1 Open Violation ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof8p · 2 filings · 9 docs
Floor 6119p · 2 filings · 20 docs
Floor 5120p · 2 filings · 20 docs
Floor 4124p · 3 filings · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 2129p · 4 filings · 20 docs
Floor 1120p · 3 filings · 20 docs
Mezzanine108p · 1 filing · 20 docs
Cellar117p · 2 filings · 20 docs
Sub-Cellar129p · 3 filings · 20 docs
1 job · most recent 12/19/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/19/2024Signed-offTRITON CONSTRUCTION CO.,Air Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM60NAM2-U1 60,000 BTU · Vrf Outdoor ×12
MXZ-SM36NAM2-U1 36,000 BTU · Vrf Outdoor ×2
PUHY-EP96TNU-A1 96,000 BTU · Vrf Outdoor ×2
PUZ-A24NHA7 24,000 BTU · Split System ×2
1 job · most recent 12/19/2024
Sprinkler System
FiledStatusContractorScope
12/19/2024Permit IssuedSTAT FIRE SPRINKLER NYC CSprinkler System
1 job · most recent 12/19/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/19/2024Signed-offDEMAR MECHANICAL INCGas, Storm, Water/Sanitary
8 jobs · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026Permit IssuedBIG ANT ELECTRIC, INCGeneral Wiring
05/16/2025CompleteRX ELECTRIC INC—
01/01/2024CompleteS&F ELECTRICAL SERVICE INGeneral Wiring
02/02/2023CompleteJAM ELECTRICAL CORP—
02/10/2022CompleteAGIR ELEC'L LTD. D/B/A—
02/01/2022CompleteNASH ELECTRIC SERVICES IN—
12/13/2021CompleteNASH ELECTRIC SERVICES IN—
04/19/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
1 job · most recent 12/19/2024
Steel Concrete Masonry
FiledStatusContractorScope
12/19/2024Permit IssuedSTAT FIRE SPRINKLER NYC CSteel, Concrete, Masonry
1 job · most recent 07/08/2022
Sidewalk Shed
FiledStatusContractorScope
07/08/2022Permit IssuedS&E BRIDGE & SCAFFOLD LLCSidewalk Shed
Building Lifecycle
All (267)Filed (44)Permit Issued (70)Signed Off (15)Violation (51)Inspection (15)Objection (42)Special Inspection (30)
05/07/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/18/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00644968-I1
03/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00806212-I1
03/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY MONORAIL SYSTEM AS PER DRAWINGS. MONORAIL SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M08031725-I1
03/18/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00771541-I1
03/07/2025
Signed off — Alteration
M01068342-I1
03/05/2025
Signed off — Alteration
Supported scaffold filing as per plans filed herewith.
M01059004-I1
02/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Final
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Chimneys and vents
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Fireplaces
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
02/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
02/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2025
Signed off — Alteration CO
Standpipe application in conjunction with the ALT-CO M00665541-I1
M00665541-S8
02/07/2025
Objection resolved — Addressed
02/06/2025
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
02/06/2025
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
02/03/2025
Objection resolved — Addressed
01/31/2025
Objection raised — Scope
01/31/2025
Objection resolved — Addressed
01/28/2025
Signed off — Alteration
GENERAL CONSTRUCTION FILED HEREWITH FOR ALTERATION OF EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M00600344-I1
01/22/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2024
Objection raised — Scope
12/30/2024
Objection raised — Scope
12/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
12/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
12/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/30/2024
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
12/30/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
12/30/2024
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
12/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
12/30/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
12/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/20/2024
Objection resolved — Addressed
12/19/2024
Filed — Alteration CO
Standpipe application in conjunction with the ALT-CO M00665541-I1
M00665541-A3
12/11/2024
Filed — Alteration CO
Standpipe application in conjunction with the ALT-CO M00665541-I1
M00665541-A1
12/11/2024
Filed — Alteration CO
Standpipe application in conjunction with the ALT-CO M00665541-I1
M00665541-A2
Latest 60 of 267 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALBA SERVICES407/08/2026
TRITON CONSTRUCTION CO.,103/22/2026
FOLLETT TIME DEVICES INC503/22/2026
62-64 READE STREET LLC403/22/2026
GRACIE CORP103/22/2026
