Artifact No. 636
636 WEST 158TH STREET · BIN 1091952
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsUnder Construction1 filing
Floor 4Sprinkler system removal3 filings
Floor 3Sprinkler system removal1p · 6 filings
Floor 2Sprinkler system removal1p · 6 filings
Floor 1Temporary plywood fence installation1p · 7 filings
CellarInterior partition removals1p · 3 filings
Sub-BasementSprinkler system removal3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Artifact510/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Morozov706/30/2026
Morris Adjmi Architects404/10/2026
Shahrish Shuvo Engineering103/30/2026
Madsen Consulting Engineering203/14/2025
Joselow & Associates108/06/2024
Ancora Engineering403/14/2024
Ecc203/07/2024
Ashraf101/30/2024
Bilow Engineering111/30/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YNH Construction NYGeneral Contractor109/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616906/30/2026
Shahrish Shuvo Engineering8524306/30/2026
Vibranalysis Inc., Dba VT6864703/14/2025
Bilow Engineering4095112/14/2021
Building Lifecycle
All (177)Filed (23)Permit Issued (22)Signed Off (4)Violation (7)Inspection (12)Objection (79)Special Inspection (30)
09/21/2026
Objection resolved — Resolved
09/15/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M00987790-I1
09/14/2026
Objection raised — Other
09/03/2026
Permit issued — General Construction
M00628781-I1-GC
07/22/2026
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 17 STORY BUILDING AS SHOWN ON PLANS.
M00628781-S4
07/14/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Shahrish Shuvo
07/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
07/13/2026
Objection resolved — Addressed
07/13/2026
Objection resolved — Addressed
07/13/2026
Objection resolved — Addressed
07/13/2026
Objection resolved — Addressed
07/02/2026
Violation issued (ECB, closed)
Unknown
07/02/2026
Violation issued (ECB, closed)
Unknown
06/30/2026
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 17 STORY BUILDING AS SHOWN ON PLANS.
M00628781-A2
06/30/2026
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 17 STORY BUILDING AS SHOWN ON PLANS.
M00628781-A1
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Shahrish Shuvo
06/30/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/30/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
06/10/2026
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 17 STORY BUILDING AS SHOWN ON PLANS.
M00628781-S3
06/05/2026
Violation issued (ECB, closed)
Unknown
06/05/2026
Violation issued (ECB, closed)
Construction
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/20/2026
Objection resolved — Addressed
05/20/2026
Objection resolved — Addressed
05/20/2026
Objection resolved — Addressed
05/20/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Mechanical
04/22/2026
Objection raised — Mechanical
04/22/2026
Objection raised — Cost
04/22/2026
Objection raised — Mechanical
04/22/2026
Objection raised — Mechanical
04/22/2026
Objection raised — Mechanical
04/22/2026
Objection raised — Mechanical
04/22/2026
Objection raised — Mechanical
04/22/2026
Objection raised — Other
04/10/2026
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 17 STORY BUILDING AS SHOWN ON PLANS.
