💬 Discuss this project
1940Year Built
21Stories
O4Building Class
C5-3Zoning
277,684 sfGross Floor Area
27Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 640 Fifth Avenue Owner · 16,673 sf lot · 16.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsVornado Realty Trust1 filing
RoofProspectRidge1p · 1 filing · 13 docs
Floor 21KPS Capital Partners14p · 7 filings · 20 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16Vornado Realty TrustUnder Construction6p · 4 filings · 15 docs
Floor 15M- Klein8p · 8 filings · 20 docs
Floor 14M- Klein3p · 1 filing · 7 docs
Floor 13
Floor 12M- Klein2p · 1 filing · 7 docs
Floor 11
Floor 10
Floor 9Vornado Realty Trust1 filing · 3 docs
Floor 8ProspectRidge13p · 9 filings · 20 docs
Floor 7Abbott Capital16p · 8 filings · 20 docs
Floor 6Vornado Realty TrustUnder Construction7p · 9 filings · 20 docs
Floor 5Fidelity Investments2p · 2 filings · 9 docs
Floor 4Advisor Group10p · 4 filings · 20 docs
Floor 3
Floor 2
Floor 1Vornado Realty Trust2p · 2 filings · 5 docs
Site & exteriorTemporary sidewalk shed installation1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vornado Realty Trust54809/13/2026
The Shorestein Co3003/21/2026
Metlife403/21/2026
Metropolitan Life Inc Co203/21/2026
640 Fifth Avenue Owner103/22/2026
E.C. Provini Co103/22/2026
Vorando Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen603/21/2026
Archetype Consultants10803/21/2026
Eurocelt Expediting403/21/2026
AE Design Solution203/21/2026
Conapac Services Dba103/21/2026
Conapac Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W5 GroupGeneral Contractor1707/08/2026
Clune Construction CoGeneral Contractor1507/08/2026
John Gallin & SonGeneral Contractor607/22/2026
Gannon ContractingGeneral Contractor607/08/2026
Sirina Fire ProtectionFire Protection507/08/2026
Platform SolutionsScaffold507/08/2026
LhotseScaffold307/08/2026
James E FitzgeraldGeneral Contractor307/08/2026
Tri-Star ConstructionGeneral Contractor307/08/2026
S.B.A. PlumbingPlumbing207/08/2026
Polo Electric Corp D/B/AElectrical203/22/2026
Everest ScaffoldingScaffold203/21/2026
Accurate Mechanical IndstrsPlumbing207/22/2026
Allstate SprinklerFire Protection207/22/2026
Enobrac PlumbingPlumbing207/08/2026
Enobrac PlumbingFire Protection207/08/2026
Par Plumbing Co., Inc.oFire Protection203/21/2026
Robert B. SamuelsElectrical103/22/2026
Par Fire ProtectionFire Protection107/08/2026
Arco Plumbing and HeatingPlumbing107/08/2026
Armon MechanicalPlumbing107/08/2026
Adco ElectricalElectrical103/21/2026
Matros Automated ElectricalElectrical103/22/2026
Armon MechanicalFire Protection107/08/2026
Par Plumbing CoPlumbing107/08/2026
Corp Electrical TechnologiesElectrical103/22/2026
Star-Delta ElectricElectrical103/21/2026
Accurate MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering81742010/20/2026
Alan D Marcus, PE17611908/25/2025
Becker Engineering6331109/19/2022
Asda Architecture + Desig2015103/22/2022
Codegreen510408/09/2021
Building Lifecycle
All (300)Filed (71)Permit Issued (58)Signed Off (45)Facade (FISP) (6)Violation (46)Inspection (32)Objection (12)Special Inspection (30)
10/20/2026
Filed — Alteration
Sprinkler work on the 6th floor (prebuild) as indicated on drawings.
M01295342-P1
09/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/10/2026
Objection raised — Scope
08/10/2026
Objection raised — Scope
08/03/2026
Filed — Alteration
Plumbing work on the 6th floor (prebuild) as indicated on drawings.
