| Owner | Filings | Most Recent |
|---|---|---|
| SJP TS | 1,042 | 10/13/2026 |
| SJP Properties | 110 | 07/08/2026 |
| Milstein Brothers 42nd St | 28 | 03/21/2026 |
| Bluestone Lane | 5 | 07/08/2026 |
| 42nd Street Development | 4 | 03/21/2026 |
| Moore Capital | 1 | 03/21/2026 |
| Nycedc | 1 | 03/21/2026 |
| NYC Economic Development | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Robert Derector Associates | 29 | 08/28/2026 |
| TYLN | 1 | 08/28/2026 |
| Ted Moudis Associates | 2 | 08/27/2026 |
| Skidmore Owings and Merrill | 2 | 08/27/2026 |
| AMA Consulting Engineers | 22 | 03/17/2026 |
| Tmalihan-Hagger Architect NYC | 2 | 12/31/2025 |
| SSM Design LLP D/B/A Spector Group | 1 | 03/31/2025 |
| Thornton Tomasetti | 3 | 03/06/2025 |
| Vocon | 2 | 01/22/2025 |
| HLW International | 1 | 10/25/2024 |
| French & Parrello Associates | 2 | 03/21/2024 |
| Emad Bouless | 1 | 01/17/2024 |
| Murdoch Engineering | 1 | 01/12/2024 |
| HLW International | 1 | 02/03/2023 |
| McLaren Engineering Group | 4 | 11/16/2022 |
| Dipcd | 1 | 07/06/2022 |
| Diaz Architects Inc., PA | 1 | 07/05/2022 |
| TPG Architecture | 2 | 04/04/2022 |
| Brand Access Solutions | 2 | 03/17/2022 |
| Gensler | 1 | 10/15/2021 |
| Perkins and Will | 1 | 05/11/2021 |
| Norman C. Lok, PE | 2 | 06/07/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Gillman Consulting | 110 | 03/21/2026 |
| Skyline Access | 1 | 03/21/2026 |
| Milrose Consultants | 4 | 03/21/2026 |
| Project Expediters Consulting Co | 6 | 03/21/2026 |
| Louis Striar | 4 | 03/21/2026 |
| DI Dio Architecture | 2 | 03/21/2026 |
| Kazam Consultants | 2 | 03/21/2026 |
| A1 Expediting Service | 4 | 03/21/2026 |
| Building Brothers | 8 | 03/21/2026 |
| RPO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SJP Properties Company | General Contractor | 40 | 09/18/2026 |
| JT Magen & Company | General Contractor | 15 | 09/26/2026 |
| Par Plumbing Co | Plumbing | 10 | 09/03/2026 |
| Par Fire Protection | Fire Protection | 9 | 10/01/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 8 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 6 | 09/03/2026 |
| Structure Tone | General Contractor | 5 | 07/08/2026 |
| Safway Atlantic | Scaffold | 5 | 07/08/2026 |
| Preferred Mechanical | Plumbing | 4 | 09/26/2026 |
| Clune Construction Co | General Contractor | 3 | 07/08/2026 |
| A.M.A. Holdings | Sign hanger | 3 | 07/08/2026 |
| Western Waterproofing Company | specialty_contractor | 3 | 07/08/2026 |
| A.M.A. Holdings | General Contractor | 2 | 03/21/2026 |
| Interboro Sign & Electrical Maintenance | Sign hanger | 2 | 07/08/2026 |
| Star Electrical Contractors | Electrical | 2 | 03/21/2026 |
| Lab Plumbing & Heating Co | Plumbing | 2 | 07/08/2026 |
| Lawrence J. Levine | Fire Protection | 2 | 03/21/2026 |
| Americon Construction | General Contractor | 2 | 03/21/2026 |
| Jam Electrical | Electrical | 2 | 03/21/2026 |
| Soh Par Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Atlas-Acon Electric Service | Electrical | 1 | 03/21/2026 |
| Atlas-Acon Electric Service | Electrical | 1 | 03/22/2026 |
| Montana Electrical Decorating | Electrical | 1 | 03/21/2026 |
| Five Borough Electric | Electrical | 1 | 03/22/2026 |
| Erg Electric Co | Electrical | 1 | 03/21/2026 |
| Universal Electric Sign | Electrical | 1 | 03/21/2026 |
| P.E. Stone | Electrical | 1 | 03/22/2026 |
| Dal Electrical | Electrical | 1 | 03/21/2026 |
| Ainsworth | General Contractor | 1 | 07/08/2026 |
| Variant Services | General Contractor | 1 | 07/08/2026 |
| National Maintenance | Sign hanger | 1 | 07/08/2026 |
| M & S Buildings Services | Fire Protection | 1 | 07/08/2026 |
| A.M.A. Holdings Inc.d/B/A | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Socotec Engineering | 4983 | 22 | 08/28/2026 |
| AK Engineering | 678 | 4 | 08/27/2026 |
| Milrose Consultants | 2003 | 2 | 01/22/2025 |
| Skyline Engineering | 267 | 1 | 07/31/2024 |
| DNA Controlled Inspection | 554 | 17 | 06/04/2024 |
| Joseph Martines PE | 1428 | 2 | 03/21/2024 |
| M.G. McLaren Engineering | 2999 | 1 | 11/16/2022 |
| Sag Engineering & Consulting | 608 | 1 | 07/06/2022 |
| CNS Inspection Services | 7566 | 3 | 10/15/2021 |
| MEP Inspections | 1102 | 1 | 02/25/2020 |
| Catalpa Special Inspectio | 2004 | 1 | 02/25/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/25/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/25/2026 |
