Harkness Pavilion
635 WEST 165TH STREET · BIN 1084198
💬 Discuss this project
1930Year Built
22Stories
I1Building Class
R8Zoning
3,693,539 sfGross Floor Area
1Units
LL97 Covered6 Active Violations 0 unresolved · 6 paperwork only 2 likely answered 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Hospital, sanitarium, mental institution · 364,433 sf lot · 10.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNew York Presbyterian Hospital, NewYork-Presbyterian4 filings
RoofNew York Presbyterian Hospital1 filing · 2 docs
Floor 9NewYork-Presbyterian3p · 2 filings · 10 docs
Floor 8New York Presbyterian Hospital, NewYork-Presbyterian7p · 4 filings · 10 docs
Floor 7New York Presbyterian Hospital, NewYork-Presbyterian3p · 5 filings · 17 docs
Floor 6New York Presbyterian Hospital, NewYork-Presbyterian6p · 5 filings · 17 docs
Floor 5New York Presbyterian Hospital, NewYork-Presbyterian5p · 3 filings · 12 docs
Floor 4New York Presbyterian Hospital, 4th Eye Institute +15p · 5 filings · 17 docs
Floor 3New York Presbyterian Hospital1 filing · 2 docs
Floor 2New York Presbyterian Hospital1 filing · 2 docs
Floor 1New York Presbyterian Hospital, NewYork-Presbyterian3p · 4 filings · 17 docs
CellarNew York Presbyterian Hospital, NewYork-Presbyterian2p · 3 filings · 18 docs
BasementNewYork-Presbyterian1p · 1 filing · 8 docs
Site & exteriorNew York Presbyterian Hospital, NewYork-Presbyterian +1Under Construction8 filings · 14 docs
Filed — no permit issuedNewYork-Presbyterian1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York Presbyterian Hospital25907/08/2026
Columbia University3303/21/2026
CKC Associates LLP C/O FS Restoration203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Expediting8803/21/2026
Eurocelt Expediting1403/21/2026
Howard I Shapiro Associates1403/21/2026
NYC Approvals203/21/2026
Valjato Engineering P203/21/2026
Lombardo Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consigli Construction CoGeneral Contractor2107/08/2026
Lendlease (US) ConstructionGeneral Contractor1807/08/2026
Gramercy GroupGeneral Contractor1707/08/2026
Starr IndustriesScaffold1107/08/2026
Gramercy GroupScaffold707/08/2026
Sirina Fire ProtectionFire Protection407/08/2026
Welkin EnterprisesPlumbing307/08/2026
Consigli Construction CoScaffold307/08/2026
Lendlease (US) ConstructionScaffold307/08/2026
Universal Builders SupplyScaffold207/08/2026
Civetta MechanicalPlumbing207/08/2026
Dobs Elevator CompanyElectrical103/21/2026
Western Waterproofing CompanyScaffold107/08/2026
J.A. Lee Electric ServicesElectrical103/22/2026
Dooley Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4233203/19/2025
Valjato Engineering2486112/23/2024
Langan Engineering, Env, Surveyin1265408/08/2024
Building Lifecycle
All (280)Filed (62)Permit Issued (66)Signed Off (29)Facade (FISP) (13)Violation (60)Inspection (10)Objection (10)Special Inspection (30)
05/01/2026
Signed off — Alteration
M01215539-I1
04/24/2026
Permit issued — Construction Fence
M01215539-I1-FN
01/28/2026
Signed off — Alteration
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#123917299. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
M00995519-I1
12/19/2025
Permit issued — Foundation
M00811687-I1-GC-CX
12/19/2025
Permit issued — Construction Fence
M00895458-I1-FN
11/06/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY BRACING TO SUPPORT EXISTING TUNNEL TO REMAIN, FILED IN CONJUNCTION WITH FULL DM-123917299.
M00900002-I1
10/01/2025
Signed off — Alteration
M00997555-I1
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
06/13/2025
Signed off — Alteration
Sprinkler, standpipe, plumbing installation including medical gas piping in the utility tunnel to accommodate the hospital.
M00812558-I1
06/12/2025
Signed off — Alteration
M00812597-I1
06/10/2025
Signed off — Alteration
M01154934-I1
06/04/2025
Signed off — Alteration
Eye Institute Utility Chase: Architectural work to accommodate modifications to the utility tunnel service adjacent hospital buildings.