M01295337-P1
08/03/2026
Filed — Alteration
Mechanical work on the 6th floor (prebuild) as indicated on drawings
M01294855-P2
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2026
Permit issued — Mechanical Systems
M01423039-I1-MS
07/20/2026
Permit issued — General Construction
M01423031-I1-GC
07/20/2026
Permit issued — Plumbing
M01423047-I1-PL
07/20/2026
Permit issued — Sprinklers
M01423059-I1-EW-SP
07/02/2026
Filed — Alteration
Sprinkler work/temporary sprinkler loop on the 16th floor as indicated on drawings.
M01423059-I1
07/02/2026
Filed — Alteration
Mechanical work on the 16th floor as indicated on drawings.
M01423039-I1
07/02/2026
Filed — Alteration
General construction on the 16th floor (P&D/whitebox) as indicated on drawings.
M01423031-I1
07/02/2026
Filed — Alteration
Plumbing work on the 16th floor as indicated on drawings
M01423047-I1
06/26/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
06/26/2026
Special inspection requirement — Final
Ryan Hansen
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/22/2026
Special inspection requirement — Metering
Ryan Hansen
05/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
05/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
Ryan Hansen
05/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
05/22/2026
Special inspection requirement — Ventilation and air distribution system
Ryan Hansen
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
05/22/2026
Special inspection requirement — Lighting controls
Ryan Hansen
05/22/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
05/22/2026
Special inspection requirement — Mechanical Systems
Ryan Hansen
05/22/2026
Special inspection requirement — Maintenance information
Ryan Hansen
05/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
05/22/2026
Special inspection requirement — Interior lighting power
Ryan Hansen
05/22/2026
Special inspection requirement — Final
Ryan Hansen
05/08/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/07/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
05/07/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
05/07/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
03/17/2026
Signed off — Alteration
Construction work on the 1st floor lobby as indicated on drawings.
M01272050-I1
01/14/2026
Permit issued — Sprinklers
M01295342-I1-EW-SP
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/28/2025
Permit issued — Plumbing
M01295337-I1-PL
11/24/2025
Permit issued — Mechanical Systems
M01294855-I1-MS
11/24/2025
Permit issued — General Construction
M01294839-I1-GC
10/28/2025
Permit issued — General Construction
M01272050-I1-GC
10/16/2025
Filed — Alteration
M01294839-I1
10/16/2025
Filed — Alteration
Mechanical work on the 6th floor (prebuild) as indicated on drawings
M01294855-I1
10/16/2025
Filed — Alteration
Plumbing work on the 6th floor (prebuild) as indicated on drawings.
M01295337-I1
10/16/2025
Filed — Alteration
Sprinkler work on the 6th floor (prebuild) as indicated on drawings.
M01295342-I1
10/16/2025
Special inspection requirement — Post-installed Anchors
Ryan Hansen
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
10/15/2025
Special inspection requirement — Ventilation and air distribution system
Ryan Hansen
10/15/2025
Special inspection requirement — Maintenance information
Ryan Hansen
10/15/2025
Special inspection requirement — Metering
Ryan Hansen
10/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
Ryan Hansen
10/15/2025
Special inspection requirement — Post-installed Anchors
Ryan Hansen
09/30/2025
Special inspection requirement — Interior lighting power
Ryan Hansen
09/30/2025
Special inspection requirement — Lighting controls
Ryan Hansen
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJohn Gallin & Son07/20/2026
DOB NOWGeneral ConstructionPermit IssuedJohn Gallin & Son07/20/2026
DOB NOWPlumbingPermit IssuedAccurate Mechanical Indstrs07/20/2026
DOB NOWSprinklersPermit IssuedAllstate Sprinkler07/20/2026
DOB NOWSprinklersPermit IssuedAllstate Sprinkler01/14/2026
DOB NOWPlumbingPermit IssuedAccurate Mechanical Indstrs11/28/2025
DOB NOWMechanical SystemsPermit IssuedJohn Gallin Son11/24/2025
DOB NOWGeneral ConstructionPermit IssuedJohn Gallin Son11/24/2025
