| Owner | Filings | Most Recent |
|---|---|---|
| NG 645 MADISON AVENUE | 208 | 09/13/2026 |
| NAHLA CAPITAL | 1 | 07/15/2026 |
| KAJ NY CONSTRUCTION | 5 | 07/08/2026 |
| COLLIERS | 71 | 07/08/2026 |
| 18-20 22 EAST 46TH ST | 6 | 07/08/2026 |
| CBRE | 42 | 07/08/2026 |
| TITAN GOLDEN PROPERTY INVESTOR LLC | 5 | 03/22/2026 |
| A W R GROUP | 1 | 03/22/2026 |
| BLR MADISON LLC NIGHTINGA | 2 | 03/22/2026 |
| VANGUARD CONSTRUCTION AND | 4 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 04/29/2022 | $196.6M | — | — → — | $1,194/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| PCS ENGINEERING | 4 | 08/26/2026 |
| YOUN DESIGN CORP. | 4 | 08/25/2026 |
| TPG ARCHITECTURE, LLP | 1 | 07/08/2026 |
| WSP | 3 | 06/25/2026 |
| BUCKL ARCHITECTS NJ PC | 1 | 06/19/2026 |
| GGA STUDIOS, DPC | 5 | 04/24/2026 |
| DAVID STERN ARCHITECTURE | 4 | 11/26/2025 |
| KMB DESIGN GROUP, LLC | 1 | 11/25/2025 |
| ROBERT DERECTOR ASSOCIATES | 23 | 09/24/2025 |
| ENV ARCHITECTS, DPC | 7 | 09/16/2025 |
| KZ ENGINEERING, P.C | 2 | 08/23/2024 |
| GENSLER | 9 | 05/13/2024 |
| RJC Engineers | 3 | 05/03/2024 |
| LEON SKVIRSKY PE | 2 | 01/16/2024 |
| STRASS-MAGUIRE & ASSOCIATES INC. | 1 | 12/21/2023 |
| ASHRAF CORP | 2 | 11/07/2023 |
| ENTHINK ENGINEERS LLC | 3 | 10/13/2023 |
| PETER A. LEPTUCH P.E. | 2 | 07/30/2023 |
| KENNETH PARK ARCHITECTS | 1 | 07/28/2023 |
| STRATFORD ENGINEERING | 1 | 07/26/2023 |
| RAND ENGINEERING & ARCHITECTURE DPC | 1 | 03/14/2023 |
| FOGARTY FINGER ARCHITECTURE PLLC | 1 | 04/21/2021 |
| GREEN DESIGN | 2 | 08/03/2020 |
| SCALAR ARCHITECTURE PC | 2 | 10/03/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| KD DESIGNS | 1 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 8 | 03/21/2026 |
| MBE CODE ZONING | 50 | 03/21/2026 |
| RIZZO GROUP | 4 | 03/21/2026 |
| RIGGING CONSULTANTS | 4 | 03/21/2026 |
| DOMANI CONSULTING | 1 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| PROJECT TACTICAL SOLUTIONS | 13 | 03/21/2026 |
| EA DESIGN GROUP | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CJS INDUSTRIES INC | General Contractor | 15 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 12 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 12 | 07/08/2026 |
| PRIME RENOVATIONS & | General Contractor | 8 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 8 | 07/08/2026 |
| BIG APPLE PLBG CORP | Plumbing | 6 | 07/08/2026 |
| DEGENNARO III, CHARLES | Electrical | 4 | 03/21/2026 |
| O'CONNOR, MOXIE | Electrical | 4 | 03/21/2026 |
| BIG APPLE PLBG CORP | Fire Protection | 4 | 07/08/2026 |
| A W R GROUP INC | General Contractor | 4 | 03/21/2026 |
| BSM MAINTENANCE CORP | General Contractor | 4 | 03/21/2026 |
| CAPITAL IMPROVEMENT SERVICES | General Contractor | 4 | 04/09/2026 |
| GANNON CONTRACTING LLC | General Contractor | 4 | 03/21/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 3 | 07/08/2026 |
| WESBUILT CONSTRUCTION MAN | General Contractor | 3 | 07/08/2026 |
| KAJ NY CONSTRUCTION INC | General Contractor | 2 | 07/08/2026 |
| PHOENIX MEDICAL CONSTRUCT | General Contractor | 2 | 07/19/2026 |
| N Y SIGN ART | Scaffold | 2 | 07/08/2026 |
| P & D MECHANICAL CORP | Fire Protection | 2 | 07/08/2026 |
| ROYAL CONCRETE AND MASON* | General Contractor | 2 | 07/08/2026 |
| SENTINEL BUILDERS, LLC | General Contractor | 2 | 06/28/2026 |
| FINALY GENL CONTR CORP | General Contractor | 2 | 04/09/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 1 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 1 | 07/31/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PCS ENGINEERING | 3745 | 1 | 08/26/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 4 | 06/25/2026 |
| DOMANI INSPECTION SERVICE | 843 | 2 | 04/24/2026 |
| AK ENGINEERING PC | 678 | 6 | 11/26/2025 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 1 | 11/25/2025 |
| CODEGREEN | 510 | 4 | 09/24/2025 |
| FENAGH, INC | 6942 | 6 | 10/31/2024 |
| KZ ENGINEERING, P.C. | 4665 | 2 | 08/23/2024 |
| PROJECT TACTICAL SOLUTION | 5859 | 11 | 05/13/2024 |
| TROLYDIA TESTING & INSPEC | 4422 | 13 | 01/29/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 08/27/2026 |
| DOB NOW | Plumbing | Permit Issued | ALLIANCE PLUMBING CORP | 07/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PHOENIX MEDICAL CONSTRUCT | 07/17/2026 |
| DOB NOW | General Construction | Signed-off | EK EURO GROUP INC | 07/14/2026 |