M00811669-I1
06/03/2025
Signed off — Alteration
Install new piping in the utility chase tunnel, connect to the existing system serving the hospital buildings.
M00811716-I1
05/29/2025
FISP facade report submitted
05/27/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction throughout floors cellar, 1-9, in the existing building. No change to zoning, use, egress or occupancy.
M00938938-I1
05/05/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: HVAC removals throughout floors cellar, 1-9, in the existing building. No change to zoning, use, egress or occupancy.
M00938943-I1
05/05/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction throughout floors cellar, 1-9, in the existing building. No change to zoning, use, egress or occupancy.
M00938938-S2
04/29/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction throughout floors cellar, 1-9, in the existing building. No change to zoning, use, egress or occupancy.
M00938938-S1
04/29/2025
Signed off — Alteration
INSTALLATION OF GIN POLE FOR MATERIAL LIFTING DURING DEMOLITION, FILED SEPARATELY.
M01023207-I1
04/28/2025
Permit issued — Construction Fence
M01215539-I1-FN
04/28/2025
Permit issued — Structural
M00900002-I1-ST
04/25/2025
Filed — Alteration
M01215539-I1
04/24/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED/OVERHEAD PROTECTION AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED/OVERHEAD PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
M00997291-I1
04/11/2025
Signed off — Alteration
INSTALLATION OF A SCAFFOLD SYSTEM AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
M00997446-I1
03/31/2025
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
03/27/2025
Signed off — Alteration
INSTALLATION OF A P/M HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
M00997535-I1
03/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
03/21/2025
Special inspection requirement — Structural Steel - Details
Young Suh
03/21/2025
Special inspection requirement — Structural Steel - Welding
Young Suh
03/21/2025
Special inspection requirement — Post-installed Anchors
Young Suh
03/21/2025
Special inspection requirement — Final
Thomas Tagliano
03/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BRACING TO SUPPORT EXISTING TUNNEL TO REMAIN, FILED IN CONJUNCTION WITH FULL DM-123917299.
M00900002-P1
03/14/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 4th floor of Eye Institute, in the existing hospital building. No change to zoning, use, egress or occupancy.
M00921008-I1
03/14/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on floors 4-8 of Eye Research, in the existing building. No change to use, egress or occupancy.
M00920932-I1
03/10/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: HVAC ductwork removals on floors 4-8 of Eye Research, in the existing building. No change to use, egress or occupancy.
M00938734-I1
03/10/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Plumbing, sprinkler, standpipe removals on 4th floor of Eye Institute, in the existing hospital building. No change to zoning, use, egress or occupancy.
M00938877-I1
03/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/28/2025
Permit issued — Construction Fence
M00997555-I1-FN
02/28/2025
Permit issued — Sidewalk Shed
M00997291-I1-SH
02/28/2025
Permit issued — Supported Scaffold
M00997446-I1-SF
02/19/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 6th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.
M00921035-I1
02/19/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO; HVAC removals on 6th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.
M00938894-I1
02/19/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 7th & 9th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.
M00921047-I1
02/19/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Plumbing, sprinkler, standpipe removals on 8th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.
M00938927-I1
02/19/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: HVAC removals on 7th & 9th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.
M00938909-I1
02/18/2025
Signed off — Alteration
EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 8th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.
M00921057-I1
02/13/2025
Permit issued — Structural
M00900002-I1-ST
02/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BRACING TO SUPPORT EXISTING TUNNEL TO REMAIN, FILED IN CONJUNCTION WITH FULL DM-123917299.