DOB NOWGeneral ConstructionSigned-offJohn Gallin Son10/28/2025
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald08/28/2025
DOB NOWGeneral ConstructionSigned-offJames E Fitzgerald08/15/2025
DOB NOWGeneral ConstructionSigned-offJohn Gallin Son01/25/2024
DOB NOWPlumbingSigned-offArco Plumbing and Heating11/30/2023
DOB NOWMechanical SystemsSigned-offTri-Star Construction11/21/2023
DOB NOWSprinklersSigned-offAccurate Mechanical11/16/2023
DOB NOWGeneral ConstructionSigned-offTri-Star Construction11/08/2023
DOB NOWMechanical SystemsSigned-offClune Construction Co09/19/2022
DOB NOWPlumbingSigned-offArmon Mechanical09/14/2022
DOB NOWSprinklersSigned-offArmon Mechanical09/13/2022
DOB NOWGeneral ConstructionSigned-offClune Construction Co09/06/2022
DOB NOWSprinklersSigned-offEnobrac Plumbing12/06/2021
DOB NOWPlumbingSigned-offEnobrac Plumbing12/02/2021
DOB NOWGeneral ConstructionSigned-offClune Construction Co11/30/2021
DOB NOWMechanical SystemsSigned-offClune Construction Co11/30/2021
DOB NOWGeneral ConstructionSigned-offClune Construction Co11/08/2021
DOB NOWSprinklersSigned-offEnobrac Plumbing08/17/2021
DOB NOWPlumbingSigned-offEnobrac Plumbing08/17/2021
DOB NOWGeneral ConstructionSigned-offClune Construction Co08/13/2021
DOB NOWMechanical SystemsSigned-offClune Construction Co08/13/2021
DOB NOWPlumbingSigned-offS.B.A. Plumbing08/11/2021
DOB NOWPlumbingSigned-offS.B.A. Plumbing08/11/2021
DOB NOWSprinklersSigned-offSirina Fire Protection07/19/2021
DOB NOWSprinklersSigned-offSirina Fire Protection07/16/2021
DOB NOWSprinklersSigned-offSirina Fire Protection07/16/2021
DOB NOWSprinklersSigned-offSirina Fire Protection07/16/2021
DOB NOWSprinklersSigned-offSirina Fire Protection07/16/2021
DOB NOWMechanical SystemsSigned-offW5 Group06/09/2021
DOB NOWMechanical SystemsSigned-offW5 Group06/09/2021
DOB NOWGeneral ConstructionSigned-offW5 Group06/09/2021
DOB NOWMechanical SystemsSigned-offW5 Group06/09/2021
+ 60 more permits on file
2 projects · most recent 10/20/2026
FiledStatusContractorScope
10/20/2026Permit IssuedAllstate Sprinkler—
07/02/2026Permit IssuedAllstate Sprinkler—
2 projects · most recent 08/03/2026
Water/Sanitary
FiledStatusContractorScope
08/03/2026Permit IssuedAccurate Mechanical IndstrsWater/Sanitary
07/02/2026Permit IssuedAccurate Mechanical IndstrsWater/Sanitary
25 projects · most recent 12/02/2025
General Wiring Lighting
FiledStatusContractorScope
12/02/2025Permit IssuedMRD Electrical ServicesGeneral Wiring
11/07/2025CompleteOn Point Electric—
04/11/2024CompleteMatros Automated ElectricalGeneral Wiring
01/17/2024CompleteAcm ElectricGeneral Wiring
11/15/2023CompleteRX ElectricGeneral Wiring
11/15/2023CompleteRX Electric—
04/14/2023CompleteC.falco Eletl Cont—
01/17/2023CompleteLive Wire Electric 1General Wiring
03/14/2022CompleteAllstate Electrical ContGeneral Wiring
12/03/2021CompleteLive Wire Electric 1General Wiring
08/20/2021CompleteLive Wire Electric 1General Wiring
06/09/2021CompleteSRM Electrical ServicesGeneral Wiring
02/18/2021CompletePolo Electric Corp D/B/AGeneral Wiring
03/09/2020CompleteCorp Electrical TechnologiesGeneral Wiring, Lighting
01/03/2020CompleteRobert B. Samuels—
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
09/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/21/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/13/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/13/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 143
DateRequirementInspectorRole
06/26/2026Sprinkler SystemsRyan Hansenspecial
06/26/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/26/2026FinalRyan Hansenprogress
05/22/2026Maintenance informationRyan Hansenenergy_progress
05/22/2026HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
05/22/2026Interior lighting powerRyan Hansenenergy_progress
05/22/2026Lighting controlsRyan Hansenenergy_progress
05/22/2026Duct leakage testing, insulation and designRyan Hansenenergy_progress
05/22/2026Ventilation and air distribution systemRyan Hansenenergy_progress
05/22/2026HVAC-R and service water heating system controlsRyan Hansenenergy_progress
05/22/2026MeteringRyan Hansenenergy_progress