M00628781-P8
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Masonry
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Vestibules
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedYNH Construction NY09/03/2026
DOB NOWMechanical SystemsSigned-offYNH Construction NY11/06/2025
DOB NOWGeneral ConstructionPermit IssuedYNH Construction NY08/29/2025
DOB NOWConstruction FenceSigned-offAmsterdam Harlem Construction08/06/2025
DOB NOWPlumbingPermit IssuedPrime Piping & Heating07/18/2025
DOB NOWStructuralSigned-offYNH Construction NY06/27/2025
DOB NOWFoundationSigned-offYNH Construction NY06/27/2025
DOB NOWStandpipePermit IssuedAmb Mechanical06/16/2025
DOB NOWStandpipeSigned-offAmb Mechanical06/16/2025
DOB NOWSupport of ExcavationSigned-offYNH Construction NY05/19/2025
DOB NOWConstruction FenceSigned-offAmsterdam Harlem Construction04/07/2025
DOB NOWFoundationSigned-offYNH Construction NY09/11/2024
DOB NOWSupport of ExcavationSigned-offYNH Construction NY09/09/2024
DOB NOWStructuralSigned-offYNH Construction NY08/02/2024
DOB NOWSprinklersSigned-offAccurate Mechanical04/23/2024
DOB NOWSprinklersSigned-offAccurate Mechanical04/19/2024
DOB NOWSprinklersPermit IssuedAccurate Mechanical04/19/2024
DOB NOWSprinklersSigned-offAccurate Mechanical04/19/2024
DOB NOWConstruction FenceSigned-offAlba Services04/03/2024
DOB NOWGeneral ConstructionPermit IssuedAlba Services03/20/2024
DOB NOWGeneral ConstructionSigned-offAlba Services03/19/2024
DOB NOWGeneral ConstructionSigned-offAmsterdam Harlem Construction06/08/2022
1 project · most recent 06/30/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2026Permit IssuedYNH Construction NYHeating and Air Conditioning Systems
Heat / Cool
Toshiba MMY-MUP1441HT9P-UL 162,000 BTU · Vrf Outdoor ×75
MMY-MAP1446FT9P-UL 154,000 BTU · Vrf Outdoor ×5
MMY-MUP0961HT9P-UL 98,000 BTU · Vrf Outdoor ×5
RAV-BP121AT29-UL 14,000 BTU · Vrf Outdoor ×5
3 projects · most recent 06/30/2026
Sprinkler System
FiledStatusContractorScope
06/30/2026Permit IssuedPrime Piping & HeatingSprinkler System
03/14/2024Signed-offAccurate Mechanical—
03/14/2024Signed-offAccurate Mechanical10 heads
1 project · most recent 06/30/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/30/2026Permit IssuedPrime Piping & HeatingStorm, Water/Sanitary
4 projects · most recent 09/02/2026
General Wiring
FiledStatusContractorScope
09/02/2026Permit IssuedDenali Electric—
06/09/2025Permit IssuedS&F Electrical ServiceGeneral Wiring
02/17/2025Permit IssuedS&F Electrical Service1 meters, 1 new_meters
02/22/2024Permit IssuedNash Electric Services—
1 project · most recent 06/30/2026
Concrete
FiledStatusContractorScope
06/30/2026Permit IssuedYNH Construction NYConcrete
1 project · most recent 01/30/2024
Fence
FiledStatusContractorScope
01/30/2024Signed-offAmsterdam Harlem ConstructionFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/08/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/24/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/24/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
07/14/2026Standpipe SystemsSHAHRIAR QUAYYUMspecial
07/14/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/14/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/14/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
07/14/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/14/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
07/14/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
07/14/2026On-Site Private Sewage Disposal Systems InstallationShahrish Shuvospecial
07/14/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
06/30/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/30/2026Standpipe SystemsSHAHRIAR QUAYYUMspecial
06/30/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
06/30/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
06/30/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
06/30/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
06/30/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/30/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
06/30/2026On-Site Private Sewage Disposal Systems InstallationShahrish Shuvospecial
04/09/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
04/09/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
04/09/2026VestibulesSHAHRIAR QUAYYUMenergy_progress
04/09/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
04/09/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
04/09/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
04/09/2026Wall Panels, Curtain Walls, and VeneersSHAHRIAR QUAYYUMspecial
Latest 25 of 126.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026M00996630-I1Request digital key ↗
08/27/2026M00917067-I1Request digital key ↗
08/27/2026M00917041-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications65
▸DOB NOWSpecial Inspector Seal & Signature39
10/07/2026M00628781-S1Open ↗
10/07/2026M00628781-S1Open ↗
10/07/2026M00628781-S1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/26/2026M00628781-P8Open ↗
09/26/2026M00628781-P8Open ↗
09/23/2026M00996630-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026M00987790-I1Open ↗
08/27/2026M00996630-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026M00996630-I1Open ↗