M00900002-I1
02/04/2025
Signed off — Alteration
M01053268-I1
02/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/03/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/31/2024
Permit issued — Protection and Mechanical Methods
M01154934-I1-PMM
12/27/2024
Permit issued — Foundation
M00811687-I1-GC-CX
12/27/2024
Permit issued — General Construction
M00812597-I1-GC
12/27/2024
Permit issued — Structural
M00802449-I1-ST
12/27/2024
Permit issued — Construction Fence
M00895458-I1-FN
12/27/2024
Permit issued — Mechanical Systems
M00811716-I1-MS
12/27/2024
Permit issued — General Construction
M00802441-I1-GC
Latest 60 of 280 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offUniversal Builders Supply04/24/2026
DOB NOWFoundationPermit IssuedConsigli Construction Co12/19/2025
DOB NOWConstruction FencePermit IssuedConsigli Construction Co12/19/2025
DOB NOWConstruction FenceSigned-offUniversal Build Supp04/28/2025
DOB NOWStructuralSigned-offConsigli Construction Co04/28/2025
DOB NOWConstruction FenceSigned-offStarr Industries02/28/2025
DOB NOWSidewalk ShedSigned-offStarr Industries02/28/2025
DOB NOWSupported ScaffoldSigned-offStarr Industries02/28/2025
DOB NOWStructuralSigned-offGramercy Group02/13/2025
DOB NOWProtection and Mechanical MethodsSigned-offGramercy Group12/31/2024
DOB NOWFoundationPermit IssuedConsigli Construction Co12/27/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2024
DOB NOWStructuralSigned-offConsigli Construction Co12/27/2024
DOB NOWConstruction FencePermit IssuedConsigli Construction Co12/27/2024
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/27/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2024
DOB NOWPlumbingSigned-offCivetta Mechanical12/11/2024
DOB NOWStandpipeSigned-offSirina Fire Protection12/11/2024
DOB NOWSprinklersSigned-offSirina Fire Protection12/11/2024
DOB NOWStructuralPermit IssuedConsigli Construction Co10/28/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co10/28/2024
DOB NOWConstruction FencePermit IssuedConsigli Construction Co09/13/2024
DOB NOWStructuralSigned-offConsigli Construction Co09/13/2024
DOB NOWMechanical SystemsSigned-offConsigli Construction Co09/13/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co09/13/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co09/13/2024
DOB NOWConstruction FencePermit IssuedLendlease (US) Construction08/02/2024
DOB NOWSupport of ExcavationSigned-offLendlease (US) Construction08/02/2024
DOB NOWStandpipeSigned-offWelkin Enterprises08/01/2024
DOB NOWMechanical SystemsSigned-offGramercy Group07/09/2024
DOB NOWGeneral ConstructionSigned-offGramercy Group07/09/2024
DOB NOWStandpipeSigned-offWelkin Enterprises07/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offWestern Waterproofing Company05/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offGramercy Group05/20/2024
DOB NOWGeneral ConstructionSigned-offLendlease (US) Construction04/24/2024
DOB NOWGeneral ConstructionSigned-offGramercy Group03/28/2024
DOB NOWMechanical SystemsSigned-offGramercy Group03/28/2024
DOB NOWGeneral ConstructionSigned-offGramercy Group03/28/2024
DOB NOWMechanical SystemsSigned-offGramercy Group03/28/2024
+ 60 more permits on file
3 projects · most recent 09/23/2024
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
09/23/2024Signed-offGramercy GroupAssociated Ducts and Piping
Ducts & Piping
N/A 100 1 BTU · Ductwork ×1
11/15/2023Signed-offGramercy GroupAssociated Ducts and Piping
Ducts & Piping
N/A 100 1 BTU · Ductwork ×1
11/15/2023Signed-offGramercy GroupAssociated Ducts and Piping
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×1
5 projects · most recent 09/23/2024
FiledStatusContractorScope
09/23/2024——1 heads, 1 outlets
11/15/2023——1 heads, 1 outlets
11/15/2023——1 heads, 1 outlets
11/15/2023———
11/15/2023——1 heads, 1 outlets
6 projects · most recent 09/23/2024
Medical Gas Water/Sanitary Storm
FiledStatusContractorScope
09/23/2024——Medical Gas, Water/Sanitary
11/15/2023——Medical Gas, Water/Sanitary
11/15/2023——Medical Gas, Water/Sanitary
11/15/2023——Medical Gas, Water/Sanitary
11/15/2023——Medical Gas, Water/Sanitary
09/26/2023——Storm
7 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026Permit IssuedAllran Electric of NY—
08/05/2026CompleteE-J Electric Installation Co—
12/23/2025Permit IssuedE-J Electric Installation CoGeneral Wiring