05/22/2026HVAC-R and service water heating equipmentRyan Hansenenergy_progress
05/22/2026FinalRyan Hansenprogress
05/22/2026Energy Code Compliance InspectionsRyan Hansenprogress
05/22/2026Mechanical SystemsRyan Hansenspecial
05/22/2026Post-installed AnchorsRyan Hansenspecial
05/07/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
05/07/2026Post-installed AnchorsRyan Hansenspecial
05/07/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
05/07/2026Sprinkler SystemsRyan Hansenspecial
05/07/2026Post-installed AnchorsRyan Hansenspecial
10/16/2025Post-installed AnchorsRyan Hansenspecial
10/16/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
10/15/2025Maintenance informationRyan Hansenenergy_progress
10/15/2025Ventilation and air distribution systemRyan Hansenenergy_progress
Latest 25 of 143.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fidelity InvestmentsBank / Financial branchFloor 5
Project M01235637 Alteration · LOC Issued · 07/01/2025
Project M01235627 Alteration · LOC Issued · 06/25/2025
M- KleinOfficeFloors 12, 14, 15
Project M00955540 Alteration · LOC Issued · 01/22/2024
Project M00904381 Alteration · LOC Issued · 11/17/2023
Project M00904387 Alteration · LOC Issued · 11/13/2023
Project M00904418 Alteration · LOC Issued · 11/13/2023
Project M00904350 Alteration · LOC Issued · 10/27/2023
KPS Capital PartnersOfficeFloor 21
Project M00778494 Alteration · LOC Issued · 09/15/2022
Project M00778469 Alteration · LOC Issued · 09/02/2022
Project M00778537 Alteration · LOC Issued · 09/02/2022
Project M00778547 Alteration · LOC Issued · 09/02/2022
ProspectRidgeOfficeFloor 8
Project M00605458 Alteration · LOC Issued · 11/29/2021
Project M00605503 Alteration · LOC Issued · 11/29/2021
Project M00605509 Alteration · LOC Issued · 11/29/2021
Project M00605445 Alteration · LOC Issued · 11/24/2021
Abbott CapitalOfficeFloor 7
Project M00543822 Alteration · LOC Issued · 08/10/2021
Project M00543839 Alteration · LOC Issued · 08/10/2021
Project M00543853 Alteration · LOC Issued · 08/10/2021
Project M00543860 Alteration · LOC Issued · 08/10/2021
Advisor GroupOfficeFloor 4
Project M00461059 Alteration · LOC Issued · 02/11/2021
Project M00460942 Alteration · LOC Issued · 02/08/2021
Project M00460966 Alteration · LOC Issued · 02/08/2021
Project M00460927 Alteration · LOC Issued · 02/05/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,007 on file (BIS + DOB NOW)
▸Plans & Drawings72
▸DOB NOWPlans/Sketch62
09/03/2026M00481179-I1Request digital key ↗
09/03/2026M00481036-I1Request digital key ↗
09/03/2026M00481100-I1Request digital key ↗
Showing 3 of 62 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00460942-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00307983-I1Request digital key ↗
09/05/2026M00312183-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00194240-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00460966-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00460927-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/05/2026M00141751-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00461059-I1Request digital key ↗
▸Applications & Permits513
▸BISPLAN / WORK APPROVAL APPLICATION307
12/19/2024123103514Open ↗
07/12/2024123068321Open ↗
06/05/2024123057191Open ↗
Showing 3 of 307 on file for this type
▸BISWORK PERMIT APPLICATION200
05/10/2021123742593Open ↗
08/03/2020140886968Open ↗
03/13/2020140886968Open ↗
Showing 3 of 200 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1136
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Seals & Professional Certifications797
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION414
03/06/2020123742593Open ↗
08/05/2019123596484Open ↗
Showing 2 of 414 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST98
03/06/2020123742593Open ↗
Showing 1 of 98 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT81
03/06/2020123742593Open ↗
03/03/2020140886968Open ↗
Showing 2 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature72
09/05/2026M00194240-P1Open ↗
09/05/2026M00194240-I1Open ↗
09/04/2026M00460927-I1Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWProgress Inspector Seal & Signature47
09/07/2026M00543822-I1Open ↗
