · 20 docs
Floor 3Under Construction227p · 2 filings · 20 docs
Floor 2Under Construction228p · 2 filings · 20 docs
Floor 1Under Construction227p · 2 filings · 20 docs
CellarUnder Construction229p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY7609/30/2026
NORDEST SERVICE2007/08/2026
TECHNICO CONSTRUCTION1003/22/2026
SCHOOL CONSTRUCTION AUTHORITY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2019$9.7M—— → —$9,650,000/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES LLC203/21/2026
EXPEDITE DEM203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
CASO ASSOCIATES3403/21/2026
SOL BUILDING CONSULTING SERVICES203/21/2026
TAREK M ZEID P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TECHNICO CONSTRUCTIONGeneral Contractor2807/08/2026
CS BRIDGE CORPGeneral Contractor907/08/2026
ROMA SCAFFOLDING INCGeneral Contractor607/16/2026
PAR PLUMBING CO., INCPlumbing509/30/2026
NORDEST SERVICES LLCGeneral Contractor407/08/2026
A & F FIRE PROTECTION COFire Protection409/25/2026
NATIONAL ENVIROMENTAL SAFETYGeneral Contractor407/08/2026
R.A.M.S. MECHANICAL INCGeneral Contractor408/11/2026
MULTI-PHASE ELEC'L SVCSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT2301806/23/2026
Building Lifecycle
All (180)Filed (32)Permit Issued (55)Signed Off (6)Violation (18)Inspection (4)Objection (35)Special Inspection (30)
09/29/2026
Permit issued — Plumbing
B00852836-S7-PL
09/24/2026
Permit issued — Standpipe
B00852836-S8-EW-SP
09/24/2026
Permit issued — Sprinklers
B00852836-S8-EW-SD
08/10/2026
Permit issued — Plumbing
B00852836-S4-PL
08/10/2026
Permit issued — Mechanical Systems
B00852836-S6-MS
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
STEPHEN LATUS
07/23/2026
Special inspection requirement — Masonry
STEPHEN LATUS
07/23/2026
Special inspection requirement — Sprayed fire-resistant materials
STEPHEN LATUS
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
07/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN LATUS
07/23/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
STEPHEN LATUS
07/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tommy Maene
07/21/2026
Permit issued — Mechanical Systems
B00908308-I1-MS
07/15/2026
Permit issued — Sidewalk Shed
B01235511-I1-SH
07/09/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Other
06/23/2026
Filed — Alteration
P.S.82K/INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SUPPORTED SCAFFOLD), RELATED JOB NUMBER B00852836. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01244493-P2
06/09/2026
Violation issued (ECB, closed)
Construction
06/09/2026
Violation issued (ECB, open)
Construction
05/20/2026
Violation issued (ECB, closed)
Unknown
05/01/2026
Permit issued — Support of Excavation
B01231979-I1-SE
05/01/2026
Permit issued — Support of Excavation
B01231963-I1-SE
05/01/2026
Permit issued — General Construction
B00852836-I1-GC
05/01/2026
Permit issued — Mechanical Systems
B00852836-S6-GC
04/13/2026
Permit issued — General Construction
B00852836-Z3-MS
03/30/2026
Permit issued — General Construction
B00852836-S6-GC
03/30/2026
Permit issued — Mechanical Systems
B00852836-Z3-GC
03/19/2026
Permit issued — Boiler Equipment
B00908308-S1-BE
01/28/2026
Permit issued — General Construction
B00852836-I1-GC
01/28/2026
Permit issued — General Construction
B00852836-S6-GC
01/27/2026
Permit issued — Support of Excavation
B01231979-I1-SE
01/27/2026
Permit issued — Construction Fence
B01239074-I1-FN
01/26/2026
Permit issued — Support of Excavation
B01231963-I1-SE
01/26/2026
Permit issued — Earth Work
B00852836-S5-EA
01/26/2026
Permit issued — Structural
B00852836-S1-ST
01/26/2026
Permit issued — Foundation
B00852836-S2-FO
01/23/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2026
Permit issued — Supported Scaffold
B01244493-I1-SF
11/14/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Permit issued — Standpipe
B00852836-S8-EW-SP
10/24/2025
Permit issued — Standpipe
B00852836-S8-EW-SD
10/22/2025
Permit issued — Plumbing
B00852836-S7-PL
10/09/2025
Signed off — Alteration
HEREWITH FILING TEMPORARY CONSTRUCTION FENCE INCONJUNCTION WITH NEW BUILDING FOUNDATION APPLICATION ONLY #B00852836. SEPARATE OR AEMENMEND APPLICATION IS REQUIRED FOR SUPERSTRUCTURE WORK.