04/19/2024CompleteE-J Electric Installation Co—
04/19/2024CompleteE-J Electric Installation Co—
03/12/2024CompleteJ.A. Lee Electric Services—
03/07/2024CompleteJ.A. Lee Electric Services—
2 projects · most recent 08/08/2024
Concrete Steel
FiledStatusContractorScope
08/08/2024Permit IssuedConsigli Construction CoConcrete
02/07/2023Signed-offConsigli Construction CoSteel, Concrete
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/31/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
03/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/04/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/03/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/16/2024Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
03/21/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
03/21/2025Structural Steel - DetailsYoung Suhspecial
03/21/2025Post-installed AnchorsYoung Suhspecial
03/21/2025FinalThomas Taglianoprogress
03/21/2025Structural Steel - WeldingYoung Suhspecial
12/27/2024FinalYoung Suhprogress
12/27/2024FinalYoung Suhprogress
12/27/2024FinalYoung Suhprogress
12/12/2024Fire-Resistance Rated ConstructionYoung Suhprogress
12/12/2024FinalYoung Suhprogress
12/12/2024FinalYoung Suhprogress
12/12/2024FinalYoung Suhprogress
12/12/2024Final—progress
12/06/2024Sprinkler SystemsYoung Suhspecial
12/06/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
12/06/2024Standpipe SystemsYoung Suhspecial
12/06/2024Post-installed AnchorsYoung Suhspecial
11/18/2024Post-installed AnchorsYoung Suhspecial
11/18/2024Standpipe SystemsYoung Suhspecial
11/18/2024Sprinkler SystemsYoung Suhspecial
11/18/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
08/13/2024Concrete - Cast-In-PlaceYoung Suhspecial
08/13/2024Subgrade InspectionsAlan Poeppelspecial
08/13/2024Structural Stability – Alterations of existing buildingsYoung Suhspecial
08/13/2024Subsurface Conditions – Fill Placement & In-Place DensityYoung Suhspecial
Latest 25 of 99.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Harkness Eye InstituteMedical / Healthcare—
Project M00997535 Alteration · LOC Issued · 03/13/2024
NewYork-PresbyterianMedical / HealthcareCellar, Floors 1–9
Project M00938927 Alteration · LOC Issued · 11/15/2023
Project M00938943 Alteration · LOC Issued · 11/15/2023
Project M00938734 Alteration · LOC Issued · 11/14/2023
Project M00938894 Alteration · LOC Issued · 11/14/2023
Project M00938909 Alteration · LOC Issued · 11/14/2023
Project M00921035 Alteration · LOC Issued · 11/01/2023
Project M00921047 Alteration · LOC Issued · 11/01/2023
Project M00921057 Alteration · LOC Issued · 11/01/2023
Project M00812597 Alteration · LOC Issued · 04/04/2023
Project M00812607 Alteration · Approved · 04/04/2023
Project M00812558 Alteration · LOC Issued · 03/21/2023
Project M00811716 Alteration · LOC Issued · 03/14/2023
4th Eye InstituteMedical / HealthcareFloor 4
Project M00938877 Alteration · LOC Issued · 11/14/2023
Project M00921008 Alteration · LOC Issued · 11/01/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,183 on file (BIS + DOB NOW)
▸Plans & Drawings62
▸DOB NOWPlans/Sketch62
09/01/2026M00802449-I1Request digital key ↗
09/01/2026M00802449-P2Request digital key ↗
09/01/2026M00802449-P1Request digital key ↗
Showing 3 of 62 on file for this type
▸Applications & Permits193
▸BISPLAN / WORK APPROVAL APPLICATION114
05/16/2025124055066Open ↗
03/21/2025123917299Open ↗
04/12/2024123917299Open ↗
Showing 3 of 114 on file for this type
▸BISWORK PERMIT APPLICATION79
09/20/2024123917299Open ↗
09/20/2024123917299Open ↗
09/20/2024123917299Open ↗
Showing 3 of 79 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications270
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION122
09/20/2024123917299Open ↗
09/20/2024123917299Open ↗
06/11/2019122130318Open ↗
Showing 3 of 122 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature62
09/01/2026M00802449-P2Open ↗
09/01/2026M00802449-I1Open ↗
09/01/2026M00802449-P1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
09/23/2026M00995519-I1Open ↗
09/02/2026M00938877-I1Open ↗
09/01/2026M00812558-P1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026M00921008-P1Open ↗
09/02/2026M00938877-I1Open ↗
09/01/2026M00802449-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
05/24/2018123215252Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