09/07/2026M00543822-I1Open ↗
09/07/2026M00543822-I1Open ↗
Showing 3 of 47 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/25/2026M01423059-I1Open ↗
09/07/2026M00543822-I1Open ↗
09/02/2026M00481059-I1Open ↗
Showing 3 of 38 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/03/2020140886968Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/03/2020140886968Open ↗
Showing 1 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment288
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE76
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 76 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISSELF-CERT PLUMBING NOTICE44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISSCHEDULE B - PLUMBING37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISEQUIPMENT USE PERMITS36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA33
11/22/2023123050991Open ↗
02/09/2022123828082Open ↗
08/26/2019123589027Open ↗
Showing 3 of 33 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8510
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection13
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos209
▸BISASBESTOS: CERTIFICATION (DEP ACP5)93
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 93 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report59
09/04/2026M00460927-I1Open ↗
09/04/2026M00460966-I1Open ↗
09/04/2026M00461059-I1Open ↗
Showing 3 of 59 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance145
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS85
02/07/2020123716425Open ↗
Showing 1 of 85 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS27
06/06/2024123292659Open ↗
06/06/2024123292659Open ↗
06/06/2024123292659Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
06/06/2024123292659Open ↗
06/06/2024123292659Open ↗
06/06/2024123292659Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/04/2026M00460927-I1Open ↗
Showing 1 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
07/05/2024123057191Open ↗
05/13/2024122683015Open ↗
07/21/2022123510619Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* DUCT LEAKAGE TESTING2
07/05/2024123057191Open ↗
07/21/2022123510619Open ↗
▸BISLIGHTING CONTROLS2
07/05/2024123057191Open ↗
07/21/2022123510619Open ↗
▸BISINTERIOR LIGHTING POWER2
07/05/2024123057191Open ↗
07/21/2022123510619Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* HVAC INSULATION AND SEALING2
07/05/2024123057191Open ↗
07/21/2022123510619Open ↗
▸Inspections & Test Reports54
▸BISTECHNICAL REPORT: RESPONSIBILITY40
12/02/2024123103514Open ↗
10/11/2024123057191Open ↗
10/11/2024123057191Open ↗
Showing 3 of 40 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
07/15/2024123068321Open ↗
07/05/2024123057191Open ↗
07/21/2022123510619Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL SYSTEMS2
07/05/2024123057191Open ↗
07/21/2022123510619Open ↗
▸Approvals, Objections & Sign-offs251
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST147
12/19/2024123103514Open ↗
10/15/2024123057191Open ↗
07/15/2024123068321Open ↗
Showing 3 of 147 on file for this type
▸BISADMINISTRATIVE OBJECTIONS46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION36
05/13/2024122683015Open ↗
10/24/2022123598758Open ↗
Showing 2 of 36 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFINAL5
12/02/2024123103514Open ↗
07/05/2024123057191Open ↗
05/13/2024122683015Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership293
▸BISCOST AFFIDAVIT284
12/02/2024123103514Open ↗
10/11/2024123057191Open ↗
10/11/2024123057191Open ↗
Showing 3 of 284 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
07/15/2024123068321Open ↗
07/05/2024123057191Open ↗
05/13/2024122683015Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms313
▸BISEFILING COVER SHEET165
03/06/2020123742593Open ↗
Showing 1 of 165 on file for this type
▸BISADDITIONAL INFORMATION93
06/29/2020123742593Open ↗
12/11/2019123716425Open ↗
08/22/2019123510619Open ↗
Showing 3 of 93 on file for this type
▸BISBOROUGH INTAKE FORM50
08/03/2020140886968Open ↗
03/27/2020121945976Open ↗
03/25/2020121945976Open ↗
Showing 3 of 50 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/03/2020140886968Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type