B00994511-I1
09/09/2025
Permit issued — General Construction
B00852836-S6-MS
09/09/2025
Permit issued — Plumbing
B00852836-S4-PL
09/02/2025
Filed — Alteration
P.S.82K/INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SUPPORTED SCAFFOLD), RELATED JOB NUMBER B00852836. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01244493-P1
08/30/2025
Violation issued (ECB, closed)
Construction
08/30/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Construction
08/25/2025
Violation issued (ECB, closed)
Construction
08/25/2025
Violation issued (ECB, closed)
Construction
08/19/2025
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
08/04/2025
Permit issued — General Construction
B00852836-Z3-GC
08/04/2025
Permit issued — Structural
B00852836-S1-ST
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/29/2026
DOB NOWStandpipePermit IssuedA & F FIRE PROTECTION CO09/24/2026
DOB NOWSprinklersPermit IssuedA & F FIRE PROTECTION CO09/24/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC08/10/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. MECHANICAL INC08/10/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. MECHANICAL INC07/21/2026
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC07/15/2026
DOB NOWSupport of ExcavationPermit IssuedTECHNICO CONSTRUCTION05/01/2026
DOB NOWSupport of ExcavationPermit IssuedTECHNICO CONSTRUCTION05/01/2026
DOB NOWGeneral ConstructionPermit IssuedTECHNICO CONSTRUCTION05/01/2026
DOB NOWMechanical SystemsPermit IssuedTECHNICO CONSTRUCTION05/01/2026
DOB NOWGeneral ConstructionPermit IssuedR.A.M.S. MECHANICAL INC04/13/2026
DOB NOWGeneral ConstructionPermit IssuedTECHNICO CONSTRUCTION03/30/2026
DOB NOWMechanical SystemsPermit IssuedTECHNICO CONSTRUCTION03/30/2026
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP03/19/2026
DOB NOWGeneral ConstructionPermit IssuedTECHNICO CONSTRUCTION01/28/2026
DOB NOWGeneral ConstructionPermit IssuedTECHNICO CONSTRUCTION01/28/2026
DOB NOWSupport of ExcavationPermit IssuedTECHNICO CONSTRUCTION01/27/2026
DOB NOWConstruction FencePermit IssuedTECHNICO CONSTRUCTION01/27/2026
DOB NOWSupport of ExcavationPermit IssuedTECHNICO CONSTRUCTION01/26/2026
DOB NOWEarth WorkPermit IssuedTECHNICO CONSTRUCTION01/26/2026
DOB NOWStructuralPermit IssuedTECHNICO CONSTRUCTION01/26/2026
DOB NOWFoundationPermit IssuedTECHNICO CONSTRUCTION01/26/2026
DOB NOWSupported ScaffoldPermit IssuedROMA SCAFFOLDING INC01/14/2026
DOB NOWStandpipePermit IssuedADVANCED AUTO SPR.CO.,INC10/24/2025
DOB NOWStandpipePermit IssuedADVANCED AUTO SPR.CO.,INC10/24/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC10/22/2025
DOB NOWGeneral ConstructionPermit IssuedR.A.M.S. MECHANICAL INC09/09/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/09/2025
DOB NOWGeneral ConstructionPermit IssuedTECHNICO CONSTRUCTION08/04/2025
DOB NOWStructuralPermit IssuedTECHNICO CONSTRUCTION08/04/2025
DOB NOWSupport of ExcavationPermit IssuedTECHNICO CONSTRUCTION07/30/2025
DOB NOWSupport of ExcavationPermit IssuedTECHNICO CONSTRUCTION07/30/2025
DOB NOWSupported ScaffoldPermit IssuedROMA SCAFFOLDING INC07/29/2025
DOB NOWGeneral ConstructionPermit IssuedTECHNICO CONSTRUCTION07/29/2025
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC07/22/2025
DOB NOWConstruction FencePermit IssuedTECHNICO CONSTRUCTION07/02/2025
DOB NOWEarth WorkPermit IssuedTECHNICO CONSTRUCTION05/19/2025
DOB NOWFoundationPermit IssuedTECHNICO CONSTRUCTION05/16/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC03/04/2025
+ 16 more permits on file
1 project · most recent 05/19/2025
Heating and Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/19/2025Permit IssuedR.A.M.S. MECHANICAL INCHeating and Air Conditioning Systems, Others, Ventilation Systems
Other
— OBAR GBR89 150 CFM · Exhaust Fan ×8
1 project · most recent 05/19/2025
Sprinkler System
FiledStatusContractorScope
05/19/2025Permit IssuedA & F FIRE PROTECTION COSprinkler System
1 project · most recent 05/19/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/19/2025Permit IssuedPAR PLUMBING CO., INCStorm, Water/Sanitary