| DOB NOW | Plumbing | Permit Issued | Preferred Mechanical | 09/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | Par Fire Protection | 09/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SJP Properties Company | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | SJP Properties Company | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 09/02/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/01/2026 |
| DOB NOW | General Construction | Permit Issued | SJP Properties Company | 05/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SJP Properties Company | 04/29/2026 |
| DOB NOW | General Construction | Permit Issued | SJP Properties Company | 04/28/2026 |
| DOB NOW | Structural | Permit Issued | SJP Properties Company | 04/28/2026 |
| DOB NOW | Standpipe | Permit Issued | Abco-Peerless Sprinkler | 02/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 02/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | Soh Par Sprinkler | 02/20/2026 |
| DOB NOW | Plumbing | Permit Issued | Preferred Mechanical | 02/19/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 02/17/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 02/05/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 02/05/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SJP Properties Company | 09/03/2025 |
| DOB NOW | Plumbing | Signed-off | Par Plumbing Co | 08/27/2025 |
| DOB NOW | General Construction | Signed-off | SJP Properties Company | 08/26/2025 |
| DOB NOW | Sprinklers | Signed-off | Sirina Fire Protection | 04/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SJP Properties Company | 04/15/2025 |
| DOB NOW | General Construction | Permit Issued | SJP Properties Company | 04/14/2025 |
| DOB NOW | Structural | Permit Issued | SJP Properties Company | 04/14/2025 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 03/19/2025 |
| DOB NOW | Standpipe | Permit Issued | Abco-Peerless Sprinkler | 03/19/2025 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 03/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Clune Construction Co | 01/30/2025 |
| DOB NOW | General Construction | Signed-off | Clune Construction Co | 01/28/2025 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 12/09/2024 |
| DOB NOW | Structural | Signed-off | SJP Properties Company | 12/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SJP Properties Company | 12/09/2024 |
| DOB NOW | General Construction | Signed-off | SJP Properties Company | 12/09/2024 |
| DOB NOW | Plumbing | Signed-off | Preferred Mechanical | 10/30/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Ainsworth | 08/16/2024 |
| DOB NOW | Sprinklers | Signed-off | M & S Buildings Services | 02/05/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/27/2026 | Permit Issued | JT Magen & Company | Air Conditioning Systems, Ventilation Systems | Cooling |
| 03/17/2026 | Permit Issued | SJP Properties Company | Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | Sirina Fire Protection | — |
| 08/27/2026 | Permit Issued | Par Fire Protection | 235 heads |
| 03/17/2026 | Permit Issued | Abco-Peerless Sprinkler | 6 outlets |
| 04/24/2025 | Signed-off | Sirina Fire Protection | 27 heads |
| 10/28/2024 | Signed-off | Abco-Peerless Sprinkler | 173 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | Par Plumbing Co | Water/Sanitary |
| 08/27/2026 | Permit Issued | Preferred Mechanical | Water/Sanitary |
| 03/17/2026 | Permit Issued | Par Plumbing Co | Gas, Water/Sanitary |
| 02/04/2026 | Permit Issued | Preferred Mechanical | Water/Sanitary |
| 04/24/2025 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 06/04/2024 | Signed-off | Preferred Mechanical | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/18/2026 | Permit Issued | Kleinknecht Electric Co | General Wiring |
| 08/05/2026 | Permit Issued | Adco Electrical | General Wiring |
| 05/09/2026 | Permit Issued | Five Borough Electric | 1 meters |
| 02/25/2026 | Permit Issued | Atlas-Acon Electric Service | — |
| 07/01/2025 | Complete | Atlas-Acon Electric Service | General Wiring |
| 04/18/2025 | Complete | Forest Electric | General Wiring |
| 04/18/2025 | Permit Issued | Jam Electrical | — |
| 04/18/2025 | Complete | Five Borough Electric | 1 meters |