05/24/2018123215252Open ↗
04/03/2017123014166Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment81
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
03/20/2018122132637Open ↗
08/14/2017122546165Open ↗
08/08/2017123014166Open ↗
Showing 3 of 23 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA18
10/04/2019122133949Open ↗
08/12/2019122133949Open ↗
03/28/2019123257206Open ↗
Showing 3 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS6
04/09/2019122671028Open ↗
04/09/2019122671028Open ↗
04/09/2019122671466Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
04/09/2019122671028Open ↗
04/09/2019122671466Open ↗
10/23/2017122132637Open ↗
Showing 3 of 5 on file for this type
▸BISSIGN HANGER CERTIFICATE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER SYSTEMS2
02/22/2022122130318Open ↗
02/22/2022122130318Open ↗
▸BISGAS CUT-OFF1
09/20/2024123917299Open ↗
▸BISWATER CUT-OFF1
09/20/2024123917299Open ↗
▸BISELECTRIC CUT-OFF1
09/20/2024123917299Open ↗
▸DOB NOWFDNY: Letter of No Objection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
09/20/2024123917299Open ↗
09/20/2024123917299Open ↗
▸BISDS1-Demolition Submittal Certification Form2
09/20/2024123917299Open ↗
Showing 1 of 2 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/20/2024123917299Open ↗
▸Environmental & Asbestos96
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form19
08/28/2026M00921057-I1Open ↗
08/28/2026M00938938-I1Open ↗
08/28/2026M00938909-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/01/2026M00802449-P2Open ↗
09/01/2026M00802449-I1Open ↗
09/01/2026M00802441-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice to Proceed14
08/28/2026M00921035-I1Open ↗
08/28/2026M00921008-I1Open ↗
Showing 2 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
08/28/2026M00921035-I1Open ↗
08/28/2026M00921008-I1Open ↗
Showing 2 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/13/2018123215252Open ↗
04/03/2017123014166Open ↗
Showing 2 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRODENT CONTROL1
09/20/2024123917299Open ↗
▸Energy Compliance71
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS49
06/11/2019122130318Open ↗
06/11/2019122130318Open ↗
04/03/2019122671466Open ↗
Showing 3 of 49 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
06/11/2019122130318Open ↗
04/10/2019122671466Open ↗
04/03/2019122671466Open ↗
Showing 3 of 16 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSOIL REPORT2
08/31/2026M00811656-I1Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs127
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter62
08/31/2026M00811656-I1Open ↗
08/31/2026M00812558-P1Open ↗
08/31/2026M00812597-I1Open ↗
Showing 3 of 62 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
10/04/2019122133949Open ↗
04/15/2019122551611Open ↗
04/10/2019122671466Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
09/20/2024123917299Open ↗
09/20/2024123917299Open ↗
Showing 2 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
07/30/2018122671466Open ↗
Showing 1 of 3 on file for this type
▸BISSUPERSEDING LETTER1
05/26/2017122132637Open ↗
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership93
▸BISCOST AFFIDAVIT92
10/04/2019122133949Open ↗
04/15/2019122551611Open ↗
04/10/2019122671466Open ↗
Showing 3 of 92 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/20/2024123917299Open ↗
▸Filing & Intake Forms122
▸BISEFILING COVER SHEET59
05/16/2025124055066Open ↗
02/27/2024123917299Open ↗
12/29/2022123917299Open ↗
Showing 3 of 59 on file for this type
▸BISADDITIONAL INFORMATION42
09/20/2024123917299Open ↗
09/20/2024123917299Open ↗
11/22/2017122671028Open ↗
Showing 3 of 42 on file for this type
▸BISBOROUGH INTAKE FORM19
09/20/2024123917299Open ↗
04/11/2024123917299Open ↗
04/10/2024123917299Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents37
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSupporting Document: Fee Exempt3
01/07/2026141027341Open ↗
05/16/2025124055066Open ↗
Showing 2 of 3 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlot Diagram2
08/31/2026M00811656-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
10/21/2025141027341Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
09/20/2024123917299Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/07/2026141027341Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type