← Back
BuildNYC
Miscellaneous religious facility
633 WEST 115TH STREET
MANHATTAN · Morningside Heights · BIN 1057375
💬 Discuss this project
2019Year Built
3Stories
M9Building Class
R8Zoning
7,835 sfGross Floor Area
1Units
Rent Stabilized0 Active Violations
Miscellaneous religious facility · 2,523 sf lot · 3.11 FAR built · Flood zone X
Locations of Work
StructuralFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofKorean Methodist Church & Institute2p · 1 filing · 4 docs
Floor 3Korean Methodist Church & Institute2p · 1 filing · 4 docs
Floor 2Korean Methodist Church & Institute3p · 1 filing · 4 docs
Floor 1Korean Methodist Church & Institute3p · 2 filings · 8 docs
MezzanineKorean Methodist Church & Institute3p · 1 filing · 4 docs
CellarKorean Methodist Church & Institute2p · 1 filing · 4 docs
Site & exteriorHeavy Duty Pipe Scaffold2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Korean Methodist Church Instit6007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering & Associates107/28/2020
Ashraf101/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eurocelt Expediting203/21/2026
Metropolis Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Let Me BuildGeneral Contractor503/22/2026
Republic Scaffold & HoistScaffold303/21/2026
Heads Up Fire SprinklerFire Protection207/08/2026
Star Electrical ContractorsElectrical103/22/2026
Rael Automatic Sprinkler CoFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Renant Antren4307107/28/2020
Building Lifecycle
All (43)Filed (2)Permit Issued (4)Signed Off (2)Violation (35)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2023
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NB FILING.
M00375739-I1
02/28/2023
Signed off — Alteration
M00306796-I1
06/25/2021
Permit issued — Sprinklers
M00375739-I1-EW-SP
05/05/2021
Permit issued — Sprinklers
M00375739-I1-EW-SP
09/04/2020
Permit issued — Sprinklers
M00375739-I1-EW-SP
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2020
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NB FILING.
M00375739-I1
03/27/2020
Violation issued (ECB, closed)
Construction
02/04/2020
Violation issued (ECB, closed)
Construction
02/04/2020
Violation issued (ECB, closed)
Construction
02/04/2020
Violation issued (ECB, closed)
Construction
01/31/2020
Permit issued — Supported Scaffold
M00306796-I1-SF
01/30/2020
Filed — Alteration
M00306796-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/2018
Violation issued (ECB, closed)
Construction
12/26/2018
Violation issued (ECB, closed)
Construction
12/26/2018
Violation issued (ECB, closed)
Construction
12/26/2018
Violation issued (ECB, closed)
Construction
12/26/2018
Violation issued (ECB, closed)
Boilers
12/26/2018
Violation issued (ECB, closed)
Construction
12/26/2018
Violation issued (ECB, closed)
Unknown
08/29/2018
Violation issued (ECB, closed)
Construction
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/2017
Violation issued (HPD, closed)
I
09/26/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/15/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/03/2015
Violation issued (HPD, closed)
I
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/1999
Violation issued (HPD, closed)
B
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/1987
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offHeads Up Fire Sprinkler.i06/25/2021
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co05/05/2021
DOB NOWSprinklersSigned-offHeads Up Fire Sprinkler.i09/04/2020
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist01/31/2020
BISOTISSUEDSite Enter05/12/2022
BISEQISSUEDLet Me Build03/24/2021
BIS—ISSUEDLet Me Build03/24/2021
BIS—ISSUEDLet Me Build03/15/2021
BISPLISSUEDGlenns Plumbing Services11/09/2020
BIS—ISSUEDLet Me Build03/19/2020
BISEQISSUEDLet Me Build11/15/2019
BISPLISSUEDGlenns Plumbing Services09/19/2019
BISEQISSUEDLet Me Build07/09/2019
BISOTISSUEDLet Me Build06/07/2019
BIS—ISSUEDLet Me Build04/01/2019
BIS—RE-ISSUEDLet Me Build03/27/2019
BIS—ISSUEDLet Me Build11/26/2018
BISEQRE-ISSUEDLet Me Build11/07/2018
BIS—ISSUEDLet Me Build11/07/2018
BISEQISSUEDRepublic Scaffold & Hoist09/10/2018
BISEQISSUEDRepublic Scaffold & Hoist08/14/2018
BISEQISSUEDLet Me Build05/24/2018
BIS—ISSUEDAlba Services05/24/2018
BISOTISSUEDLet Me Build11/14/2017
BISEQISSUEDRepublic Scaffold & Hoist09/06/2017
BISEQISSUEDRepublic Scaffold & Hoist08/31/2017
BIS—ISSUEDAlba Services05/24/2017
BISEQISSUEDLatempa Services08/05/2016
BISOTISSUEDLet Me Build03/01/2016
BISOTISSUEDLet Me Build11/04/2015
2 projects · most recent 09/14/2021
General Wiring
FiledStatusContractorScope
09/14/2021CompleteJanon ElectricGeneral Wiring
09/14/2020CompleteStar Electrical Contractors—
Nothing on file for this building.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Korean Methodist Church & InstituteReligiousCellar, Floors 1–3, Mezzanine, Roof
Project M00375739 Alteration · LOC Issued · 07/28/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 396 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00375739-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00306796-I1Request digital key ↗
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION54
07/23/2024121583553Open ↗
07/16/2024121583553Open ↗
04/23/2024121705636Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION27
05/12/2022140998838Open ↗
03/16/2021121583553Open ↗
03/20/2020121583553Open ↗