| 03/18/2025 | Permit Issued | TF Electrical | General Wiring |
| 03/09/2025 | Permit Issued | Adco Electrical | General Wiring |
| 01/27/2025 | Permit Issued | TF Electrical | General Wiring |
| 11/11/2024 | Permit Issued | Adco Electrical | — |
| 07/16/2024 | Complete | Five Borough Electric | 1 meters |
| 03/15/2024 | Complete | Home Run Electric | — |
| 03/20/2023 | Permit Issued | Five Borough Electric | 1 meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | SJP Properties Company | Steel |
| 10/25/2024 | Signed-off | SJP Properties Company | Steel, Concrete |
| 07/06/2022 | Permit Issued | Western Waterproofing Company | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/23/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/29/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 09/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/23/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/23/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/23/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/26/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/27/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/16/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/26/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/28/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/30/2024 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 03/12/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/08/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/23/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/23/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/09/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/03/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/14/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 08/14/2026 | Heating Systems | ALEXIS SCHLESSINGERMAN | special |
| 08/14/2026 | Lighting controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/14/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/14/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/14/2026 | Interior lighting power | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/14/2026 | Duct leakage testing, insulation and design | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/14/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/14/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 08/07/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 08/07/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 08/07/2026 | Maintenance information | Ari Kamo | energy_progress |
| 07/31/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 07/31/2026 | Structural Steel - Welding | ALEXIS SCHLESSINGERMAN | special |
| 07/31/2026 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 07/31/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/31/2026 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 07/24/2026 | Final | JULIA MURPHY | progress |
| 07/24/2026 | Sprinkler Systems | Ari Kamo | special |
| 07/24/2026 | Lighting controls | Ari Kamo | energy_progress |
| 07/24/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 07/24/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 07/24/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 07/24/2026 | Final | Ari Kamo | progress |
| 07/24/2026 | Mechanical Systems | Ari Kamo | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Ducera Partners | Office | Floors 33, 34, 36 | Project M01418264 Project M00308716 Project M00308682 Project M00308736 |
| Proskauer | Office | Floors 11, 18, 19, 21–26, 30 | Project M01436034 Project M01345731 Project M01347659 Project M01347679 Project M01347694 Project M00599937 Project M00599980 Project M00600012 Project M00201689 Project M00200830 |
| Monopoly Clue | Office | Cellar, Floors 1–3, Mezzanine | Project M01184911 Project M01142982 |
| Bank of America | Bank / Financial branch | Floor 1 | Project M00963027 Project M00968602 |
| Microsoft | Office | Floors 4–6 | Project M00953237 Project M01159439 Project M01163816 Project M00700893 |
| Paige | Office | Floor 35 | Project M08054106 Project M08054197 Project M08054225 Project M08054057 |
| Moore Capital Management | Office | Floors 37, 38 | Project M00524729 Project M00524787 Project M00524820 Project M00524958 |
| CBRE Microsoft SDC | Office | Floor 6 | Project M00513586 |