SEA REALTY503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/31/2021$5.1M—FOLLETT TIME DEVICES, INC. → 62-64 READE STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC1312/19/2024
ODA-ARCHITECTURE, P.C.610/24/2024
GEORGE J. XERAKIAS, PE207/18/2024
G. BLINN CONSULTING, LLC2006/20/2024
ALBER CAMARGO105/31/2024
KIEFER & SCHUSTER ENGINEERING PLLC206/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE4003/21/2026
CODE4203/21/2026
CH BUILDING CONSULTANTS403/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E BRIDGE & SCAFFOLD LLC.General Contractor6507/08/2026
TRITON CONSTRUCTION CO.,General Contractor1307/08/2026
WCD SERVICES CORPGeneral Contractor1007/08/2026
STAT FIRE SPRINKLER NYC CFire Protection707/08/2026
DEMAR MECHANICAL INCPlumbing307/08/2026
KNS BUILDING REST. INCGeneral Contractor107/08/2026
ALBA SERVICES INCGeneral Contractor107/08/2026
S&F ELECTRICAL SERVICE INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431712/19/2024
ANCORA ENGINEERING, PLLC6818108/29/2022
SPECIAL TESTING & CONSULT1688110/01/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedSTAT FIRE SPRINKLER NYC C10/28/2024
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2024
DOB NOWSidewalk ShedPermit IssuedS&E BRIDGE & SCAFFOLD LLC09/27/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWConstruction FencePermit IssuedS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC08/26/2024
DOB NOWMechanical SystemsSigned-offTRITON CONSTRUCTION CO.,08/12/2024
DOB NOWSprinklersPermit IssuedSTAT FIRE SPRINKLER NYC C07/29/2024
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C07/29/2024
DOB NOWSupported ScaffoldSigned-offKNS BUILDING REST06/24/2024
DOB NOWSupported ScaffoldSigned-offALBA SERVICES INC05/31/2024
DOB NOWSprinklersPermit IssuedSTAT FIRE SPRINKLER NYC C05/21/2024
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C05/21/2024
DOB NOWStructuralSigned-offTRITON CONSTRUCTION CO.,04/03/2024
DOB NOWStructuralSigned-offTRITON CONSTRUCTION CO.,04/03/2024
DOB NOWGeneral ConstructionPermit IssuedTRITON CONSTRUCTION CO.,03/22/2024
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC12/05/2023
DOB NOWSidewalk ShedPermit IssuedS&E BRIDGE & SCAFFOLD LLC12/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC12/05/2023
DOB NOWGeneral ConstructionSigned-offS&E BRIDGE & SCAFFOLD LLC12/04/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/01/2023
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC12/01/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC12/01/2023
DOB NOWConstruction FencePermit IssuedS&E BRIDGE & SCAFFOLD LLC12/01/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/01/2023
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWGeneral ConstructionSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWConstruction FencePermit IssuedS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWSidewalk ShedPermit IssuedS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2023
+ 10 more permits on file
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
06/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/07/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/19/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/26/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
02/18/2025Mechanical SystemsJOHN MCMONAGLEspecial
02/18/2025Post-installed AnchorsJOHN MCMONAGLEspecial
02/18/2025Chimneys and ventsJOHN MCMONAGLEspecial
02/18/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/18/2025FinalJOHN MCMONAGLEprogress
02/18/2025Maintenance informationJOHN MCMONAGLEenergy_progress
02/18/2025FireplacesJOHN MCMONAGLEenergy_progress
02/18/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
02/18/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
02/18/2025Shutoff dampersJOHN MCMONAGLEenergy_progress
02/18/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
02/18/2025Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
02/06/2025Fenestration areasJOHN MCMONAGLEenergy_progress
02/06/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
02/06/2025Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
02/06/2025Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
02/06/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/06/2025Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
02/06/2025Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
02/06/2025Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
02/06/2025Fenestration air leakageJOHN MCMONAGLEenergy_progress
02/06/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
12/30/2024Maintenance informationJOHN MCMONAGLEenergy_progress
12/30/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/30/2024Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
Latest 25 of 88.