Showing 3 of 27 on file for this type
▸BISPLACE OF ASSEMBLY4
01/17/2024121591615Open ↗
01/17/2024121591615Open ↗
09/07/2023121591615Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
01/17/2024121591615Open ↗
01/17/2024121591615Open ↗
06/20/2019123810625Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
05/21/2021140998838Open ↗
06/20/2019123810625Open ↗
Showing 2 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/20/2019123810625Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M00375739-I1Open ↗
08/13/2026M00306796-I1Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING7
09/29/2021121583553Open ↗
08/12/2021121583553Open ↗
08/06/2021121583553Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS3
04/20/2022121583553Open ↗
01/13/2022121583553Open ↗
01/13/2022121583553Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
04/07/2022121640643Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/13/2022121583553Open ↗
▸Safety & Tenant Protection19
▸BISSRO MD ANTI-HARASSMENT CHECKLIST8
06/20/2019123810625Open ↗
04/01/2019123410399Open ↗
Showing 2 of 8 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
03/12/2019123410406Open ↗
Showing 1 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist2
08/13/2026M00375739-I1Open ↗
08/13/2026M00306796-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
04/20/2022121583553Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
05/21/2021140998838Open ↗
Showing 1 of 6 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/13/2019123410406Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/12/2022140998838Open ↗
10/28/2021121583553Open ↗
08/17/2021121583553Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
10/12/2022140998838Open ↗
04/20/2022121583553Open ↗
▸BISINTERIOR LIGHTING POWER2
09/02/2022140998838Open ↗
04/20/2022121583553Open ↗
▸BISLIGHTING CONTROLS2
09/02/2022140998838Open ↗
04/20/2022121583553Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/28/2023121583553Open ↗
09/02/2022140998838Open ↗
▸BISELECTRIC MOTORS1
04/20/2022121583553Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/20/2022121583553Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/28/2023121591615Open ↗
01/03/2023123136356Open ↗
09/28/2022140998838Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
07/20/2023121583553Open ↗
10/07/2022121583553Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
10/11/2022140998838Open ↗
04/20/2022121583553Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
06/15/2022123410399Open ↗
04/20/2022121583553Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
10/12/2022140998838Open ↗
04/20/2022121583553Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/03/2020121583553Open ↗
Showing 1 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
06/15/2022123410399Open ↗
04/20/2022121583553Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
06/15/2022123410399Open ↗
04/20/2022121583553Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/20/2022121583553Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs45
▸BISLETTERS - SUPPORTING DOCUMENTATION9
09/25/2024121583553Open ↗
01/17/2024121591615Open ↗
09/13/2019123136347Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/22/2023121591615Open ↗
01/24/2023123136356Open ↗
10/18/2022140998838Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
04/03/2019121583553Open ↗
04/03/2019121583553Open ↗
03/28/2019121583553Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/23/2024121583553Open ↗
09/08/2023121583553Open ↗
Showing 2 of 4 on file for this type
▸BISLANDMARKS APPROVAL4
10/05/2022140998838Open ↗
05/21/2021140998838Open ↗
04/02/2019123410399Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
09/15/2022140998838Open ↗
06/16/2022123810625Open ↗
06/16/2022123410399Open ↗
▸BISFINAL3
01/18/2023123136356Open ↗
10/12/2022140998838Open ↗
06/23/2022123410399Open ↗
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M00306796-I1Open ↗
08/13/2026M00375739-I1Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT13
05/21/2021140998838Open ↗
06/20/2019123810625Open ↗
03/13/2019123410406Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
03/20/2020121583553Open ↗
03/27/2019121583553Open ↗
Showing 2 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
06/09/2022123410399Open ↗
06/09/2022123810625Open ↗
06/09/2022140998838Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET19
06/20/2019123810625Open ↗
03/13/2019123410406Open ↗
Showing 2 of 19 on file for this type
▸BISADDITIONAL INFORMATION15
08/12/2024121583553Open ↗
05/07/2024121705636Open ↗
10/11/2022140998838Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM8
01/17/2024121591615Open ↗
03/20/2020121583553Open ↗
07/09/2019123410406Open ↗
Showing 3 of 8 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
01/24/2023123136356Open ↗
07/10/2019123810625Open ↗
03/12/2019123410399Open ↗
Showing 3 of 9 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISRESTRICTION: DEED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISMAINTENANCE INFORMATION2
09/02/2022140998838Open ↗
04/20/2022121583553Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL2
06/15/2022123410399Open ↗
04/20/2022121583553Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
01/10/2022121583553Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/20/2022121583553Open ↗
▸BISSITE CONNECTION:DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type