| DOB NOW | General Construction | Permit Issued | PHOENIX MEDICAL CONSTRUCT | 06/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 06/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | ADVANCED PLUMBING LLC | 05/14/2026 |
| DOB NOW | Plumbing | Permit Issued | ADVANCED PLBG LLC | 05/14/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ANDAMIO SCAFFOLDING LLC | 05/07/2026 |
| DOB NOW | General Construction | Permit Issued | SENTINEL BUILDERS, LLC | 04/29/2026 |
| DOB NOW | General Construction | Permit Issued | ROYAL CONCRETE AND MASON* | 04/27/2026 |
| DOB NOW | General Construction | Permit Issued | CAPITAL IMPROVEMENT SERVI | 03/23/2026 |
| DOB NOW | General Construction | Signed-off | SENTINEL BUILDERS, LLC | 03/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 12/12/2025 |
| DOB NOW | Plumbing | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 12/10/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CAPITAL IMPROVEMENT SERVI | 12/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 12/02/2025 |
| DOB NOW | General Construction | Permit Issued | CAPITAL IMPROVEMENT SERVI | 11/25/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 11/03/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 10/28/2025 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 10/27/2025 |
| DOB NOW | General Construction | Signed-off | FINALY GENL CONTR | 10/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | FINALY GENL CONTR | 10/21/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 07/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ANDAMIO SCAFFOLDING LLC | 05/12/2025 |
| DOB NOW | General Construction | Permit Issued | ROYAL CONCRETE AND MASON* | 04/25/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 03/24/2025 |
| DOB NOW | Sprinklers | Signed-off | P & D MECHANICAL CORP | 11/07/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 11/04/2024 |
| DOB NOW | Mechanical Systems | Signed-off | WESBUILT CONSTRUCTION MAN | 07/17/2024 |
| DOB NOW | Plumbing | Signed-off | CM PLUMBING INC | 07/17/2024 |
| DOB NOW | Sprinklers | Signed-off | P & D MECHANICAL CORP | 07/17/2024 |
| DOB NOW | General Construction | Signed-off | WESBUILT CONSTRUCTION MAN | 07/16/2024 |
| DOB NOW | General Construction | Permit Issued | A W R GROUP INC | 06/26/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ANDAMIO SCAFFOLDING LLC | 05/14/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | CJS INDUSTRIES INC | 05/09/2024 |
| DOB NOW | General Construction | Permit Issued | CJS INDUSTRIES INC | 05/08/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | A W R GROUP INC | 03/26/2024 |
| DOB NOW | Plumbing | Signed-off | BIG APPLE PLBG CORP | 03/01/2024 |
| DOB NOW | Mechanical Systems | Signed-off | BSM MAINTENANCE | 02/09/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/25/2026 | Permit Issued | PHOENIX MEDICAL CONSTRUCT | Others | Other Anemostat ×4 |
| 04/24/2026 | Permit Issued | SENTINEL BUILDERS, LLC | Heating and Air Conditioning Systems | Heat / Cool |
| 09/24/2025 | Signed-off | FINALY GENL CONTR CORP | Heating and Air Conditioning Systems | Heat / Cool Florida Heat Pump CLO36 1,200 CFM · Wshp ×2 |
| 10/31/2024 | Signed-off | WESBUILT CONSTRUCTION MAN | Others | Other __Junk__ . ×2 |
| 05/13/2024 | Signed-off | JRM CONSTRUCTION MGMT LLC | Heating and Air Conditioning Systems | Heat / Cool Bosch EC120-3HZC-SLSBUA-XFGMXXXXX1XXXX1DXXXSBA 113,400 BTU · Wshp ×2 LM024-3HZC-FLSTUA-XFGMXXXXX7XXXX5XXXXSBA 19,300 BTU · Wshp ×1 |
| 10/05/2023 | Permit Issued | CJS INDUSTRIES INC | Associated Ducts and Piping | Ducts & Piping __Junk__ 0 ×1 |
| 07/30/2023 | — | — | Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | — |
| 04/24/2026 | Permit Issued | ADVANCED PLUMBING LLC | Sprinkler System |
| 09/15/2025 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 111 heads |
| 10/31/2024 | Signed-off | CMP PIPING INC | Sprinkler System |
| 05/13/2024 | Signed-off | ARCO PLBG AND HTG INC | Sprinkler System |
| 10/05/2023 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | CARDOZA PLUMBING CORP | Water/Sanitary |
| 04/24/2026 | Permit Issued | ADVANCED PLBG LLC | Water/Sanitary |
| 11/26/2025 | Permit Issued | DEPENDABLE MECH CORP | Water/Sanitary |
| 09/15/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 09/15/2025 | — | — | — |
| 10/31/2024 | Signed-off | CM PLUMBING INC | Water/Sanitary |