▾Documents — 237 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch44
09/03/2026M00600355-I1Request digital key ↗
09/03/2026M00600344-I1Request digital key ↗
09/03/2026M00644968-P1Request digital key ↗
Showing 3 of 44 on file for this type
▸Applications & Permits30
▸DOB NOWLPC Approval/Permit19
09/03/2026M00600344-I1Open ↗
08/13/2026M00665541-S2Open ↗
08/13/2026M00665541-S6Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
12/05/2024103542828Open ↗
08/26/2024124041081Open ↗
02/17/2022123914728Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
01/16/2014121787129Open ↗
01/16/2014121787129Open ↗
12/09/2013121787129Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026M00665541-I1Open ↗
08/13/2026M00665541-P2Open ↗
08/13/2026M00665541-P6Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
09/12/2024124041081Open ↗
08/25/2022123914728Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026M00665541-P6Open ↗
08/13/2026M00665541-I1Open ↗
▸Seals & Professional Certifications85
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/03/2026M00600355-I1Open ↗
09/03/2026M00600344-I1Open ↗
09/03/2026M00644968-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/02/2026M00665541-P1Open ↗
09/02/2026M00665541-P1Open ↗
09/01/2026M00665541-P9Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026M00665541-P1Open ↗
09/01/2026M00665541-P9Open ↗
09/01/2026M00665541-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/09/2014121787129Open ↗
11/04/2013121787129Open ↗
11/04/2013121787129Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE APPLICATION-PERMIT2
06/05/2014121787129Open ↗
03/31/2014121787129Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
04/10/2014121787129Open ↗
02/05/2014121787129Open ↗
▸BISSCHEDULE B - PLUMBING1
10/04/2013121787129Open ↗
▸BISEQUIPMENT USE PERMITS1
03/31/2014121787129Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026M00665541-P2Open ↗
08/13/2026M00665541-P6Open ↗
08/13/2026M00665541-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/25/2026M00665541-P5Open ↗
08/25/2026M00665541-A3Open ↗
08/25/2026M00665541-A2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00600344-I1Open ↗
08/25/2026M00665541-S7Open ↗
08/25/2026M00665541-S6Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs14
▸DOB NOWDEP Variance (V5) letter9
09/03/2026M00600355-I1Open ↗
09/03/2026M00600344-I1Open ↗
08/13/2026M00665541-S8Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL4
08/25/2022123914728Open ↗
05/09/2014121787129Open ↗
10/28/2013121787129Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/09/2014121787129Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/04/2013121787129Open ↗
10/04/2013121787129Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION8
09/18/2024124041081Open ↗
09/18/2024124041081Open ↗
09/18/2024124041081Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET4
08/26/2024124041081Open ↗
02/17/2022123914728Open ↗
10/04/2013121787129Open ↗
Showing 3 of 4 on file for this type
▸Other Documents17
▸DOB NOWProperty Ownership Certification4
08/25/2026M00665541-P6Open ↗
08/25/2026M00665541-P2Open ↗
08/15/2026M00665541-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026M00665541-P2Open ↗
08/13/2026M00665541-P6Open ↗
08/13/2026M00665541-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00665541-P6Open ↗
08/13/2026M00665541-I1Open ↗
08/13/2026M00665541-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026M00665541-P2Open ↗
08/13/2026M00665541-P6Open ↗
08/13/2026M00665541-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/04/2013121787129Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/27/2024124041081Open ↗
▸BISPLOT DIAGRAM1
08/25/2022123914728Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00665541-I1Open ↗