11 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedMULTI-PHASE ELEC'L SVCSGeneral Wiring
11/05/2025Permit IssuedMULTI-PHASE ELEC'L SVCS—
07/22/2025Permit IssuedMULTI-PHASE ELEC'L SVCS—
05/19/2025Permit IssuedDENALI ELECTRIC CORP—
04/17/2025Permit IssuedMULTI-PHASE ELEC'L SVCS—
04/15/2025Permit IssuedMULTI-PHASE ELEC'L SVCSGeneral Wiring
04/03/2025Permit IssuedMULTI-PHASE ELEC'L SVCS—
03/21/2025Permit IssuedMULTI-PHASE ELEC'L SVCS—
06/12/2020CompleteSTANCO SYSTEM ELEC'L CONT1 meters, 1 new_meters
05/22/2020Permit IssuedSTANCO SYSTEM ELEC'L CONT—
08/17/2018CompleteNASH ELECTRIC SERVICES IN—
3 projects · most recent 06/03/2025
Steel Concrete
FiledStatusContractorScope
06/03/2025Permit IssuedTECHNICO CONSTRUCTION1 scope_items
05/29/2025Permit IssuedTECHNICO CONSTRUCTION1 scope_items
05/19/2025Permit IssuedPAR PLUMBING CO., INCSteel, Concrete
3 projects · most recent 06/23/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
06/23/2026Permit IssuedROMA SCAFFOLDING INCScaffold
06/11/2025Permit IssuedTECHNICO CONSTRUCTIONFence
06/05/2025Permit IssuedROMA SCAFFOLDING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
07/23/2026Sprayed fire-resistant materialsSTEPHEN LATUSspecial
07/23/2026MasonrySTEPHEN LATUSspecial
07/23/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
07/23/2026Fire-Resistance Rated ConstructionSTEPHEN LATUSprogress
07/23/2026Energy Code Compliance InspectionsSTEPHEN LATUSprogress
07/23/2026Subsurface Investigations (Borings/Test Pits)Tommy Maenespecial
07/23/2026Wall Panels, Curtain Walls, and VeneersSTEPHEN LATUSspecial
08/19/2025Post-installed AnchorsSTEPHEN LATUSspecial
05/28/2025Standpipe SystemsSTEPHEN LATUSspecial
05/28/2025Post-installed AnchorsSTEPHEN LATUSspecial
05/28/2025Sprinkler SystemsSTEPHEN LATUSspecial
05/28/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
05/27/2025Excavations - Sheeting, Shoring, and BracingSTEPHEN LATUSspecial
05/27/2025Excavations - Sheeting, Shoring, and BracingSTEPHEN LATUSspecial
05/15/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
05/15/2025Post-installed AnchorsSTEPHEN LATUSspecial
05/15/2025Sprinkler SystemsSTEPHEN LATUSspecial
05/15/2025Standpipe SystemsSTEPHEN LATUSspecial
03/12/2025Fenestration areasSTEPHEN LATUSenergy_progress
03/12/2025Fenestration air leakageSTEPHEN LATUSenergy_progress
03/12/2025Air barrier - visual inspectionSTEPHEN LATUSenergy_progress
03/12/2025Insulation placement and R valuesSTEPHEN LATUSenergy_progress
03/12/2025Fenestration and door U-factor and product ratingsSTEPHEN LATUSenergy_progress
10/17/2024Fenestration air leakage—energy_progress
10/17/2024Fenestration areas—energy_progress
Latest 25 of 90.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Is82kEducation—
Project B01231979 Alteration · Permit Entire · 05/29/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 336 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch30
09/03/2026B00050419-I1Request digital key ↗
09/03/2026B00071944-I1Request digital key ↗
09/03/2026B00071702-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/14/2026B00908985-I1Request digital key ↗
08/14/2026B00908984-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION12
03/03/2023300656298Open ↗
12/01/2022322037201Open ↗
11/30/2022322037201Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP Stormwater Construction Permit7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
05/26/2020322037201Open ↗
05/26/2020322037201Open ↗
09/10/2018321779571Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
09/10/2018321779571Open ↗
09/10/2018321779571Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00852836-P2Open ↗
08/13/2026B00852836-P3Open ↗
08/13/2026B00852836-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00852836-P3Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications78
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/03/2026B00050419-I1Open ↗
09/03/2026B00071944-I1Open ↗