| 05/13/2024 | Signed-off | ARCO PLBG AND HTG INC | Water/Sanitary |
| 10/05/2023 | — | — | Water/Sanitary |
| 07/26/2023 | Permit Issued | BIG APPLE PLBG CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | Permit Issued | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 07/19/2026 | Permit Issued | APN ELECTRICAL CORP | General Wiring |
| 05/22/2026 | Permit Issued | INNER CITY ELEC'L CONTR'S | General Wiring |
| 11/25/2025 | Permit Issued | OPTIMAL ELECTRIC, INC | General Wiring |
| 12/09/2024 | Complete | TIKVAH ELECTRIC CO, INC. | General Wiring |
| 07/23/2024 | Complete | TITAN ELEC'L & ELEV CONTR | General Wiring |
| 01/25/2024 | Permit Issued | NEW YORK MECHANICAL | General Wiring |
| 11/07/2023 | Complete | JSP ELECTL CNTNG CORP | General Wiring |
| 10/06/2023 | Complete | JSP ELECTL CNTNG CORP | — |
| 05/23/2023 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 05/12/2021 | Permit Issued | A.T. ELECT'L CONSTR. CORP | General Wiring |
| 04/22/2021 | Complete | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 07/14/2020 | Complete | NJS ELEC'L SERVICES CORP. | General Wiring |
| 06/09/2020 | Complete | ZEREM ELECTRIC CORP. | General Wiring |
| 11/11/2019 | Complete | RX ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2024 | Signed-off | JRM CONSTRUCTION MGMT LLC | Steel, Concrete |
| 07/26/2023 | Signed-off | CJS INDUSTRIES INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2026 | Permit Issued | M & L SIGNS, INC | Suspended Scaffold (SC) |
| 08/23/2024 | Permit Issued | A W R GROUP INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/19/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/09/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/03/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/22/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/31/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/26/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 07/16/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/17/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/14/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/14/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/01/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/01/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/28/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/22/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/22/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/25/2026 | Post-installed Anchors | Michael Walsh | special |
| 08/25/2026 | Post-installed anchors in masonry | Michael Walsh | special |
| 07/02/2026 | Final | JAMES DOHERTY | progress |
| 06/16/2026 | Post-installed Anchors | Young Suh | special |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 06/16/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 06/16/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 06/16/2026 | HVAC-R and service water heating equipment | Young Suh | energy_progress |
| 06/16/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 04/20/2026 | Sprinkler Systems | Young Suh | special |
| 04/10/2026 | Final | JOHN MCMONAGLE | progress |
| 04/10/2026 | Sprinkler Systems | JOHN MCMONAGLE | special |
| 04/10/2026 | Final | JOHN MCMONAGLE | progress |
| 04/10/2026 | Mechanical Systems | JOHN MCMONAGLE | special |
| 04/01/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Michael Walsh | special |
| 02/18/2026 | Final | LESLEY SCHMERZLER | progress |
| 11/24/2025 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 11/24/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 11/24/2025 | Shutoff dampers | Ari Kamo | energy_progress |
| 11/24/2025 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 11/24/2025 | Maintenance information | Ari Kamo | energy_progress |
| 11/24/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 11/24/2025 | Post-installed Anchors | Ari Kamo | special |
| 11/24/2025 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| NYULangone | Medical / Healthcare | Floor 4 | Project M01389664 |
| ROC 360 | Office | Floor 18 | Project M01277602 Project M01277910 Project M01277614 Project M01277637 |
| Peter Millar | Retail | Cellar, Ground, Floor 1 | Project M00957934 Project M00957935 Project M00897055 Project M00897064 |
| IWC | Retail | Cellar, Floor 1 | Project M00923467 |
| Titan Golden Capital | Unknown | — | Project M08017148 |