09/03/2026B00071702-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026B00852836-S5Open ↗
09/25/2026B00908308-S1Open ↗
09/23/2026B00852836-S6Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/29/2026B00852836-S5Open ↗
09/23/2026B00852836-S6Open ↗
09/23/2026B00852836-S6Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/22/2020322037201Open ↗
05/22/2020322037201Open ↗
05/19/2020322037201Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/19/2020322037201Open ↗
05/19/2020322037201Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/19/2020322037201Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISELECTRIC CUT-OFF1
09/10/2018321779571Open ↗
▸BISSEWER CUT-OFF1
09/10/2018321779571Open ↗
▸BISGAS CUT-OFF1
09/10/2018321779571Open ↗
▸Safety & Tenant Protection20
▸DOB NOWStreet Tree Checklist7
08/27/2026B00852836-P3Open ↗
08/27/2026B00852836-P1Open ↗
08/27/2026B00852836-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/20/2026B01244493-I1Open ↗
08/15/2026B01244493-P2Open ↗
08/13/2026B00994511-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/10/2018321779571Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/10/2018321779571Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/10/2018321779571Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/10/2018321779571Open ↗
▸BISRODENT CONTROL1
09/10/2018321779571Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026B00871966-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/03/2026B00071702-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/19/2020322037201Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026B00852836-P3Open ↗
08/13/2026B00852836-P2Open ↗
08/13/2026B00852836-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/28/2022322037201Open ↗
11/09/2022322037201Open ↗
▸Approvals, Objections & Sign-offs77
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter31
09/03/2026B00071944-I1Open ↗
09/03/2026B00071702-I1Open ↗
08/27/2026B00852836-Z3Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)27
08/20/2026B01244493-I1Open ↗
08/15/2026B00908308-I1Open ↗
08/15/2026B01244493-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)16
08/15/2026B00908308-I1Open ↗
08/13/2026B00852836-I1Open ↗
08/13/2026B00852836-S1Open ↗
Showing 3 of 16 on file for this type
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/09/2022322037201Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/02/2022322037201Open ↗
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT1
05/19/2020322037201Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/14/2022322037201Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
09/10/2018321779571Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/10/2018321779571Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION7
11/28/2022322037201Open ↗
11/22/2022322037201Open ↗
12/07/2020322037201Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAI1 Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEFILING COVER SHEET3
05/19/2020322037201Open ↗
05/19/2020322037201Open ↗
05/07/2018321779571Open ↗
▸Other Documents59
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal29
08/20/2026B01244493-I1Open ↗
08/15/2026B00908308-I1Open ↗
08/15/2026B01244493-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSite Survey: Initial7
08/13/2026B00852836-P1Open ↗
08/13/2026B00852836-S6Open ↗
08/13/2026B00852836-Z3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAdjoining Owners Notification5
08/13/2026B00871966-S1Open ↗
08/13/2026B01231963-I1Open ↗
08/13/2026B01231979-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/27/2026B00852836-P1Open ↗
08/27/2026B00852836-P3Open ↗
08/27/2026B00852836-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026B00871966-I1Open ↗
08/13/2026B00871966-S1Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
09/10/2018321779571Open ↗
▸DOB NOWAlternate Plan 41
08/14/2026B00908985-I1Open ↗
▸DOB NOWAlternate Plan 21
08/14/2026B00908985-I1Open ↗
▸DOB NOWAlternate Plan 11
08/14/2026B00908985-I1Open ↗
▸DOB NOWAlternate Plan 31
08/14/2026B00908985-I1Open ↗